action of the wind 中文意思是什麼

action of the wind 解釋
風力作用
  • action : n 1 動作,活動;行為,行動。 ★ act 指一次所作的行為;action 雖與 act 同義,但多半指某一期間內出現...
  • of : OF =Old French 古法語。
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • wind : n 1 風;大風,暴風;氣流;【機械工程】壓縮空氣。2 【航海】上風;風向;〈古語〉〈pl 〉方向。3 氣息...
  1. The blast wind has then effectively ceased and the direct destructive action of the air blast is over.

    爆震風已有效地停止了,於是空中爆震波的直接破壞作用就完結了。
  2. By simulating river plume evolution under the combined action of tide and estival wind field averaged over many years, we have found that the modeled salinity distribution is consistent with the observed one rather well, which means the river plume development plays an important role in adjusting the salinity distribution in the surface layer of bohai sea

    通過檢驗河流羽流在潮汐和渤海夏季多年平均風場共同作用下的發展特徵,發現計算得到的表層海水鹽度分佈與實測值相當吻合,因此可以認為河流羽流發展對于渤海夏季鹽度分佈起著重要作用。
  3. Departing from the action - oriented plots of his previous films nausica ? of the valley of the wind and laputa, castle in the sky, japan s most beloved animator, hayao miyazaki, provides a slower - paced, stunningly realistic portrayal of life in the countryside

    兩個小姊妹從此與貓玩成一片貓帶她們飛越夜空,種植幾分鐘便長成的巨型大樹,爬在樹幹上乘涼,而每當遇上困難,貓便是她們的救星
  4. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  5. The term ‘ perils of the seas ' refers only to fortuitous accident or casualties of the seas. it does not include the ordinary action of the wind and waves

    第7條「海上危險」術語僅涉及海上意外事故或災難。它不包括風浪的通常作用。
  6. Because the wind load is a random action, the statistical parameters of structural response under this load can hardly obtained beforehand. however these parameters is necessary to klaman filtering as the preliminary condition. if not ? ot, this signal processing cannot be called the genuine real time optimum estimation

    由於風荷載是一種隨機作用,結構在這種荷載的作用下,結構響應的統計參數不可能事先得到,而這種參數卻是kalman濾波的初始條件,也就不能實現真正的實時最佳估計。
  7. All the researched results prove the era method is steady and suitable for those structures : spacecraft 、 beam - plane structure 、 truss structure 、 frame 、 bridge, etc. on the basis of the consideration of the above, the major job of the article is to discuss how to identify the parameters of the long - span structure with the method of era under the action of the wind loads

    但是,國內外已有的相關文獻,對于下面的結構均進行了相關的研究,如航天器、梁板結構、桁架、框架、橋梁等。基於以上考慮,本文主要工作,就是探討在風激勵荷載作用下,如何用era演算法識別大跨空間網格屋蓋結構的模態參數。
  8. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  9. The force analysis of a ship single point moored under the combined action of wind, wave and tide

    風浪流聯合作用下單點系泊船的受力分析
  10. An experimental study on the mooring line forces amp; amp; impact forces of a moored ship under the combined action of wind, wave and current

    系泊船在風浪流作用下系纜力和撞擊力的試驗研究
  11. The co - action of wind wave and structures model tests of anti - typhoon wave ability of sea dike works the observation and analysis of wind and waves in reservoirs and ship wave in inland waterways

    風浪與建築物的相互作用,海堤工程和抗臺風性能的模型試驗;海岸、水庫風浪、內河航道航行波觀測及分析計算。
  12. It is formed by the action of wind and water on rocks over thousands of years

    它是由超過數千年的巖石經過風化和水的作用而形成的。
  13. But at present, the static performances of the double reticulated domes applied on the different load combination of wind load, snow load, live load, seismic load and dead load are not adequately studied. also the study on the dynamical response under seismic action is not sufficient

    但目前對于這類空間結構在雪載荷、風載荷、恆載荷、活載荷、地震載荷等各種載荷共同作用和各種載荷分佈方式下的靜力性能研究還不充分,特別是對其在地震作用下的動態響應的研究還不足。
  14. The results show that the aerodynamic stability of long - span suspension bridges is significantly influenced by the static wind action, whereas the spatial non - uniformity of wind speed and the cable ' s wind load have basically no influence on it

    結果表明:靜風效應對大跨徑懸索橋空氣動力穩定性的影響比較重要,但是風速空間非均勻分佈和纜索風荷載等因素對大跨徑懸索橋的空氣動力穩定性基本沒有影響。
  15. According to the theories of the energy dissipation of wave - water and sediment movement and based on the bottom sediment load formula developed by dou guoren, a formula to calculate the transport of the bottom sediment, which includes the bed load and part of suspended load, under the joint action of waves, tidal currents and wind - currents is derived

    摘要根據波動水流能量及泥沙運動原理,參考了竇國仁推導底沙輸沙量的方法,推導出波浪、潮流和風吹流共同作用下的底沙輸沙量(包括推移質和部分懸移質輸沙)計算式。
  16. By taking runyang bridge over the yangtze river as example, effects of some factors such as the static wind action, wind speed spatial non - uniformity, and the cable ' s wind load on the, aerodynamic stability of the bridge are investigated analytically

    以潤揚長江大橋為例,通過分析揭示了靜風效應、風速空間分佈的非均勻性以及纜索風荷載等因素對大跨徑懸索橋空氣動力穩定性的影響。
  17. The terrain effect force wind ' s speed reducing and wind ' s direction turning to left with contrasting the experiments of numerical simulation the text analyses the structure and microcosmic character of sea wind in zhoushan maritime space and consanguineous connection between sea wind and action of dynamical and thermodynamic. the task gets the result of case a by using t213 datum of weather center and contrasts it with the actual sea wind. the task establish a foundation in order to use this mode in the environmental forecasting

    通過數值模擬對比試驗,分析了舟山海域海面風的結構和微觀特徵,以及海面風與動力作用(復雜地形)和熱力作用(海陸熱力差異)之間的密切關系。進一步利用國家氣象中心提供的t213高解析度預報場檢驗海面風風場的數值預報效果,最後將其結果與實際觀測作比較,為將該模式投入環境(海流,海浪,風暴潮等)動力預報奠定基礎。
  18. To adhere to the realistically drawn comic - book action on which a man called hero is based, centro produced more than 500 digital effects shots to transform asian locales into turn - of - the - century america and to dramatize the powerful skills of the leading characters as they control natural elements such as water, fire, and wind

    為了更加貼近漫畫里的動作,先濤數碼特技有限公司在製作《中華英雄》時採用多於500個數碼特技的鏡頭去描繪從亞洲場景轉到19世紀與20世紀交接的美國的畫面,並表現出主要角色控制自然元素(如水、火、風)的超自然能力。
  19. First, the difference between the stm and utm is compared and analyzed. the results show that it can accurately simulate the unsteady flow process of piston wind and the pollutant distribution in tunnel after train left the tunnel, can analyze and calculate the good effect of inertial action of piston wind if using utm

    文中首先分析和比較了傳統隧道通風設計所採用的恆定流理論與非恆定流理論的差別,表明運用非恆定流理論不僅更能準確模擬隧道內活塞風的非恆定流動過程,而且能模擬列車通過隧道過程中隧道內污染物濃度的分佈,同時還能考慮利用隧道內氣流(活塞風)慣性作用促進隧道通風,節約通風能耗。
  20. Then, two aspects of energy conservation in tunnel ventilation system are attained. one is the lessening of pollutant length needed to be removed ; the other is using the inertial action of piston wind to remove pollutant

    然後,在滿足衛生標準的前提下,根據不同時刻隧道內污染物濃度分佈,得到在兩個方面會帶來隧道通風系統較大的節能,一是需要排除的污染段長度減少,另一方面是充分利用隧道內氣流的慣性作用排出污染物。
分享友人