adjacent construction 中文意思是什麼

adjacent construction 解釋
相鄰建造物
  • adjacent : adj. 1. 毗鄰的,鄰近的。2. (時間上)緊接著的。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The hanging wall of sag extended in southeast direction, with the tulage fault being the boundary fault. yinggete - bagemaode metamorphic core complex developed adjacent to northwest of chagan sag, which evolved from late jurassic to cretaceous with three - layer construction style. the kinematics mechanism of metamorphic core complex and chagan sag is a simple shear model, chagan sag extended and faulted as the metamorphic core complex rised

    在查干凹陷西北側發育英格特?巴格毛德變質核雜巖帶,可能具有三層結構模式,其形成與演化時代為晚侏羅世末?白堊紀;該變質核雜巖與查干凹陷的運動學機制為統一的簡單剪切模式;在變質核雜巖隆升的同時,查干凹陷發生伸展斷陷。
  2. The site was enlarged to include the adjacent former new astor hotel site and rezoned to " comprehensive development area 1 " on the draft tsim sha tsui ozp gazetted on october 17, 2003. revised master layout plan approved with conditions by the ctpur under the delegated authority of the tpb on june 23, 2004. construction in progress

    有關地盤的范圍被擴大,以便把毗鄰的前新雅圖酒店所在地(載於二零零三年十月十七日刊憲的尖沙咀分區計劃大綱草圖)包括在內;該范圍在該草圖上,亦已改劃為綜合發展區( 1 )地帶。
  3. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公路近水邊圍的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。
  4. Yinggete - bagemaode metamorphic core complex belt with three - layer construction is put forward, which evolved from late jurassic to cretaceous. the extensional simple shear model of the chagan fault depression is established. the tectonic evolution and the dynamics character of chagan fault depression and its adjacent mesozoic - cenozoic basins are discussed : at the end of triassic continental orogeny increased crust thickness crust uplift and denudation were happened ; jurassic was a period of local partly extensional collapse of erogenic belt and cretaceous was a period of widely extensional collapse of postorogenic erogenic belt ; cenozoic was a period of the development of stable intracontinental depression with the character of long distant collision response and weaked compression flexure

    討論了查干凹陷及鄰區中-新生代盆地構造演化及其地球動力學特徵,三疊紀(印支期)為陸內造山作用與地殼增厚、隆升剝蝕階段;侏羅紀(燕山早期)為造山後造山帶的局部伸展垮塌階段;白堊紀(燕山晚期)為造山期后大規模伸展垮塌作用與伸展盆地的發育階段;新生代(喜山期)為遠距離碰撞效應與弱擠壓撓曲性質的穩定大陸內坳陷的發育階段。
  5. The screw - shell of plug - fuse type fuseholders and the contact of a post - extractor fuseholder adjacent to the mounting surface ( unless the post - extractor fuseholder is of deadfront construction ) shall be connected to the load side of the circuit

    臨近盤面安裝的插拔式保險管座的擰動式外殼和柱狀拔出式保險管座的接頭應該接到電路的負荷端上
  6. This dissertation proposes an algorithm to solve the problem by constructing transition contours using active contour model. the algorithm considers the transition contours construction as a growing process, so it is based on higher layer knowlege and can ensure that transition contours are similar to trunk contours and branch contours, and also reconstructed transition surfaces at branch points are smooth. the contours are connected using adjacent contours synchronous marching algorithm

    採用基於全局的柱體生長法來判斷斷層間輪廓的相互對應關系;針對輪廓線表面重建中的難點問題?分叉問題,提出了一種基於主動輪廓模型的過渡輪廓構造方法,這種方法從物體主動生長這一角度出發考慮過渡輪廓的構造,能夠產生綜合兩斷層上輪廓特徵的過渡輪廓,是一種基於全局性高層信息的有效輪廓構造演算法;利用相鄰輪廓線同步前進法進行輪廓拼接。
  7. Construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o were substantially completed in july

    大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,已於二零零二年七月大致完成。
  8. Reclamation, road and drainage works at yung shue wan on lamma island are also in progress. construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o is scheduled for completion in early 2002

    南丫島榕樹灣的填海、道路及渠務工程也在進行。大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,預定在二零零二年年初完成。
  9. Xiyuan hotel is close to the ministry of state planning committee, finance and construction ministries, adjacent to the government negotiation centre, the capital exhibition centre, and situated near the new financial street and electronic zone at zhong guan cun

    距著名的北京動物園紫竹院公園僅1公里,步行便可到達也是通往頤和園香山等著名風景區的必經之路,乘車只需20分鐘,是您在京旅遊的首選飯店。
  10. Pile cap construction at grid 2 adjacent to slip road from tuen mun road

    于屯門公路入口之二號位建造樁頂
  11. The works include the complete civil, structural, geotechnical, architectural, mechanical, electrical, and environmental work incorporating the detailed design, construction, and start - up including site work, demolition, underpinning and other protection work for adjacent structures, all necessary temporary traffic diversions, and utilities diversions, restoration and reconstruction work

    工程包括全面的土木、結構、土力、建築、機械、電力及環境工程,結合詳盡的設計、建造及動工,包括工地工程、拆卸以及毗鄰構築物的支承結構及其他保護工程,所有必要的臨時交通改道、公用設施轉駁、修復及重建工程。
  12. The paper makes the analysis of an engineering accident of the cracking of adjacent existing buildings caused by surface subsidence from groundwater lowering during the construction of large diameter dig - hole piles, finds out the cause, presents the treatment scheme and effectively guarantees the smooth conducting of the project

    該文對由於大口徑人工挖孔樁施工降水引發地面沉降,造成鄰近建築物開裂的工程環境事故進行了分析,查明了原因,並提出了治理的方案,有效地保證了工程的順利進行。
  13. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  14. These measures mainly consist of guiding and encouraging the taxi whose service lifetime already expired in whole city to be upgraded to the single fuel or double fuel natural gas auto ; guiding and encouraging the diesel oil bus of medium and short distance to be refitted for the single fuel diesel oil natural gas bus ; guiding and encouraging the sanitation vehicle, municipal vehicle to be refitted for the natural gas vehicle ; taking measures to accelerate the construction of natural gas station further, forming the rational natural gas station network distribution between the inner - city, main city zone and district, city along with the country as well as the adjacent province and city

    被稱為「千里眼」的電子站牌當車通過顯示屏時,乘客可以清晰地看到走在最前面那趟車正逐步向自己所處的這個站臺靠近。車離站臺還有多遠,何時會到站,一目了然。之所以在人民路上試點「千里眼」 ,專業人士解釋因為人民路有公交專用車道,只有這樣的城市道路才有條件安裝「千里眼」 。
  15. Mechanical behavior investigation of the tunnel construction in metro line no. 5 adjacent to yuting bridge in beijing

    北京地鐵五號線近接玉蜒橋施工的力學行為研究
  16. Civil engineering contractors : refer to the manufacturers registered at and licensed by the municipal or county ( city ) competent authorities to operate small - scale comprehensive construction and repair works in the local and adjacent areas

    五土木包工業:系指經向直轄市、縣(市)主管機關辦理許可、登記,在當地或毗鄰地區承攬小型綜合營繕工程之廠商。
  17. Adjacent to the tait co., it was one the warehouse of tait co. in the beginning. considering the bricks were gotten from anping fort for the construction of this house, it might be built between the end of 19 century and the beginning of japanese colonization. to be a warehouse of japanese salt company

    隔壁,最初為洋行倉庫,從砌墻古磚推取自熱蘭遮城紅磚,及門楣花崗石、窗框基石與木屋架構判定,推測最早應建於十九世紀末及日治初期,作為大日本鹽業株式會社出張所倉庫,現況規模即為日本人增建。
  18. Kaying hotel four - star hotel in accordance with international standards of hotel construction in guangzhou financial, commercial pool of dong, chuang overpass adjacent areas

    嘉應酒店是按照國際酒店四星級標準建築的酒店,位於廣州金融商業匯集的環市東路上,區莊立交橋旁邊。
  19. The approximately 807, 000 square - feet grade - a office complex project in futian central district is under construction with completion currently scheduled for the fourth quarter of 2007. in may 2006, the group acquired another site adjacent to this project, which is planned for an approximately 850, 000 square - feet office property development

    於二零零六年五月,本集團于福田中心區購入另一幅毗鄰上述項目之地塊,計劃發展總樓面面積約850 , 000平方尺的辦公室物業。
  20. Construction of new premises adjacent to existing facilities has already been completed. equipment installation and trial run is scheduled for the end of this year

    毗鄰現有廠房的新大樓已建成,本年底將會進行設備安裝及試產。
分享友人