adjusted river 中文意思是什麼

adjusted river 解釋
經整治的河道
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  1. This is serve to inform that the currency adjustment factor ( caf ) would be adjusted as below for shipment originated from china, hong kong, shenzhen and pearl river region ports to europe & mediterranean destinations, with effect from 1st november, 2007 ( against bill of lading )

    根據目前最新市場情況,中海集運華南攬貨片區決定自2007年11月1日起(以提單裝船日為準)調整11月份歐洲/地中海航線的caf ,收費標準如下。
  2. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  3. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯流理論和水動力學方法預報太湖及重要節點水位,首次在平原河網地區建立了具有實時校正功能的全流域預報調度系統。以適合太湖流域復雜的水力條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  4. After the hydraulic project of the three gorges of the yangtze river is completed, the water level in front of the dam of the three gorges reservoir area will be raised from the now several tens of meters to 175 meters. furthermore, because of the needs of preventing floods, the water level of reservoir area will be adjusted periodically between 175 meters and 145 meters every year. this will inevitably cause the revival of part ancient landslides and the formation of new landslides, which will definitely influence the urban construction, the traffic transportation, the people ' s life and property security, etc. in the three gorges reservoir area

    長江三峽水利樞紐工程建成蓄水后,庫區壩前水位將由現在的幾十米海拔高程提高到175m ,且由於防洪的需要,庫水水位每年還將在175m與145m之間進行周期性調節,這無疑將導致部分古滑體的復活和新滑體的產生,結果勢必會對未來三峽庫區范圍的城鎮建設、交通運輸、人民生命財產安全等造成一定的影響。
分享友人