air-steam 中文意思是什麼

air-steam 解釋
蒸汽空氣的
  • air : n 1 空氣,大氣。2 天空,空中。3 微風,和風。4 態度,樣子,風度,氣派;〈pl 〉高傲的架子。5 傳播,...
  • steam : n 1 蒸汽,水蒸氣,水氣,霧,蒸氣壓力。2 〈口語〉精神,精力,氣力;怒氣。3 輪船,乘輪船旅行。vi 1 ...
  1. Maybe because of the frost of winter, white steam from an open - air bath soars into the air, and what you can see beyond that steam is just the absolute view of the great nature

    這是一處遠離都市喧囂,深藏在被大自然包圍的山坳里的溫泉中心。冬季因氣候寒冷,露天溫泉上方漂浮著白色的水霧,這一切都是大自然所賦予的。
  2. Magic air bed bj - 9012 steam tiger bj - 9117 steam master pro

    Bj - 9012老虎蒸氣清潔機
  3. Weiss kessel anlagen maschinenbau gmbh is well - known not only in dillenburg with silos of steel, vertical - tube radiant boilers and boiler plants as well as with long - distance heating plants, dust extracting installations and combustion chamber boiler, but also with further offers, like thermal oil, heat plants and / or mechanical boiler furnaces, air and dust extraction technology and steam boilers and steam generators

    Weiss kessel anlagen maschinenbau gmbh是一家生產不同尺寸燃燒室,除塵裝置,遠程供熱裝置,鍋爐設備,熱油,鋼板結構青貯塔,立管鍋爐,熱設備,蒸氣鍋爐和蒸氣機,機械燃燒鍋爐,空氣-除塵技術的企業。
  4. Explains : the producer gas generator product explains our company designs the manufacture producer gas generator, is take the air and the steam as vaporization medicinal preparation, production combination gas advanced equipment

    說明:我公司設計製造的煤氣發生爐,是以空氣和水蒸氣為氣化劑,生產混合煤氣的先進設備。
  5. When “ holding ” ( during normal operation ), non condensable, which are coming from air ingress and oxygen content in steam and condensate, must also be extracted normally by main ejectors

    當「建立真空」 (正常操作下)時,空氣入口處的不可凝結物和蒸汽中的氧含量以及凝結水必須由主抽汽器排出。
  6. Performance test code for steam - operated air ejectors

    射汽抽氣器性能試驗規程
  7. Series of guowei dry - method composite machines as new product are explored with our many years ' experience, the requirement of the users. the first metal of this machine is adopted with : photo - ecectricity auto. tracking " correcting deviation equipment, magnetic powder tension control. pneumatic back pressure shifting blade, oven temperature controlled qutomatically, big roll with oil heating, coating composite pneumatic control as well as double frequency governor etc. it will make the machine with fast speed, lower voice, low polluted by air, shout consumptionfor energy, stable working etc. especially suitable for al - foil with smooth surface and no enough firming, glass paper, polyester ect. the composite material with hard strength, fireproof, anti - ventilation, anti - fatty, frozen, dudrable steam etc character. it is widely used in food, pharmacy, as well as daily articles to package

    「國偉」 、系列乾式復合機,是我廠根據多年的復合機製造經驗及結合客戶需求,開發的新產品,該機第一基材採用了「光電自動跟蹤」糾偏放卷裝置,磁粉張力控制、氣動背壓移動式刮刀、烘箱溫度分段自動控制、大輥筒導熱油加熱、上膠復合氣動控制及雙變頻調速技術,使該機具有復合速度快、噪聲低、空氣污染小、能耗低、運行平穩等特點,適宜於表面光滑的鋁箔玻璃紙聚酰胺等與聚乙烯、聚丙烯等薄膜的復合,復合薄膜具有強度高、防水、防透氣、防油脂、可冷凍、蒸煮等優點,廣泛應用冷凍食品、乾燥食品、醫藥品及日用品的包裝。
  8. We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful

    綜合分析認為: ( 1 ) 、這次冷渦在其發生發展過程中,其移動路徑是沿經圈直線南壓,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太平洋副熱帶高壓偏北位置與東北冷渦南壓形成的急流軸,把源源不斷的西南暖濕氣流輸送到遼西地區,也就是急流軸的左前方位置,為這次暴雨的產生提供了充足的水汽來源; ( 3 ) 、低空急流不但為暴雨輸送水汽,其造成的較強的垂直環流也是產生強降水的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀測誤差可能造成的積分不穩定,提高了模擬結果的參考價值。
  9. Some changes are needed in the configuration of the plant to reflect the changes that have occurred on the site, primarily that both the hydrogen recovery plant that was fed with purge gas and supplied instrument air and the site auxiliary boilers that provide low pressure steam have been dismantled

    裝置布局發生了一些變化,主要的兩項就是拆除了氫回收裝置和輔助鍋爐,氫回收裝置消耗吹掃氣和儀表空氣,輔助鍋爐曾經用來提供低壓蒸汽。
  10. In the third, this paper makes a survey on components of the exhausted flue gas and waste heat resource, and discusses the possibility and methods of steam generation and air preheating with the waste heat. and then, the analysis on the advantages and disadvantages of heat recovery plants with conventional steel - water heat pipes and inorganic heat - transfer heat pipes is carried out. the paper also gives a valuation about the plan and features of the design of heat recovery

    對余熱源排煙的成分和余熱資源量進行標定,討論余熱回收產生蒸汽或加熱燃燒用空氣的可行性和方法,分析常規余熱回收技術設計、採用普通鋼-水熱管和無機傳熱熱管等傳熱元件的設計余熱回收裝置的優缺點,並對余熱回收設計方案及其特點進行總體評價。
  11. According to the question of using natural cooling will prolong the period of opening cylinder for overhaul, we expound three modes for the steam turbine quickly cooled after being stopped, these are vacuum and aeration - cooling, pressure - air cooling and steam 1ing, then analysis and contrast them

    摘要針對汽輪機採用自然冷卻方式會延長機組檢修開缸時間的問題,提出了汽輪機停機后的三種快速冷卻方式:抽真空通汽冷卻法、壓縮空氣強迫冷卻法和蒸汽冷卻法,並對這三種方式進行了比較和分析。
  12. The heat source may be steam, heat conduction oil, electricity or coal ( oil ) hot air furnace

    熱源可採用蒸汽、導熱油、電或燃煤(油)熱風爐配套。
  13. Under special conditions such as low partial load / deep vacuum, unexpected high air leakage resulting in a major temperature difference ( above 10 c ) between the steam exhaust turbine temperature and all air - take off temperature measurement, the suction capacity can be improved by using 2 main ejector simultaneously

    在特殊條件如局部低載荷/極端真空,不正常的熱交換,意想不到的高空氣泄漏導致的在蒸汽排氣溫度和抽空溫度測量上產生的嚴重溫差( 10 c以上) ,用兩臺主抽汽器同時工作可以提高抽氣量。
  14. The new developments of htm station technique were introduced from the aspects such as changing the htm pipeline type in pet htm station, increasing the switch forms of steam atomization and compressed air atomization, increasing the steam generator, sending stripping tower off - gas to combination and using new material nd steel in air preheater

    摘要從改變聚酯熱媒站的熱媒爐熱媒管線形式、增加蒸汽霧化與壓縮空氣霧化的切換形式、增加蒸汽發生器、汽提塔尾氣送燒、空氣預熱器採用新型材質nd鋼等方面介紹熱媒站技術的新發展。
  15. Suitable for measuring the infernal temperature such as air, steam, liquids, etc. sheath maerial of probe is stainless steel

    適用於測量流動的物質,例如:空氣、蒸汽、液體等內部溫度,探桿的鎧套為不銹鋼。
  16. In 1999, the dipole existed in between the okhotsk high and the depression in the north of northeast china, thus the okhotsk high became active and maintained, the subh was located to an area quite further south than usual. the high persisted in the east region of nw china, the cold air flowed to the mid - lower reaches of the yangtze river along the high. in the east region of nw china, air steam under troposphere was strong sinking motion, and formatted the negative vorticity region, the vapour flux divergence was divgence. lt was apparently that the rain could n ' t occur in the eastern portin of nw china. in 2000 year, okhotsk high was very weak or did n ' t exist in, there was high in the east asia - japan, the subh is located to an area further north than usual. in the east region of nw china, the trough maintained, air stream under troposphere was strong ascending motion, the cycolonic circulation was prevailing, the vapour flux divergence was intensive convergences the rain easy happened in the east areas of northwest china

    4多梅雨1999年鄂霍茨克海阻塞高壓與我國東北北部低壓形成偶極子,使得阻塞高壓穩定少動,西太副高位置偏南,西北地區東部持續受高壓控制,冷空氣沿此高壓流經長江中下游地區上空;在西北地區東部對流層中下層氣流下沉運動較強,呈反氣旋渦度,水汽通量散度輻散,不利於西北地區東部降水。空梅雨2000年相反,鄂霍茨克海高壓減弱甚至不存在,東亞-日本為高壓,西太副高位置偏西偏北,西北地區東部處于西風槽中,對流層中下層氣流上升運動增強,盛行低壓環流,水汽通量散度強烈輻合,有利於降水生成。
  17. Guide for the procurement of power station equipment - boiler auxiliaries - gas - air, steam - air and gas - gas heaters - gas - air, steam - air and gas - gas heaters

    發電站設備采購指南.鍋爐附屬設備.煤氣空氣蒸汽空氣和煤氣煤氣加熱器
  18. Guide for procurement of power station equipment - part 4 - 2 : boiler auxiliaries ; gas - air, steam - air and gas - gas heaters ; german version en 45510 - 4 - 2 : 1999

    電站設備購置指南.第4 - 2部分:鍋爐輔助設備.煤氣空氣
  19. Guide for procurement of power station equipment. part 4 : boiler auxiliaries. section 2 : gas - air, steam - air and gas - gas heaters

    電站設備的采購指南.第4部分:鍋爐輔助設備.第2節:氣體-空氣蒸氣空氣和氣體氣體的加熱器
  20. Catalytic gasification of biomass with air - steam to produce hydrogen

    水蒸氣催化氣化制氫技術
分享友人