anchor pile 中文意思是什麼

anchor pile 解釋
錨定樁
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將錨索視為彈性絞支座,利用抗滑樁和錨索位移變形協調條件,計算出不同樁底條件下抗滑樁的內力分佈。
  2. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    樁錨支擋結構體系是重慶地區經常採用邊坡支護形式之一,長期以來,人們認為樁錨支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過錨桿把力傳遞給穩定地層。
  3. Calculating method of anchor jacked pile while sinking

    錨桿靜壓樁擠土效應的計算
  4. Working mechanics and applications of anchor static jacked pile

    錨桿靜壓樁工作機理及應用
  5. Abstract : this paper introduces four typical light - retaining structures. they are frame girder with prestressed anchor ropes, antislide pile with preslressed anchor ropes, anchored nelwork with jetting concrete and retaining wall with root piles. these structures are successfully applied to the national highway no. 107 in guangdong province

    文摘:以國道107線清連一級公路上四個典型的邊坡病害治理工程為例,介紹預應力錨索格構梁、預應力錨索抗滑樁、錨噴掛網支護、樹根樁擋土墻等輕型支擋結構在公路邊坡病害治理工程中的應用
  6. In order to find out an economical, practical and reliable supporting method, some relevant technical personnel and i, based on successful experiences and project instances, designed the pre - stress anchor board supporting system, which is to exert pressure on the anchors and to independently support slopes. this system has successed and replaced the pile - anchor supporting system used in past

    為探索一種經濟、實用、可靠的支護方法,結合一些成功的經驗和工程實例,筆者與有關技術人員一起設計了預應力錨板墻支護技術,在錨桿上施加預應力,主動、獨立支護邊坡,取代了過去了常用的樁?錨支護體系,並實施成功,成為島城近年來深基坑支護主要技術之一。
  7. Permanent prestressed ground anchor systems pile

    永久性預應力地錨樁基系統
  8. First scheme is cantilever anti - slide pile with drain system ; the other scheme is pre - stress anchor rope anti - slide pile with drain system

    方案一為採用懸臂抗滑樁加排水措施;方案二採用抗滑錨樁加排水措施。
  9. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  10. ( 5 ) the software combines anti - slide pile with anchor wire anti - slide pile, apply the matrix analyses method to design anti - slide pile. and 3 anchor wires on the anti - slide pile

    ( 5 )軟體將普通抗滑樁與錨拉抗滑樁進行有機地結合,抗滑樁設計採用矩陣分析法,錨拉樁設計可考慮3排錨索。
  11. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力錨索的內力計算方法進行分析。
  12. ( 6 ) the thesis puts forward the pile - top displacement control method, and it can account the least force of the anchor wire on anti - slide pile

    ( 6 )本文提出了錨拉抗滑樁錨拉力計算的樁頂位移控製法,計算控制樁頂位移所需的最小錨拉力。
  13. In gravel stratum, the method combined soil nails and anchor pile is adopted in deep foundation pit bracing, it can obviously cut down engineering cost, raise efficiency and shorten construction period

    在卵礫石地層中,採用土釘和錨桿樁聯合支護技術進行深基坑支護,節省工程投資,提高工效,縮短施工工期。
  14. In terms of its stability and present situation, we took the complex measurements of drainage, and do away with soil, and sustain and compared common pile with prestressed concrete anchor pile in our sustain

    依據滑坡現狀及穩定性分析評價,確定了排水、清方減載、支擋相結合的綜合整治方案,並對整治方案進行了詳細介紹。
  15. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和錨固層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,錨索採用的是具有初始應力的連續桿單元模擬。
  16. Secondly, compared with specification jgj 120 - 99, the problem of method which be using was pointed out base on a great number of numerical simulation, the interaction between pile - anchor supporting and soil nailing was analyzed

    其次,針對現行樁錨復合土釘支護設計方法,在大量數值模擬的基礎上,通過與規程進行對比,指出現行方法中存在的一些問題,並分析了土釘支護與樁錨支護二者之間的相互作用。
  17. Quality control for the construction of anchor pile and pile embedded in rock of phase two project of yantian port

    鹽田港二期工程錨碇樁和嵌巖樁的施工質量控制
  18. On performance of anchor pile in reinforcement of stratified rock cut

    樁加固順層石質路基工作性狀的研究
  19. Abstract : the traditional method of anchor pile on the deep foundation pit bracing in the gravel stratum with high hardness, poor drilling and easy slump is complicated owing to difficult construction, low efficiency and high cost

    文摘:卵礫石地層硬度大,可鉆性差,易坍塌,這種地層的深基坑支護若採用傳統的錨桿樁,施工難度大,工效低,工程造價高。
  20. Application study on combined foundation pit support with composite soil nail and anchor pile

    復合土釘與樁錨聯合支護的應用研究
分享友人