anchor pull 中文意思是什麼

anchor pull 解釋
錨定拉力
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • pull : vt 1 拉,拖,牽,曳 (opp push); 勒(馬)。2 拽住;扯破,扯開。3 拔去(雞等的)毛;拔(牙齒、瓶...
  1. This kind of adglutinate mixed with u expansion admixture can grip anchor bolts tightly even underwater, as can be seen from the pull - out type tests for anchor bolts when the mortar age is over 10 days. ( 2 ) the author lays the supporting piles as a arched shape

    將摻加了u型微膨脹劑的砂將作為錨桿水下膠結物,由錨桿齡期10天的抗拔試驗結果可以看出,這種膠結物的握裹效果很好。
  2. The pull rod is screwed into the inside thread of the anchor head.

    將拉桿旋入錨頭內的絲扣。
  3. Standard test method for rock bolt anchor pull test

    石栓錨定拉力試驗的標準試驗方法
  4. Application of the point reaming technique to the pull - out anchor

    定位擴孔技術在抗拔錨桿中的應用
  5. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙錨固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  6. Development of pull testing system for anchor bolt

    錨桿拉力測試系統的設計
  7. We ' ll pull into this inlet and drop anchor

    我們要在附近的海彎下錨
  8. In our country, no pull - out test of pressure - type anchor has ever been made in rock till now. in chapter 4, consulting some pull - out tests of pressure - type anchor made by some civil researchers, contrast pull - out tests of pressure - type and tensile - type anchor in rock is designed in crag slope engineering in chongqing university

    本文第四章在在參考國內一些單位已經進行的部分壓力型錨桿抗拔試驗的基礎上,針對基於巖層的該類型試驗還是空白的現狀,結合重慶大學沿江危巖邊坡治理工程設計了巖層中的壓力型錨桿與傳統拉力型錨桿抗拔力對比實驗。
  9. By the test of anchor cable pull - out intensity, research is carried on anchor capability, stiffness coefficient and prestress losses of anchor cable in reinforcing similar soil slopes. the mechanisms of reinforcing similar soil slopes by prestressed anchor cable sash ( beam ) are studied by the method of combination of field test, theory analysis and numerical simulation, as a result, the calculational pattern of internal force of anchor cable sash ( beam ) is put forward

    本文通過大量野外調查,提出類土質邊坡的概念,並分析了它不同於一般粘性土邊坡的特性;通過錨索抗拔試驗研究了類土質邊坡的錨固力大小、錨索剛度系數和錨索預應力損失情況;通過現場試驗、理論分析和數值計算相結合的方法,研究預應力錨索框架(地梁)加固類土質邊坡的機理,提出預應力錨索框架(地梁)的內力計算模式。
  10. According to calculating and analysis, educes the distributing laws and their correlations of horizontal displacement and stress of stabilizing pile, anchor pull and earth press in two sides of pile, including the distributing of point repel force and internal force of pile at the terminal state, providing full theoretical basis for anchor cable and stabilizing pile structure design, strength check, stability check and determination of anti - slide force for a single stabilizing pile

    通過計算分析,得出了抗滑樁的水平位移、樁身應力、錨索拉力和樁側土壓力的分佈規律和它們之間的相互關系以及極限狀態時的樁的結點抗力和樁的內力分佈規律,為錨索樁的結構設計、強度校核、穩定性校核和單樁抗滑力的確定提供了充分的理論依據,同時也提出了錨索抗滑樁計算分析的一種新方法。
  11. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  12. For rubber dam project is of simple structure and easy to operate, while having low requirement for the plate of the foundation, thus the key to rubber dam technology is the dam bag ' s anti - pull intensity, circum - oriented relative extending rate, internal pressure ratio, anchor structure as well as operation procedure

    由於橡膠壩工程結構簡單、施工方便,對基礎底板的要求不高,因此橡膠壩技術的關鍵在於壩袋的抗拉強度、環向相對伸長率、內壓比、錨固結構型式,以及施工工藝等。
  13. The pressure - type anchor rods are designed by ourselves through study some reference documents. the p ~ s curves are gotten. loading transmission characteristics of pressure - type anchor and tensile - type anchor are compared through the study of pull - out tests of those two types

    在參考文獻的基礎上自己設計製作了壓力型錨桿桿體,在試驗中得到了相關的p s曲線,比較了兩種錨桿的荷載傳遞性狀,探討了影響壓力型錨桿承載力的因素。
分享友人