anchor station 中文意思是什麼

anchor station 解釋
定泊站
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  2. It is understood that the sewage from the wkcd would be discharged to the anchor street sewage pumping station ( sps )

    據知,西九龍文娛藝術區的污水會排放至晏架街污水泵房。
  3. The design flow capacity of the anchor street sewage pumping station is 3138 litres per second and the assumed peaking factor would be 3

    晏架街污水泵房的設計泵水量是每秒3138公升,而假設的峰值因數是3 ;
  4. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  5. Yg - 80a construction drilling rig is a full hydraulic operated top drive power head drill. it is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes

    Yg - 80a型錨固工程鉆機是在yg - 80鉆機基礎上研製的,科學分配鉆機性能參數,使鉆機更適合巖石潛孔錘鉆進跟管鉆進,同時兼顧土層合金回轉鉆進螺旋鉆進工藝。
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. Application yg - 30 construction drilling rig is used for drilling anchor holes in deep base pit of high building, anchor and reinforce side - slope for water conservatory project, water power station project, railways and highways

    Yg - 30型工程鉆機適用於高層建築深基坑錨固水電工程鐵路公路錨固護坡,尤其適用於高邊坡治理錨桿孔,排水孔的施工。
  9. The typical pronunciation for that station on the u. s. capital ' s metro trains is “ la - font plaza, ” but mcmillon, a former television and radio anchor, stressed the french pronunciation, with no final “ t ” sound : “ lohn - fon plaza

    這個美國首都的地下鐵車站的站名經常被念成拉芳特廣場,但曾任電視與廣播主播的麥克米倫強調,該字的法文發音結尾沒有t的音,應該念成隆鳳廣場。
  10. It is used to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, as well as drainage holes

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  11. At first, the author has analyzed the destroy style and mechanism of blasting, studied various factors which influence on the effect and supporting design of rock anchor beam of underground hydroelectric power station

    在首先分析爆破機理的基礎上,探討並確定了影響地下廠房巖錨梁爆破開挖成型質量和穩定性的各種因素。
分享友人