aseismatic construction 中文意思是什麼

aseismatic construction 解釋
抗震措施
  • aseismatic : adj. 耐震的。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Article 19 all construction projects shall be designed in compliance with the requirements for fortification against earthquakes and in conformity with the standard aseismatic design and shall be constructed in accordance with the design

    第十九條建設工程必須按照抗震設防要求和抗震設計規范進行抗震設計,並按照抗震設計進行施工。
  2. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、灰渣築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平的成果。
  3. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  4. Key construction project and likelihood happen serious and secondary the construction project of calamity, must undertake seismic security is evaluated ; the result that evaluates according to seismic security, decide aseismatic fortify asks, undertake aseismatic fortify

    重點建設工程和可能發生嚴重次生災難的建設工程,必須進行地震安全性評價;並根據地震安全性評價的結果,確定抗震設防要求,進行抗震設防。
  5. The feasible study of xiaowan double curved arch - dam aseismatic analysis resulted, there are internal partly high stress in the dam at basis situation, in earthquake response and in the construction. the structure shoud be modified to meet the need of low stress

    可研階段的抗震分析計算結果表明,在基本工況和地震特殊工況及施工期,壩體局部存在較高的應力與不利分佈,有必要進一步改善體型和結構布置以降低壩體應力水平。
分享友人