balance pipe 中文意思是什麼

balance pipe 解釋
均壓管
  • balance : n 1 〈常作 a pair of balances〉 天平,秤。2 平衡,均衡,對稱;抵消;比較,對照,對比。3 (鐘表的...
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  1. The paper mainly consider the followings : the performance parameter determination of cryopump, heat load determination and heat transfer of large cryopanel, reasonable distribution of heat load, the condition for construct steady flow in small vertical circle pipeline, balance condition for gas and liquid two - phase flow in the connection pipe between cryopanel and dewar, the safety of cryopump

    文中探討了低溫泵性能參數的確定;大抽速低溫抽氣面的熱負載的確定及合理分配;冷凝面上豎直圓管內受熱建立穩定流動的條件;冷凝面與杜瓦間的連接管道內氣液「雙相流動」的平衡條件;低溫泵系統運行的安全問題。
  2. It has the remarkable characters of the limited recourse or without recourse and financing besides the balance sheet. it can avoid the trouble to get the domestic credit and to finance from the international capital market for the capital - intensive project. so it has much attraction for these large - scale projects of infrastructure of power plant, highway, railway, airport, water plant and the long distance transmission pipe, etc. which urgently needs to invest and at the same time be limited by the shortage of the capital

    Bot投資方式具有項目融資的典型特徵, bot項目是項目融資的一種特定方式,它具有有限追索權或無追索權和資產負債表外融資等顯著特徵,可以避開國內信貸的困難,從國際金融市場上為資本密集型投資項目籌集資金,因而對于亟需加大投入、而又受到資金短缺制約的電廠、公路、鐵路、機場、水廠及長距離輸水管道等大型基礎設施項目具有很大的吸引力。
  3. Application of tracking down a leak out of the pipe net of water balance test methods in fujin city

    水量平衡測試法在富錦市供水管網檢漏中的應用
  4. Fluid network was divided into a lot of independent loops. through changing states of valves, i got pipe flux and pipe pressure drop. based on pressure balance equation, i built the differential equation system, solved the differential equation system, and acquired resistance coefficients of pipes and component

    並將流體網路圖分解為一個個獨立迴路,通過改變閥門的狀態,來獲取迴路各管段流量和壓力損失,根據迴路壓力平衡方程,建立方程組,對方程組進行了求解,解出了各未知管段、流體器件的阻力系數。
  5. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    現場測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入試驗、管道內力變化、管土接觸應力變化以及頂管施工現場記錄(包括頂力、土壓力、平面偏差、高程偏差等) 。
  6. Taking advantage of the abundant local iron ore and coal materials, the iron pipe factory pipe fitting factory and cast iron factory, in order to meet the local market demand, developed products of four series with 300 items. these items are divided into two categories, mainly centrifugal cast iron pipe, pipe fittings, stainless steel joints and clamps, art - enclosure, seamling steel pipes, manhole, covers and balance weight iron

    煉鐵廠鑄管廠和管件廠根據市場需求和當地豐富的優質生鐵煤炭資源優勢,形成一條的生產優勢。開發出四大系列三百多個品種的產品,分灰口鑄鐵和球墨鑄鐵兩大類,主要有離心鑄管管件井蓋配重鐵等。
  7. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  8. To get the goal, the paper detailed presents the two types different pipe jacking building technology and site test about the bigger caliber steel pipe in the course of pipe jacking by engineering example ; propose the concrete way of improving and perfecting the new technology in the air - power pipe jacking ; make progress on applicability and spreading in use on pipe - jacking ; detailed indicates the earth - pressure balance theory and handling technology on the key technology of pipe jacking which supply reference to pipe jacking construction in shanghai areac

    鑒于以上目的,本文通過工程實例對兩種不同類型的頂管施工技術及大口徑鋼管頂進過程中的原體測試進行了詳盡的介紹。提出了氣動頂管新技術的改進、完善的具體方法,加大了其實用性及可推廣性;詳細闡明了土壓平衡理論、頂管施工關鍵點的處理技術,對相關施工,特別是上海地區的頂管施工,提供了可借鑒參考的依據。
分享友人