baseline plan 中文意思是什麼

baseline plan 解釋
基線計劃基準計劃
  • baseline : 底線。球場兩端的邊界線。
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. Corrective action requests may lead to amendments to the projects monitoring plan, or adjustments of the selected project baseline also require further investigation of issues that are not considered or appropriately addressed in the project documents

    改正行動要求可能造成項目監測計劃修改或、基準線的確定以及項目設計書的調整,也可能包括對項目設計文件未體現或充分關注問題的進一步調查。
  2. To add a task to a baseline or interim plan

    如果要將任務添加到比較基準或中期計劃:
  3. Add a task to a baseline or interim plan

    將任務添加到比較基準或中期計劃
  4. 2. in the task name field, select the task you want to add to the baseline or interim plan

    2 。在「任務名稱」域中,選擇要添加到比較基準或中期計劃中的任務。
  5. It ' s important to find tasks that vary from the baseline plan as soon as possible, so you can adjust task dependencies, reassign resources, or delete some tasks to meet your deadlines.

    因此盡早發現偏離比較基準計劃的任務非常重要,這樣就能調整任務相關性、重新分配資源或者刪除某些任務來滿足期限。
  6. The works that i did are making work breakdown structure, organizational breakdown structure, responsibility assignment, plan, estimate, progresss baseline, measure evc, record actual cost for work performed, tracking. trending, projection and corrective action

    在項目執行過程中,要對實物成果和實耗費用進行監測,實物成果按事先確定的里程碑來測量,即以實際達到某里程碑的資源預算加權值乘以該項工作的預算值即可求得贏得值。
  7. The paper analyzed software project process problems existed in domestic software enterprises. the application of project milestone management framework can improve and rebuild those inapplicable project management processes related to business plan, investment plan, requirement baseline, effort estimation, project plan, cost control and software quality assurance

    應用里程碑管理框架,能對國內軟體企業原有的項目管理過程模式進行改造,能夠有效克服舊的管理方式在商業計劃、投資計劃、需求基準、工作量預估、項目計劃、成本控制和質量保證等方面存在的缺點。
  8. Results can be used as baseline for monitoring site changes via periodic investigation. meanwhile, the proposed minimum management plan for selected sites is mainly to preserve their values for sustainable uses

    研究結果可作為監測保育景點變遷之基礎外,所提的簡要管理計畫,主要在於保存地景保育景點的各項價值以供永續利用。
  9. Perform forestry and vegetation management work ; plan, manage, develop and protect country parks and special areas ; undertake fauna, flora, endangered species and landscape conservation work, including law enforcement, education and advisory duties ; examine, advise, monitor and audit the ecological aspects of environmental impact assessment studies ; undertake ecological studies and maintain ecological baseline information ; and undertake applied research in various related discipline

    執行林木及植物管理工作;策劃、管理、發展及保護郊野公園和特別地區;負責動植物、瀕危物種及景觀的存護工作,包括執法、教育及提供意見;審研、監察及評審環境影響評估研究的生態部分,並就該部分提供意見;進行生態研究及備存生態學的基線資料;及在有關學科方面進行應用研究。
  10. Government baseline was based on the winning entry of the concept plan competition in 2002. according to this winning design, the construction costs should amount to $ 24 billion, excluding operation costs

    政府的基線計劃( governmentsbaseline )是按2002年國際性的概念設計比賽中所采立的冠軍設計而定,計劃內的建築成本是240億,當中並未包括營運費。
  11. In most cases, setting a baseline makes your project plan as useful as possible, because the baseline enables you to track and adjust your project

    在大多數情況下,設置比較基準可以使得項目計劃盡可能地有用,因為比較基準使用戶可以跟蹤並調整項目。
  12. The amount of time a task has been delayed from its original baseline plan

    任務與最初的比較基準計劃相比延遲的時間數量。
  13. 4. to add the task to the baseline plan, click save baseline

    4 。如果要將任務添加到比較基準計劃,請選擇「保存比較基準」選項。
  14. A baseline plan is the original project plan that you save and use to monitor project progress

    基準計劃是您保存來監督項目進度的初始計劃。
  15. Some variances you should look for when comparing your updated schedule to the baseline plan include

    在比較更新日程和比較基準計劃時,需要查找下列差異:
  16. You can compare an interim plan with the baseline plan to monitor project progress or slippage

    可以將中期計劃和比較基準計劃進行比較,以監視項目進度或落後情況。
  17. Variances occur when you set a baseline plan and begin entering actual information into your schedule

    在設置了比較基準計劃后開始將實際信息輸入到日程中時,會產生一些差異。
  18. Displays resources whose assignments have been delayed from their original baseline plan and have n ' t yet been completed

    顯示工作分配比初始的比較基準計劃推遲或尚未完成的資源。
  19. After you save a baseline plan and begin updating your schedule, you may want to periodically save an interim plan

    保存比較基準計劃並開始更新日程之後,或許需要定期保存中期計劃。
  20. If you add a new task after you set a baseline plan or an interim plan, you should add that task to your plan as well

    如果在設置比較基準或中期計劃之後添加了新任務,同樣也應該將該任務添加到計劃中。