basic design data 中文意思是什麼

basic design data 解釋
基本設計數據
  • basic : adj 1 基礎的,基本的,根本的。2 【化學】堿性的,堿式的。3 【礦物】基性的,含少量硅酸的。4 【軍事...
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  • data : n 1 資料,材料〈此詞系 datum 的復數。但 datum 罕用,一般即以 data 作為集合詞,在口語中往往用單數...
  1. In this thesis, the author aims to make a research on the formula and procedure of fugue structure by analyzing some classical works on the basis of three basic data and one design drawing

    對賦格結構的程式性及賦格寫作過程的程序化進行研究,從剖析經典作品入手,以三個數據、一張圖式統籌前期工作,是作曲執筆寫作時需關注的前提條件。
  2. At first, the attribute of knowledge node basic partial model in the whole model exactly expresses the basic character of content of knowledge node, therefore enable these knowledge node easily to be controlled for teaching. secondly, temporizing the trend of using database technology to design courseware, knowledge node partial model designed in this paper has a good structure, therefore it is possible to separate control from data

    該模型的合理性和優越性表現在以下幾個方面:首先,課件模型中的知識點基本模型的各項屬性反映了知識點的基本特徵,便於教學控制;其次,順應課件數據庫化的趨勢,本文設計的知識點模型結構良好,為數據與控制的分離提供了條件。
  3. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油田開發規劃設計的要求,利用功能模擬原理(含神經網路方法、微分模擬方法) ,依據油田歷史數據,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條件」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、工作量的最優構成問題) ;措施產量結構優化模型(解決壓裂、酸化、大修等各項措施產量及措施工作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。
  4. The program is developed with visualizing programming language called visual basic. net and general cartography software called autocad. based on the windows operating system, it has realized the integration of intelligent design, data processing and automatic cartography in a transformer substation ' s primary circuit, using intelligent technique supported by expert system, activex technique to develop

    開發的一次智能cad系統可以顯著提高工作效率、減少技術人員的勞動,對于促進供配電cad技術向高層次的集成化、智能化和標準化方向發展具有重要的理論意義和現實意義,是供配電所設計工作的發展方向。
  5. This article is to analysis the building fire automatic sprinkling system, which accords the formulate of automatic sprinkling fire system design specification ( gb50084 - 2001 ), uses hydraulic computation and basic formula, on basis of automatic system network configuration, and adopts project programming software visual basics. 0 and microsoft access2002 data base to composite hydraulic computation program of building fire system, and to realize building fire automatic sprinkling system design computerized

    本文對建築消防自動噴水滅火系統(以下簡稱:自噴系統)的分析,依據《自動噴水滅火系統設計規范》 ( gb50084 - 2001 )的規定,利用水力計算方法和基本公式,在自噴系統管網布置的基礎上,採用工程編程軟體visualbasic6 . 0和microsoftaccess2002數據庫進行建築消防系統的水力計算程序編制,實現建築消防自噴系統設計中的計算機化。
  6. Bedd basic engineering design data

    基本工程設計數據
  7. Basic engineering design data

    工程設計基本數據
  8. Based on the experiment results, the damage form of abnormal exterior joint are summarized, characteristics of hysteresis curve are studied, the effect of stirrup ratio and height of column section and beam section on anti - shear property of abnormal joint are discussed, working mechanism of abnormal exterior joint is researched, the conclusion that the anti - crack and bearing capacity of abnormal joint are studied by analyzing the minor core of abnormal exterior joint is proposed, the basic data is provided for the design formula of abnormal joints

    根據試驗結果,總結了異型邊節點的破壞形態,研究了節點滯回曲線的特徵,討論了節點核芯配箍率、樑柱截面高度變化對異型邊節點抗剪性能的影響,分析了異型邊節點的受力機理,提出應以「小核芯」為分析單元來研究此類節點抗裂和承載力的建議,為異型節點設計公式的建立提供了基礎數據。
  9. This paper presents a new design method and basic principle for the data acquisition system of the biochemical analyzer

    摘要提出生化儀中數據採集系統的設計方法,闡明了數據採集系統的基本原理。
  10. This article introduced a basic train of thought and design method of the realization of the concrete data brough the analysis of the finacial data together with the database exploitation principle and the completion of the data organization of the store ' s fiancial data

    摘要本文通過對財務數據的分析,結合數據倉庫開發原理,完成對財務數據倉庫的數據組織,介紹了財務數據倉庫的設計方法。
  11. This thesis gives a brief account of the basic theories of software engineering and computer graphics, of the data structure of individual component modeling, of the design of the software structure and of the method of realizing software. meanwhile, this thesis put more emphasis on the exploration of the arithmetic of the delaunay triangle network, nurbs curve integration, the filling - in arithmetic of triple - tree, and the arithmetic based on the scan - line arithmetic and the filling - in of complex section

    文章介紹了關于軟體工程學與計算機圖形學的基本理論及其各組件模型的數據結構、軟體結構設計與軟體實現的技術方法,並重點討論了基於約束條件的delaunay三角網格化演算法、 nurbs (非均勻有理b樣條)曲面擬合、三叉樹等值線填充演算法和基於掃描線的復雜剖面填充演算法。
  12. It is very important to estimate the basic parameters in helicopter preliminary design. neural network ( nn ) has the advantages in estimating accuracy and generalization over traditional methods. however, there are some difficulties in using nn, e. g., how to select a proper network structure and the number of hidden layers. in this paper, structure and connection weight of a three - layer nn are optimized by genetic algorithm, and the optimized network is applied to helicopter sizing. the proposed method can not only give an optimal nn structure and connection weight, but also reduce the prediction error and has the capability of self - learning when the latest data are available. furthermore, this method can be easily applied to helicopter design systems

    在直升機初步設計階段估算其基本參數是很重要的.神經網路的通用性和精度比傳統的估算方法有更多的優勢,但是在應用神經網路時存在如何選擇合適的網路結構和隱層節點數目等一些困難.應用遺傳演算法優化三層神經網路結構和連接權重,並將優化得到的網路應用於直升機參數選擇中.該方法不但可以給出一個最優的神經網路結構和連接權重,而且降低了估算誤差,具有及時應用最新數據學習的能力.此外,該方法易於在直升機設計系統中得到應用
  13. The function of stone artistic splice complete through to established basic design or source material warehouse with the help of others graph process software. besides author come up with a new program or machine method in accordance with stagger in the thicknes and vertical length at the stone sticking execution, i. e ensure the accuracy in measurement to approach subsection by space spiral line, the data used directly by numerical control machine. finally machined the stone become a spiral line columned surface arc slab

    此外,針對旋轉樓梯扶手石材貼片施工時所出現的厚度和垂直方向易產生較大錯邊的問題,提出了一種新的建模方案和加工措施,即在保證測量精度的基礎上,分段以空間螺旋線逼近,經過計算機處理后的參數直接可供數控加工使用,最後把石材貼片加工成螺旋線型的柱面弧形扳。
  14. Survey and design contracts shall provide the time for delivery of the basic survey or design data and design documents ( including an estimated budget ) by both parties, the quality requirements of the design, other conditions for coordination and other similar provisions

    勘察、設計合同中,應規定雙方提交勘察、設計基礎資料、設計文件(包括概預算)的時間,設計的質量要求以及其他協作條件等條款。
  15. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  16. The programs of genetics algorithms and the improved genetics algorithm are developed with c. putting some basic parameters of earthquake and other design data in the intelligent optimal design ' s program, the analysis results of lateral stiffiiess ( sectional dimension of members ), sectional reinforcement of members and structural inner forces will be gotten

    在改進的遺傳演算法優化程序中,只需要輸入一些基本的地震動參數及其他設計數據,就能給出結構側移剛度優化結果(構件截面尺寸) ,同時還給出結構內力和構件截面配筋率等分析結果。
  17. According to the regulation of period time of average statistical climate by the world meteorological organization, and taking into account of our country ' s climate characteristics, statistically analyzes the basic weather data for 18 cities in china from 1970 to 2000. weather data include maximum temperature and correspono, minimum relative humidity, minimum temperature and corresponding maximum relative humidity. this would be a preliminary database for responsive climate building design

    依據世界氣象組織( wmo )關于氣象參數統計時段的規定,考慮到我國不同城市區域氣候的特點,在建立室外氣象參數分析模型的基礎上,本文首次統計分析了我國18個城市最近30年( 1970 - 2000 )的主要氣象參數,包括月平均溫度、月最高溫度、最低溫度、以及對應的最小相對濕度和最大相對濕度,為建築氣候設計奠定了數據基礎。
  18. This thesis emphasized on discussing the analysis, design and achievement of the model of x - wrm, uml method and rose and made some analysis and design. it solved the problem of mode design, data impact and display of the report and defined the basic data based on the field

    論文重點討論了x ? wrm模型的分析、設計與實現,應用uml方法與rose對其進行分析與設計;解決報表樣式的設計、報表數據的交互、報表的顯示問題;定義了基於該領域的元數據。
  19. 2. based on the basic design data and requirements, the designs on the new type of structural system of pingsheng bridge are proposed. a lot of creationary achievements will be acquired on pingsheng bridge, called the single tower self - anchored suspension bridge

    2 .結合設計基本資料及設計技術要求,提出了平勝大橋橋型方案的設計構思,並對平勝大橋獨塔自錨式懸索橋的結構體系進行了創新性設計。
  20. The paper discusses the research design and implementation of infrastructure of park information system based on webgis, on which introducing some kinds of constructions of the webgis carefully after analysing the basic concept data structure data model.,

    本論文以基於webgis的園區公共設施管理系統的研究、設計和實現為背景,在對gis 、 webgis的基本概念、數據結構、數據模型、 webgis的支撐技術進行論述的基礎上,詳細介紹了目前構造webgis的幾種方法。
分享友人