block train 中文意思是什麼

block train 解釋
固定編組的整列列車
  • block : n 1 片,塊,大塊;粗料,毛料;木料;石料;金屬塊;【建築】塊料,砌塊;【地質學;地理學】地塊。2 ...
  • train : vt 1 訓練;培養,養成;鍛煉(身體);【園藝】使向一定方向生長,整形,整枝 (up; over)。2 瞄準,...
  1. This paper describes the components and structure of advanced signaling system : automatic train control system ( atc ), analyzes the function and classification of its three subsystems : ats, atp and ato, with emphasis on currently widely adopted atc system - quasi - moving - block signaling system, which works on coded digit track circuit, and discusses the operating principles of coded digit track circuit and the features of train control of quasi - moving - block signaling system

    信號系統是確保城市軌道交通列車運行安全及提高運營效率的關鍵設備。本文詳細討論了應用於城市軌道交通的先進的信號系統? ?列車運行自動控制系統( atc )的組成和結構,對其三個子系統:列車自動監控系統ats 、列車自動保護系統atp 、列車自動運行系統ato的功能和分類進行了詳細分析和比較。
  2. We mainly produce shifting fork and release fork of large - scale and heavy - duty truck ; shifting fork, release fork, shifting block, choosing - gear shaft, reverse - gear shifting fork shaft, right - and - lfet steering joint arm, upper cross arm shaft, wheel hub, link rod of all kinds of cars right - and - left supports, nipbutton of train auto - girder parts ; centeral wedge, fixed lean - board of absorber ; shifting fork, erankshaft, link rod, under - link board, startup pole of motocycle ; mould forging of mine, construction machinery, textile machinery, non - ferrous metal industry, etc

    主要生產產品:大、重型卡車變速箱的撥叉、分離叉等;各種轎車變速箱的撥叉、分離叉、撥塊、選檔軸、倒檔撥叉軸、左右轉向節臂、上橫臂軸、輪轂、聯桿,火車自動梁部件的左右支柱、夾扣,減震器的中心楔塊、固定斜板等鍛件;摩托車的撥叉、曲軸、連桿、下聯板、啟動蹬桿總成;礦山機械、建築機械、紡織機械、有色金屬等精模鍛件。
  3. In addition, a daily dedicated block train, " oocl express " is operated in the uk between southampton and manchester which helps to provide a high quality and reliable inland transport

    另外東方海外于英國所開設每日來往南安普敦及曼切斯特火車專列東方海外特別快車提供客戶優質及可靠的內陸運輸服務。
  4. Military forces patrolled train stations and roads to block escape

    而民兵隊伍則監守在公路,鐵路線上,以阻止逃離。
  5. Article 63 the major culprit and the core members of persons who gather to intercept or block the way of a train and pay no heed to the order to stop shall be investigated for criminal responsibility in accordance with article 159 of the criminal law

    第六十三條聚眾攔截列車不聽制止的,對首要分子和骨幹分子依照刑法第一百五十九條的規定追究刑事責任。
  6. Application of the mf method normally involves construction of an intermediate column at every 4 meters. on a crossover section, which serves as a passage for train change directions, intermediate columns placed at 4 - meter intervals would block the route of a turning train. therefore, a solution must be found to the problem of location of intermediate columns on crossover sections

    (四)轉轍段( crossover )處以多圓形潛盾工法施作之可能性,由於轉轍段系為提供電聯車換軌功能之處,兩軌道間不能有任何障礙物,而多圓形隧道環片間每隔四米即需中間柱,于設計上有何解決之道。
  7. Secondly, on the basis of the basic structure of the brake control system, the theory of brake task programming is studied and analyzed thoroughly. on the condition of automatic train protection, the fixed block system and moving block system the brake task programming method is brought forward

    其次,本文從制動控制系統的基本結構出發,對制動任務規劃理論進行了詳細的研究和分析,分別提出了在基於安全防護、固定閉塞和移動閉塞三種不同應用條件下的制動任務規劃方法。
  8. Train lighting batteries, block containers

    火車照明用電池.多格電池殼
分享友人