body anchor 中文意思是什麼

body anchor 解釋
人體支撐
  • body : n 1 身體,體軀,肉體;屍首;軀干,【林業】立木。2 本體,主體;主力;本文,正文;部分。3 (衣服的...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Study on distribution and diffusion regularity of frictional resistance in the inter face of grouted body of anchor cable

    錨索內錨固段摩阻力分佈及擴散規律研究
  2. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  3. The results demonstrate that the method mentioned in this paper is correct, reliable and rational. on the basis of the conclusions, the reinforcing structure ' s internal forces of 2 landslide body of hongjiadu hydraulic power plant are analyzed with this method and the service behavior of the joint structures of anchor caverns and piles in the 2 # landslide body is studied. at the same time, the

    在此基礎上,文中用該方法對洪家渡水電站2 #塌滑體的加固結構進行了內力分析,研究了洞樁聯合結構在洪家渡水電站2 #塌滑體加固中的工作性態,計算了每個抗滑樁和錨固洞樁承受的下滑力,為實際工程加固設計提供了合理、可靠的依據。
  4. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化程度、破碎程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  5. As the main method of measurement in the tests, some strain measuring points are arranged on the reinforced steel bars of the anchor bearing body. the changes of strain with different loading levels at their locations have been measured, through which range of influence and distribution of strain with loading in grout can be investigated, and corresponding distributions of axial force and bond stress are calculated according to hooke ' s law. making use of nonlinear curve fitting, distribution equation of bond stress of the fixed unit anchor length is achieved

    試驗測試手段通過在錨索承載體上布設應變測點,觀測錨索在不同的荷載級別下的應變變化情況,對不同荷載級別下,單元錨索注漿體內應變的影響范圍及分佈規律展開分析,依據虎克定律計算出了其軸力與粘結應力的分佈;並對測試結果進行了擬合,得出了錨固段粘結應力分佈的擬合方程。
  6. Taking a qingdao hotel second phased project deep hole excavated for building foundation as example, the paper introduces the application of the demolition vibration in the complex peripheral environment and the geological condition, the influence, crag body vertical excavates regarding nearsightedness, the pre - stressed anchor rod and the earth nail unify support and protect the technology in the project of the crag body side slope

    摘要以青島某飯店二期工程深基坑為例,介紹了在復雜的周邊環境和地質條件以及有爆破振動的影響下,對于近似垂直開挖的巖體邊坡,預應力錨桿與土釘結合的支護技術在邊坡支護工程中的應用。
  7. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  8. As products of the tests, anchor bearing body and a device for strand pre - bending practical for engineering application have been developed

    作為試驗的附屬產品,設計和研製出了具有工程實用性的錨索承壓板與鋼絞線彎曲裝置。
  9. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  10. The analysis shows that the depths of the major and auxiliary anchor rods are affected by the cement mortar and its bond strength with the rock body and not affected by the gradient and the height of the rock side slope

    並得到如下結論:主次描桿的錨固深度只受水泥砂漿與巖體的結合強度的影響,不受邊坡坡度和高度的限制。
  11. Don ' t think of pulling the water. learn to anchor your hands, wrists, and forearms, and hold onto the water. learn to use your legs for balance and body stabilization

    不要想去拉動水,要學會把手,腕,前臂牢牢地扎在水裡.學會用腿使身體平衡穩定
  12. As to antislide pile design, confirm anchor anchorage depth is very important, it is not only the key element to decide which one should adopt in rigidity or elasticity pile but also the necessary factor to solve the pile body shear -

    對抗滑樁設計而言,確定錨固深度至關重要,它不僅是決定採用剛性樁或彈性樁的先決要素,而且也是求解樁身各處剪力、彎矩以及應力的必不可少的條件。
  13. Anchor / support bolt holes are located in base of body

    固定器/支架螺栓孔位於閥門的基座。
分享友人