bored concrete pile 中文意思是什麼

bored concrete pile 解釋
混凝土灌注樁
  • bored : 被煩擾
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  2. The works included 24 bored piles of 2. 5 meters in diameter and 55 meters in depth, 500 meters long underground concrete diaphragm wall of 0. 8 meters thick and 25 meters deep, 450 pre - cast concrete pile of 0. 5 meters in diameter, 12 meters deep soil excavation with multi - layer post - tensioning shoring system, reinforced concrete pile caps and basement slabs

    其工程內容包括了24支直徑2 . 5米,深達55米直入巖層的鉆孔樁,周長500米,深度25米,厚度0 . 8米的地下連續混凝土墻, 450支直徑0 . 5米預制混凝土樁, 12米深開挖,多層水平鋼支撐系統,混凝土樁承臺及地庫底板結構。
  3. Application of artificial digging hole and machinery drilling hole bored concrete pile mixture support in new and old construction

    人工挖孔與機械鉆孔灌注樁混合使用支護在新舊工業廠房施工中的應用
  4. On the basis of construction technique of large diameter bored hollow pile of prestressing force concrete, through the program of marc, this paper analyses the pile vertical bearing capacity under different lengths, diameters and strength parameters of mediators as well as the inner force and displacement under lateral and combined loads, giving the criterion of rigid pile and flexible pile. with elastic theory, the paper establishes the inner force calculating formula under eccentric load. this research findings will set a firm theoretical foundation for its widely application

    本文在對大直徑鉆埋預應力混凝土空心樁施工工藝分析研究的基礎上,運用marc軟體,對豎向荷載作用下不同樁長、樁徑及樁周介質強度參數時空心樁的承載力性狀,以及水平向荷載及其組合荷載作用下空心樁的內力、位移變化規律進行了模擬分析,提出了大直徑鉆埋預應力混凝土空心樁的剛性與柔性界定標準。
  5. On the basis of construction technique of large diameter bored hollow pile of prestressing force concrete, through simulation test, this paper simulates the interaction of pile with side mediator and pile with end mediator respectively under different conditions of injected cement paste, analyses the changing regularity of ultimate skin friction in different depths and different mediators, and also studies the changing regularity of end resistance in different end mediators

    本文在對大直徑鉆埋預應力混凝土空心樁的施工工藝分析研究的基礎上,通過室內模擬試驗,分別模擬樁與樁側、樁端介質不同注漿情況下的相互作用性狀,分析了樁側介質變化時不同深度處樁側極限摩阻力的變化規律和樁端介質變化時樁端承載力的變化規律。
  6. Discussion about the quality control of bored concrete pile

    如何進行混凝土灌注樁質量監理
  7. ( 4 ) by using finite element method, the settlement and stress distributions both cast - in - situ piles with expanded branches or plates and common concrete bored pile have been comparied. the main differences are pointed out, which may be useful for pile design

    ( 4 )用有限元法對擠護支盤樁和直樁的沉降、應力分佈進行分析,指出它們應力分佈的異同點,這有助於樁的設計。
  8. Combining the experience of bored cast - in - situ concrete pile construction for an approach bridge, this paper discusses the construction control measures for bored cast - in - situ concrete pile in deep soft soil

    摘要結合某引橋鉆孔樁施工的經驗,探討深厚軟基區的鉆孔灌注樁的施工控制措施。
分享友人