bottom elevation 中文意思是什麼

bottom elevation 解釋
底標高
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  1. The deposit is concentrated at the bottom of the embayment with highgrade dissemination at a higher elevation above it.

    礦體集聚在凹陷的底部,而比它高的位置才有高品級的分佈。
  2. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸線、標高線復測投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。
  3. The preparations, drilling rig adjustment, pile distribution control, mixing verticality control, elevation measurement, elevation control of pile top and column bottom, curing agent choice and control of mixing speed and blending quantity, must be done well for strengthening soft soil foundation by mixing cement with soil in construction

    在實踐中要做到6點: 1 )調整好鉆機; 2 )控制好柱的分佈位里與攪拌軸的垂直度; 3 )測量好高程; 4 )控制好樁頂、柱底高程; 5 )選擇好固化劑; 6 )控制好攪拌速度和摻加量。
  4. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  5. Huang r x, and x. jin, 2002 : sea surface elevation and bottom pressure anomalies due to thermohaline forcing, part i : isolated perturbations. j phys oceanogr., 32, 2131 - 2150

    張學洪,李薇,金向澤,黃瑞新, 2002 :壓力坐標海洋環流模式的發展和應用前景,自然科學進展(已付印)
  6. 178 that is a general ( front, rear, side, left, right, top, vertical, bottom, elevation, auxiliary, cut - away, birds eye ) view

    那是全視(前視、后視、側視、左視、右視、頂視、俯視、底視、立視、輔助、內部剖視、鳥瞰)圖。
  7. The mark structure contains five parts : protective device, measure shaft, putright equipment, mark - bottom device and ground device, and gps measure pier functioning in elevation control and horizontal layout control is arranged as well

    標體結構包括保護裝置、引測裝置、導正裝置、標底裝置、地面裝置5大部分,並設gps測墩,兼有高程式控制制與平面位置控制的作用。
分享友人