bottom equipment 中文意思是什麼

bottom equipment 解釋
井底設備
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  • equipment : n. 1. 〈常 pl. 〉設備,裝備,配件,配備物品。2. (一個企業除房地產以外的)固定資產。3. (工作必需的)知識,技能,修養。4. (火車)車輛;(汽車等)運輸配備。
  1. Combining with practice of china ' s uranium ore heap leac hi ng, this paper proposes main ways and suitable technologies in the fields of emp hasizing feasib ility research, adop - ting strengthened technologies, improving equipment le vel, op timizing control technological factors and developing application range and so o n, which include adopting acid - curring and ferric sulphate - tric kle leaching process, bacteria heap leaching, countercurrent heap leaching, sele cting advanced material of heap bottom, developing large mechanized heap constru ction equipments and methods, popularizing drip i rrigation distributing solution, optimizing heap leaching process parameters, as we ll as developing recovery equipments suited to heap leaching, etc, in order to i n crease leaching rate, reduce heap leaching period and achieve more economic bene fits

    結合我國鈾礦堆浸實際,在重視堆浸可行性研究、採用強化堆浸技術、改進堆浸裝備水平、嚴格工藝條件及拓寬堆浸的應用范圍等方面提出一些有效途徑及適用技術,包括採用拌酸熟化-高鐵淋濾浸出、細菌堆浸、制粒堆浸、逆流堆浸,選用優質底墊層材料,研製大型機械化築堆方法和設備,推廣滴灌式布液,優化堆浸工藝參數,以及開發堆浸相配套的回收設備等,以提高浸出率、縮短堆浸周期,獲得更大的經濟效益。
  2. Railway fixed equipment. sleeper screws for flat - bottom rails

    鐵路固定設備.寬底式普通道釘
  3. Railway fixed equipment. sleeper screws with seating for flat - bottom rails

    鐵路固定設備.平軌用帶墊枕木螺釘
  4. Railway fixed equipment. sawing and drilling of flat - bottom rails of types superior or equal to 26 kg m, of 60 g, 70 g grooved rails and their fischplates

    鐵路固定設備.大於kg m的g g形平底軌及其魚尾板的切割和鉆孔
  5. The product is suitable for double straight line smoothing of grinding flat glass. coarse grinding, fine grinding, and polishing can be done at one time. adopt plc control system, which sets processing parameters via interface, and finishes processing at one time, ti has stable bottom structureprecise and smooth transmission system, the transmission belt drive adopts strong power and tran - sfrequency motor to control speed, constant power, constant rule, output and advanced equipment to control, completed product has high polishing level, which is an ideal option assistant processed equipment of processing delicacy glass and furniture glass factory

    本產品適用於磨削平板玻璃是雙直線平邊,粗磨精磨拋光一次完成採用plc控制系統通過界面設定加工參數次完成加工,具有穩重扎實的底座結構,精確流暢的傳動系繞,傳送皮帶驅動採用功率變頻電機調速控制,恆功率恆扭矩輸出和高配置的控製成品拋光亮度高是加工精品玻璃和傢具玻璃廠家使用的最佳輔助加工設備。
  6. Main machinery equipment are arranged at the bottom

    輪機的主要機器設備均布置在艙底。
  7. Abstract : using magnesia ramming materials in furnace bottom and partial hearth instead of traditional shaped magnesia bricks can prolong furnace life, reduce refractories consumptions per one ton product and increase equipment utilization rate

    文摘:敘述了中低碳錳鐵精煉爐用鎂質搗打料在爐底與部分爐缸取代傳統的成型鎂磚作爐襯材料,達到了延長爐齡、降低噸產品耐火材料消耗、提高設備作業率的目的。
  8. Management on supporting equipment of inclined bottom charcoal oven

    斜底炭化爐護爐設備的管理
  9. Railway transport equipment. tank wagons for carrying liquified gases under pressure and having bottom filling and emptying devices. maximum service pressure 40 bars. air orifice for gauging, degassing and testing

    鐵路運輸設備.底部帶灌注和排放裝置的低壓液化氣罐車.最大壓力40bar .測量排氣和試驗用氣孔
  10. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  11. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過程中的鋼筋網保護層、鋼筋網接駁、鋼筋網預埋件、墻體錨固深度、墻體接頭形式以及施工過程中鋼筋網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  12. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  13. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. Technical requirement for repairing special equipment of trailing hopper suction dredgers part 4 : conical bottom valve

    耙吸挖泥船專用設備修理技術要求第4部分:斜盤式泥門
  15. Technical requirement for repairing special equipment of trailing hopper suction dredgers part 3 : box shape bottom doors

    耙吸挖泥船專用設備修理技術要求第3部分:鉸鏈式泥門
  16. Technical requirement for repairing special equipment of trailing hopper suction dredgers part 2 : sliding bottom values

    耙吸挖泥船專用設備修理技術要求第2部分:水平滑移式泥門
  17. A detailed description of the construction technique of soft mattress for bottom protection and development of equipment is presented

    詳細地介紹了護底軟體排的施工工藝和設備的研發。
  18. Tanks for transport of dangerous goods - service equipment for tanks - adapter for bottom loading and unloading

    危險品運輸罐.裝罐設備.底部加載和空載適配器
  19. At the bottom of the body menu, you should find a button labeled “ show equipment stats ”

    在內心屍體菜單,你應該找一個按鈕標記"表明設備的狀態"
  20. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底巖石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的井架、平臺等設備,研究設計了模擬6000米井底壓力壞境的高壓模擬井筒、鉆柱高壓轉聯器、鉆井液高壓模擬系統以及高壓除砂器等機械裝置,並研究了井底四維模擬壓力(上覆壓、圍壓、孔隙壓和液柱壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓力環境的模擬。
分享友人