bridge erection 中文意思是什麼

bridge erection 解釋
橋樓
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • erection : n. 1. 直立;樹立,建設;設立;架設;【機械工程】安裝,裝配。2. 建設物,建築物。3. 【醫學】勃起。
  1. Erection of segmental bridge decks by ground support method cpr - 2

    運用施工架興建中的高架橋
  2. Erection of segmental bridge deck by launching gantry no. 1

    運用吊梁機興建中的高架橋
  3. Erection of segmental bridge deck by launching gantry no. 2

    運用吊梁機興建中的高架橋
  4. Erection of segmental bridge decks by launching gantry no. 1

    運用吊梁機興建中的高架橋
  5. Erection of segmental bridge decks by launching gantry no. 2

    運用吊梁機興建中的高架橋
  6. Erection of segmental bridge at viaduct c6 span 1

    正在進行安裝工作臺已完成的高架橋
  7. A scheme on the erection of 50m concrete box girder in hangzhou bay bridge

    雙幅混凝土箱梁運架方案探討
  8. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石油鉆井採油平臺和其他海上弔裝工程。
  9. Cable stayed bridge - steel segment erection approach viaduct - deep water region

    深水區-高架橋-把預制構件吊上橋面
  10. With “ green agriculture and creative development ” as its main theme and through the display and trade of products relating to agriculture and by holding high - level forum, site investigations to ecological agriculture and other activities, this agricultural exposition aims at the erection a platform of exchanges and cooperation among producers, distributors and consumers, thus constructing a bridge of communication and liaison for promoting trade and development and market prosperity

    本次「農博會」 ,以「綠色農業、創新發展」為主題,通過農產品的展示交易、舉辦高層論壇和生態農業實地考察等多項活動,旨在為生產商、經營商和消費者搭建交流、合作的平臺,構築一座溝通、聯絡的橋梁,促進合作,促進交易,繁榮市場,促進發展。
  11. In the segment precasting, cantilever erection and bridge deck construction during the paksey bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line

    摘要在paksey大橋的施工過程中,對節段梁的預制、節段梁的懸臂拼裝以及橋面體系的施工進行了精密的測量控制,從而使橋面線形與設計線形的誤差最小。
  12. Erection of falsework for in - situ bridge deck construction at viaduct b1

    興建中的隔音屏地基興建中的高架橋橫梁
  13. Erection of falsework for construction of bridge str08 near the pak kung au

    鄰近於伯公坳架設工作架為配合在該處興建橋編號str08的橋面
  14. Erection of falsework for construction of bridge str17 near the wsd catchwater

    鄰近於長沙引水道架設工作架為配合在該處興建橋編號str17的橋面
  15. The erection of a 42m precast segmental box girder with dp450 bridge girder erecting equipment

    改裝架橋機和架設斜橋的經驗與施工技術探討
  16. Regulations for railway bridge erection by girder - erecting machine

    鐵路架橋機架梁規程
  17. Spj 450 32 type fabricated bridge girder erection machine

    32拼裝式架橋機
  18. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  19. The bridge erection has well developed in our country

    國內架橋機已初具規模,形成了競相發展的格局。
  20. With the development of the building of railways, the bridge erection machine is becoming well advanced in technique

    隨著我國鐵路基建的不斷發展,鐵路架橋機也在迅速發展。
分享友人