buried line 中文意思是什麼

buried line 解釋
地下線路
  • buried : bury 的過去式及過去分詞。
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Then following the clew that, in the hands of the abb faria, had been so skilfully used to guide him through the daedalian labyrinth of probabilities, he thought that the cardinal spada, anxious not to be watched, had entered the creek, concealed his little barque, followed the line marked by the notches in the rock, and at the end of it had buried his treasure. it was this idea that had brought dant

    唐太斯根據法里亞神甫囑咐他的方法認真推敲手中的線索,他想,紅衣主教斯帕達,為了不讓別人發現他的行動,曾到過這個小灣,把他的小帆船藏在裏面,然後從山峽中循著留記號的這條小徑走,在小徑盡頭的大巖石處埋下了他的寶藏。
  2. In order to effectively determine the position and distribution of porosities in laser welding sampes with complex structure, a preliminary research was proceeded on the distribtion features of porosities and a formula which can calculate the buried depth of porosities was deduced based on the line profile distribution curve of the flaw position

    為了確定復雜結構激光焊件焊縫中氣孔缺陷的位置和分佈,對氣孔缺陷的分佈特徵進行了研究,推導出氣孔缺陷埋藏深度的計算公式,設計了峰值異常缺陷和斜凹型異常缺陷投影距離自動提取演算法,確定了缺陷在鈦合金激光焊件中的分佈特徵,並通過模擬試件的破壞性試驗對該公式進行了驗證。
  3. So carry through the construction technology of typical sect of natm by shallow - buried summary on west fourth ring road buried culvert of beijing branch of the middle line of south - to - north water transfer project, which would offer reference for future similar projects

    其中,暗涵工程交叉管線眾多,在西四環立交橋樁基中間穿過,淺埋暗挖法施工有一定的難度,為此,對南水北調中線北京段西四環暗涵淺埋暗挖典型段施工技術進行總結,以為今後類似工程提供參考和借鑒。
  4. Earthing conductors are normally buried underground and connected to the overhead line from the bottom of the polestowers

    接地導體通常埋于地下,並從桿塔底接駁至架空電纜。
  5. Variation of intersite temperature drop with throughput when repairing on - line buried hot crude oil pipeline

    埋地熱輸原油管道在線修復時站間溫降隨輸量的變化
  6. The calculation on the temperature drop of stations - intersite for repairing the buried hot waxy crude oil pipeline on - line

    埋地原油管道在線修復時站間溫降的計算
  7. The study shows that the most likely sliding path is located shallowly under the rock bed and the sliding path runs close to a line from tensile area at dam heel to dam toe. staircase sliding paths buried less than 14 meters bellow dam heel are also dangerous, but they are not the most dominant

    研究表明,最危險滑移路徑處于壩基面以下淺層,滑移通道為從上游壩踵拉裂區沿近直線方式向下游壩趾滑出;正常蓄水位時, 9b 、 4b壩段最危險滑移路徑安全系數分別為k _ s = 4 . 15 、 3 . 05 。
  8. Successful application to many station jobsites of the fu - ba line of beijing metro program shows that using the cavern - pile method in loose soft stratum for excavating shallow buried large section tunnels is practicable. therefore it has broad prospect for application

    在北京地鐵「復一八線」多個車站工程中的成功應用,充分證明採用淺埋暗挖洞樁法在鬆散軟弱地層中進行淺埋大斷面洞室的開挖是可行的,具有良好的發展前景和推廣價值。
  9. Buried heated line

    地下加熱管線
分享友人