cable closure 中文意思是什麼

cable closure 解釋
電纜接頭盒
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • closure : n 1 關閉,停業;截止;末尾,結束;〈英議會〉終止辯論(=〈美國〉 cloture)。2 閉塞物;【建築】隔...
  1. Plastic jacket joint closure for telecommunication cable part 5 : aeriferous assembly joint closure

    通信電纜塑料護套接續套管第五部分:通氣式裝配套管
  2. It is difficult or even tragedy of closure of span arch construction if cable control badly

    若施工控制不好將對拱肋合龍造成困難,甚至導致事故的發生。
  3. Plastic jacket joint closure for telecommunication cable part 4 : assembly joint closure

    通信電纜塑料護套接續套管第四部分:裝配套管
  4. Plastic jacket joint closure for telecommunication cable part 1 : general specification

    通信電纜塑料護套接續套管第一部分:通用技術條件
  5. Plastic jacket joint closure for telecommunication cable part 2 : heat shrinkable joint closure

    通信電纜塑料護套接續套管第二部分:熱縮套管
  6. Plastic jacket joint closure for telecommunication cable part 3 : plastic injection joint closure

    通信電纜塑料護套接續套管第三部分:注塑熔接套管
  7. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平面桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間模型(含模板的作用模擬) ,由平面桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程模擬計算之後得出達到目標索力的合理的施工步驟。
  8. Cable - stayed bridge, difference in temperature, shrinkage and creep sophisticatedly affect the course of its construction. after closure, with the strength of concrete, the adjustable range of internal force and configuration is narrow. so, rigorous control of construction is the guarantee of achieving design objective

    斜拉橋,施工過程中由於受溫差、收縮、徐變等因素影響,再加上混凝土的強度不高,成橋后內力和線形可調的范圍都較小,對施工過程的嚴格控制是實現設計成橋目標的保證。
  9. The quality of hjm - 25 cable joint module and xjs datacable cable plastic joint closure manufactured a series of hnors ; first prize of quanzhou science and technolohy award, third prize of fujian science and technology award and etc. also, it has been considered as national - grade key new product. the advanced high integrated full electronic circuit is adopted to develop and produce 3999 series telephone,

    Cdma是移動通信目前最具有發展潛力的技術,公司於1995年開始此項技術的研究與開發,在收集國內外大量cdma的技術資料基礎上,進行消化、改造、創新,開發成功了冠盛系列cdma移動通信直放站。
  10. The calculation and construction of cable force adjustment of gonghe cable - stayed bridge after closure are studied

    對公和橋合攏后索力調整的計算及實施過程進行了深入研究。
  11. Lead tube is usually used as the metal closure of underground cable

    摘要鉛管為最常使用之地下電纜接頭材料。
  12. Optical communication catv products 1x1 - f optical cable closure 2x2 - a optical cable closure

    -光通信廣電產品-
  13. A large percentage of manholes are usually flooded, and some corrosive pollutants containing in the flooded manhole may corrode the metal cable closure and therefore cause severe problem in the telephone cable plant

    由於大多數的人孔經常充滿來自於周圍環境的地下水,若有侵蝕性物質意外流入人孔,可能導致人孔內之鉛管接頭加速腐蝕而影響其長期使用的安定性。
分享友人