cable work 中文意思是什麼

cable work 解釋
電纜工程
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. Hopefully, the work will be completed as planned to meet the growing demands of some cable stations

    我們期望剪輯製作工作能如期完成,以配合一些電視臺不斷增加的需求。
  2. On the district level, you will most likely work with reporters from local newspapers and radio, television, and cable stations

    在地區,你要洽當的與當地報紙及電臺、電視臺記者們一起合作。
  3. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價
  4. The large - span annular open - web cable truss structure is a new type of tensile structure based on cable dome. especially it is suitable for awning structures of palestra. little research work on this type of structure has been done abroad, and at home the research is blank

    大跨度環形空腹索桁結構體系是繼承于索穹頂結構、近年來才出現並應用於實際工程的新型結構體系,具有顯著的特點,特別適合應用於體育場的罩棚結構。
  5. When the digital cable set - top box working, the entire dvb - c receiver work is establishment on the synchronized

    在數字有線電視機頂盒的工作中,整個dvb - c接收機的工作都是建立在同步的基礎上的。
  6. Cable stayed bridge - asphalt paving work

    斜拉橋-瀝青鋪設工程
  7. The cable crane is a sort of special hoisting machinery, which uses flexible cable hung between two fulcrums as carrying structure, makes use of the crane carriage moving over the carrying cable to work, and hold the ability of vertical transporting and horizontal transporting

    纜索起重機是一種以懸掛于兩支點之間的柔性鋼索作為大跨距承載結構、利用載重小車在其上往返移動進行工作、兼有垂直運輸和水平運輸的特種起重機械。
  8. And cable labs, the research and development arm of the cable tv industry, announced last week a new software standard that may allow cable ' s digital tv setups to work with the new digital tv sets

    作為有線電視業研究和發展機構的有線電視實驗室,上周也宣布了新的軟體標準,該標準允許有線電視的數字電視設置與新型數字電視機兼容。
  9. The author believe that copper cable will be replaced by fiber as the development of network, but now most fiber lan use a switch with fiber interface to get full - duplex operation, and the most important obstacle in deploying fiber lan is the high price of the switch. only some big company can afford the fiber switch and the switches often work in man. in order to lower the costs of gigabit optical lan, this paper presents a workgroup optical network base on passive star coupler ( psc )

    作者堅信,隨著網路技術的發展,光纖一定會代替銅纜成為網路的主流傳輸介質,目前光纖本身的價格也可以為客戶所接受;但是影響光纖介質的局域網推廣普及的一個重要因素,就是目前市面上的光網路都採用了全雙工交換機,而光纖介面的交換機尤其是千兆位的交換機價格很高,多用於校園網或城域網;只有極少數大型企業能夠負擔,影響了光纖網路的部署。
  10. The cable - strut tensile structures are the self - stress equilibrium systems composed by tensional cables and struts. in this paper, the basic concept of the structures was described. the analysis methods of the structural characteristics ( statically and kinematically determinate or indeterminate ) and the geometrical stability were presented. it is indicated that the cable - strut tensile structures are in stable equilibrium with first - order infinitesimal mechanisms. the ranks of equilibrium matrix were calculated by employing the singular value decomposition, and the independent modes of inextensional mechanisms and the states of self - stress were also obtained in the same way. this paper contains some typical examples which illustrate all of the main points of the work

    索桿張力結構是指由張力索和壓桿組成的、具有預應力自平衡的新穎結構體系.本文詳細闡述這種結構的基本概念和結構特徵,討論結構靜動定體系特性和幾何穩定性判定分析方法,指出索桿張力結構應具有一階無窮小機構的幾何穩定體系.文中採用奇異值分解方法計算結構平衡矩陣的秩,並計算獨立機構位移模態和自應力模態.最後,對幾種典型的索桿張力結構進行了算例分析
  11. Yesterday, my uninitiated husband ray was called to the university of hawaii to do some emergency high voltage cable splicing work. he was going to take his regular electrical knife but his inner guide told him to take his rubber insulated knife

    昨日我尚未印心的先生瑞,被急召至夏威夷大學接合高壓電線,他原想如往常一般攜帶電刀,但內在卻指引他改帶橡膠絕緣的刀子。
  12. The level first frequency variety regularity following the pre - stressing cable value is achieved through white noise sweep checking. the conclusion that model is in elastic work stage is achieved

    對結構模型進行了振動臺試驗,採用白噪聲對結構模型進行掃頻分析,得出結構水平第一振型對應頻率隨拉索預應力值的變化規律。
  13. The prestress in the structure have two functions : on the construction process, the prestress keeps the structures to be formed ; but on the initial equilibrium state, the prestress changes the force in the members and keep cable do not out of work

    提出了預應力對結構的作用有兩個:在施工成形階段,預應力的作用為保證結構能夠施工成形;而在施工成形后,預應力的作用主要是改變結構中各構件的內力分佈,同時控制索不要退出工作。
  14. The results showed that the given cable design could work normally under thermal vacuum environment

    理論計算表明,給定的電纜設計滿足在熱真空條件下正常工作要求。
  15. In this thesis, the construction and monitoring general method of cable replacement work for qianwei minjiang river cable - stayed bridge is introduced firstly, then, using large - scale commercial finite elements analysis software, algor, a space solid model is developed. in order to give attention to internal force and deformation, the thesis simulates the factual situation of the bridge by adding boundary elements. the analyzed items include : cable forces, deflections, stress of box - girder and maximum horizontal deformation of tower under different cable - replacement cases, which can be used to tutor design and construction for other similar works

    本文以犍為岷江大橋換索工程為背景,首先介紹了該橋換索施工與監控工作的大致情況,並應用大型商業有限元軟體algor建立了該橋空間計算模型,建模過程中為了真實地模擬結構換索前的內力狀態,實現內力與線形兼顧,本文使用了「添加邊界元還原結構內力」的方法。
  16. However, i had a farther design that he knew nothing of, and that was to make a mast and sail and to fit her with an anchor and cable : as to a mast, that was easy enough to get ; so i pitch d upon a strait young cedar - tree, which i found near the place, and which there was great plenty of in the island, and i set friday to work to cut it down, and gave him directions how to shape and order it

    我在船頭還做了個前帆,以便逆風時行船。尤其重要的是,我在船尾還裝了一個舵,這樣轉換方向時就能駕御自如了。我造船的技術當然不能算高明,然而知道這些東西非常有用,而且是必不可少的,也就只好不辭辛勞,盡力去做了。
  17. However, for membrane structures and cable - strut structures are always analyzed separately, the cooperative studies on cable - strut - membrane space structures are rare. some research work on the theory and experiment of csmss is carried out in this thesis

    但迤今為止,對索桿膜空間結構的研究都是將索桿和膜片分離開單獨分析,在索桿膜協同分析方面還是一個空白。
  18. To avoid the probability, engineer calculate the cable tension and the pre - rising elevation with finite element theory, it cost much time in design the program and repeat calculation, the other hard work is to find out the place where the cables located in span arch structure, its must find out the optimized result manually which restrict the design work. recent years, lots of commercial fea software develop rapidly. engineers focus on the solution of commonness problems by the software existed

    為了解決這個問題,設計人員常常採用有限元方法計算扣索受力及拱肋控制標高,並根據計算結果設計扣索吊裝位置,在此過程中大量重復編程及計算工作佔用了很多工作時間,另外在扣索吊裝位置的選定過程中又沒有明確的方法,只能根據大量的計算結果人工尋找優化方案,這些都制約著設計工作的開展。
  19. Note : when actually applying, choose suitable type cable according to the pipe lenght, heat loss, work voltage, number of core wires. and core wire ' s section areas

    注:實際選用時應根據管道長度、散熱量、工作電壓和芯線數,計算芯線截面而定。
  20. Railway fixed equipments and rolling stock. safety cable work and connection. part 0 : general

    鐵路固定設備和機車車輛.安全鋪設電纜和連接.第0部分:通則
分享友人