calculation period 中文意思是什麼

calculation period 解釋
計算期
  • calculation : n. 1. 計算,計演算法。2. 推定,預測。3. 深思熟慮,精打細算;慎重的計劃;算計。
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  1. 4. earnings per share the calculation of basic earnings per share for the three months ended 31 march 2005 was based on the group s net profit of approximately hk 654, 000 2004 : loss of approximately hk 1, 590, 000 and the weighted average number of 240, 000, 000 ordinary shares in issue during the three months period 2004 : 240, 000, 000. the company did not have dilutive potential shares for the three months ended 31 march 2005 2004 : nil

    4 .每股盈利虧損截至二零零五年三月三十一日止三個月的每股基本盈利虧損乃按本集團于該三個月期間內的純利約654 , 000港元二零零四年:虧損約1 , 590 , 000港元及240 , 000 , 000股已發行普通股二零零四年: 240 , 000 , 000股的加權平均數計算。
  2. 4. loss per share the calculation of basic loss per share for the nine months ended 30 september 2004 was based on the group s net loss of approximately hk 9, 223, 000 2003 : hk 14, 817, 000 and the weighted average number of 240, 000, 000 ordinary shares in issue during the nine months period 2003 : 240, 000, 000. the company did not have dilutive potential shares for the nine months ended 30 september 2004 2003 : nil

    4 .每股虧損截至二零零四年九月三十日止九個月的每股基本虧損乃根據股東應占虧損約9 , 223 , 000港元二零零三年同期: 14 , 817 , 000港元及本公司上述期內已發行之股份加權平均數240 , 000 , 000股二零零三年同期: 240 , 000 , 000股計算。
  3. 4. loss per share the calculation of basic loss per share for the six months ended 30 june 2004 was based on the group s net loss of approximately hk 6, 751, 000 2003 : hk 11, 690, 000 and the weighted average number of 240, 000, 000 ordinary shares in issue during the six month period 2003 : 240, 000, 000. the company did not have dilutive potential shares for the six months ended 30 june 2004 2003 : nil

    4 .每股虧損截至二零零四年六月三十日止六個月的每股基本虧損乃根據股東應占虧損約6 , 751 , 000港元二零零三年同期: 11 , 690 , 000港元及本公司上述期內已發行之股份加權平均數240 , 000 , 000股二零零三年同期: 240 , 000 , 000股計算。
  4. A research on calculation of eclipse magnitude and eclipse bound in seleucid period in ancient babylon

    古代巴比倫塞琉古王朝時期食分演算法初探
  5. The essay combines " code for seismic design of buildings " ( gb50011 - 2001 ), analyzing and discussing bent structure of one - story industry buildings tinder the interaction of the seismic, ground - structure, and works out calculation model for bent structure ' s dynamic period about the depth of burying foundation and toft transmutation ; the model is employed expediently, adapts to actual engineer construction design at present

    本文結合我國《建築抗震設計規范》 ( gb50011 - 2001 ) ,對單層工業廠房排架結構在地震作用下土?結構共同作用問題進行了分析討論,給出了考慮基礎埋深與地基變形影響時排架結構自振周期的計算模型;這?模型應用方便,適合目前實際工程結構設計使用。
  6. According to composition and structure feature of jinjiang landslide analysis, the author considers it was a enormous landslide with the characters about multi - period ( total four slides ) and overlaying, its mechanism of deformation failure attributed to a representative sliding - bending mode in the consequent slope, the stability calculation indicates that no matter what the whole landslide would not slide, while, as earthquake intensity reaching or exceeding vi, the first - period landslide which lies to the south of huangjiagou in the front slip mass and the fourth - period landslide which lies to the north of caojialiangzi in the back slip mass will slide

    由金江滑坡的組成及結構特徵分析可知,邊坡為一多期次(四次滑動)兼具超覆特徵的巨型滑坡,其變形破壞機制屬順層邊坡中比較典型的滑移?彎曲型。穩定性計算表明,滑坡整體穩定性較好,僅在遭遇度及其以上地震作用的情況下,堆積體前部靠黃家溝以南的第一期滑坡及靠後部北側曹家梁子的第四期滑坡堆積體才會失穩;因素敏感性分析表明,滑坡穩定性對地震(尤以強震)最為敏感。
  7. Aimed at this property hi which the effect of visco - elastic parameters appeared in late period, this paper proposes that parameters are not adopted as basic ones to predict settlement unless this computed parameters are similar in the course of back - calculation

    針對粘彈性參數對沉降的影響在固結後期才能明顯表現,提出通過對不同時間段觀測信息反演獲得的計算參數基本一致時,才可作為沉降預測的基本參數。
  8. Partial blind signature based on elliptic curve cryptography ensures that the e - cash is valid only in the period issued by the bank according to the withdrawal protocol, and the historical record of the e - cash that exceeds the valid period will be removed, which greatly reduce the amount of traffic and effort of calculation and improve the efficiency

    在取款協議中採用基於橢圓曲線的部分盲簽名方案,使電子現金包含由銀行頒布的有效期,超過有效期的電子現金歷史記錄將被清除,這樣減少了通信量和計算量,提高了執行效率。
  9. Although not a cash cost, depreciation or amortization is typically included in the calculation of eva as an economic cost for the use of the asset during the period

    雖然折舊或攤銷不是現金的支出,但它在eva的計算中是一種在某一時期內使用某資產的典型的經濟成本。
  10. Formulary period exceeds in filling capture time of a month, press patent year the fine for delaying payment of the corresponding amount of cipher out of method of the calculation in expending computation of fine for delaying payment to express

    在補繳時間超過規定期一個月的,按專利年費滯納金計算表中計算方法算出的相應數額的滯納金。
  11. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  12. First, we must specify the subjects of cost calculation, objects of cost calculation, period of cost calculation, scope of cost calculation, principles of cost calculation, cost items and asset depreciations

    高校教育成本的核算,首先必須明確成本核算主體、核算對象、核算期、核算范圍、核算原則、成本項目、資產折舊等理論問題。
  13. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  14. On the basis of theoretic analysis and numeric calculation, the author verifies that only is the ratio of the fundamental period of the structure to the disturbance period beyond 1. 4, it ' s possible to achieve reductions in both the relative displacement and the absolute acceleration responses

    作者在此基礎上,從理論分析和數值計算兩方面證明了粘性變阻尼控制僅在結構周期與激勵主周期的比值大於1 4時才有可能同時減小結構的位移反應峰值和加速度反應峰值。
  15. Based on the investigation of the average heat load during heating period and non - heating period, the paper conducts the distribution of heat load, thermodynamical calculation and economic index calculation for the union operation of various heating units

    根據調查採暖期和非採暖期的平均熱負荷,對不同類型的供熱機組聯合運行進行了熱負荷的分配、熱力計算及經濟指標的計算。
  16. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  17. The discussion of he nefworn of teaching calculation with an abacus during computer period

    淺議電腦時代的珠算教學問題
  18. Analysis and study are made on batch optimizing production, main production planning lay - out, important resource planning coordination method and calculation of safety in - advance period with mixed use of mrpii / jit

    採用mrp / jit混用思想,對生產批量的優化方法、主生產計劃編排原則、關鍵資源計劃協調方法、安全提前期的計算等進行了分析研究。
  19. ( 2 ) the disturbances are analyzed which are caused when signals with a few work frequencies are inputted. and the influence in the realization are also discussed such as calculation period and the quality of multibeamforming. they are solved by software and hardware methods - array processing with multiple dsp and low - passed re - filter

    ( 2 )根據本系統的多個工作頻率的特點,分析了各個工作頻率的輸入信號波束形成時造成相互干擾,以及對波束形成演算法的影響(如在dsp處理器中的實現的運算量、波束結果的質量等) ,提出相應的軟體和硬體解決方案? ?多dsp陣列處理和二次低通濾波,並進行了理論模擬。
  20. Based on these, it is discussed how to realize and simplify it in dsp system. the primary parameters of the hardware system are also estimated such as sample frequency, calculation period and the amount of memory

    並在此基礎上,分析了該演算法在dsp處理器中的實現以及運算量的初步簡化,估算了該波束形成演算法所要求的硬體系統載荷? ?運算量(計算周期) 、采樣率以及數據存儲量。
分享友人