calculation procedure 中文意思是什麼

calculation procedure 解釋
計算方法;計算程序
  • calculation : n. 1. 計算,計演算法。2. 推定,預測。3. 深思熟慮,精打細算;慎重的計劃;算計。
  • procedure : n. 1. 工序,過程,步驟。2. 程序,手續;方法;訴訟程序;(議會的)議事程序。3. 行為,行動,傳統的做法;(外交、軍隊等的)禮儀,禮節。4. 〈罕用語〉進行。
  1. It is verified with practice that the presented simulation calculation procedure based on the method has good applicative values

    實踐證明,採用該方法編制的模擬計算程序具有很好的實際應用價值。
  2. The use of matrices systematizes the calculation procedure and adapts the problem to a computer solution.

    應用矩陣可以使計算程序系統化,並可使問題適于用計算機求解。
  3. The calculation procedure with these expressions is straightforward.

    用這些方程式的計算程序是簡單易行的。
  4. In the process, we import the displacement method " s concept of replacement ahead, that is to say, we replace the unknown vectors with new unknown vectors to prevent the delivering and accumulation of errors. at the same time, we completed the skew bridge calculation procedure, and compared the calculation results with the results by the finite element software ansys, it proved the correctness and practicality of this procedure

    在矩陣傳遞的過程中引入位移法中的前進代入的概念,即將未知向量不斷的以新的未知向量替換,以防止誤差的傳遞和積累。本文完成了斜交格子梁橋的內力計算程序,並將計算結果與採用有限元分析軟體ansys分析計算的結果進行了比較,驗證了程序的正確性和實用性。
  5. When the simulation calculation procedure is applied to the rib - hoisting process of nannidu arch bridge, simplification model suited to the case is established, the pre - rising elevation on the rib - hoisting course is predicted, and real - time control is discussed

    將模擬計算程序應用於南里渡特大橋拱肋吊裝過程,建立了適合現場計算的簡化模型,預測了拱肋吊裝階段的預抬標高,並對吊裝過程進行實時控制。
  6. The main factors influencing heat load on lpg - bottle production line is pointed out, a calculation procedure and a example is presented, and example analysis is given in this paper

    摘要對鋼瓶熱載體烤漆爐熱負荷的影響因素進行了分析探討,初步提出了其熱負荷計算公式。通過計算實例,說明了影響烤漆爐熱負荷的主要因素。
  7. The principle of the neural network models is different from that of the real - time running models. the latter is designed on the engine running, so the effect of the control strategy on engine performance can be observed clearly. while the former works out the solution directly from the testing data, avoiding the complex calculation procedure

    神經網路模型與實時運轉模型的構成原理不同,實時模型以發動機運轉機理為設計依據,使于充分觀測控制策略對發動機各種性能指標的影響;而神經網路模型是根據己有的試驗數據進行直接推理,可避免大量的簡化、推導、求解過程,對于諸多機理繁復的發動機變量而言是一極佳的求解方案,因此就更全面的進行電控系統的調試評估考慮,兩種模型有著良好的互補性。
  8. Using the simulation calculation procedure imitate calculating vibration of the driver seat in sample car, the center of the compartment, distance 300 mm of the backboard of the compartment. the result of calculation and experimental result are relatively well identical. have shown the exactness of the vehicle vibration models that are set up and validity of the vehicle vibration simulation calculation procedure

    用該程序對樣車的司機座椅、貨廂中心、距貨廂后板300mm三處的振動進行了模擬計算,計算結果與實驗結果基本穩合,表明了所建立的車輛振動模型的正確性和車輛振動模擬計算程序的有效性。
  9. End - to - end delay of ethernet is analyzed, the expectation expression of queue delay and calculation procedure of send delay and transmission delay are presented

    從以太網端到端的通信延遲入手,給出了以太網排隊延遲的數學期望表達式,發送延遲和傳輸延遲的計算方法。
  10. The determination and calculation procedure of the heat balance of mechanized lime vertical kiln

    石灰機械化立窯熱平衡測定與計算方法
  11. The complex calculation procedure for vibration parameter of grain cleaning equipment

    糧食清理設備振動參數的綜合計算程序
  12. Based on the analysis of the calculation method of traffic lane number for the gate of container terminal, present design criteria and existing problem of the length design for buffer parking area of terminal entrance, this paper studies the arrival characteristics of container trailer and puts forward a calculation method based on random service system ( queuing theory ), for calculating the optimum traffic lane number and length of buffer parking area for the gate of container term ma1, with an explanation of the calculation procedure by an example, to serve as a reference for similar projects

    摘要通過分析集裝箱碼頭大門車道數的計算方法及其停車緩沖區長度的設計現狀、存在問題,根據集裝箱碼頭大門施掛車的到達特性,提出基於隨機服務系統(排隊論)的集裝箱碼頭大門最佳車道數及其停車緩沖區長度的計算方法,並通過示例說明該方法的計算過程,為類似工程提供參考。
  13. The design realm in the province of jilin, use more software is the bridge doctor system, bridge master, system of asbest, procedure of qjx and province highway of jilins survey to design the hospital to by oneself develop of the t beam plank beam painting procedure, the cover beam calculation painting procedure, a pillar calculation procedure, the upper part procedure compute a procedure mostly, even some procedures can paint, but the province painting of basic and dissatisfied foot jilin of born diagram paper style, the diagram paper the modification quantity compare greatly, the procedure that the lower part procedure adopts to by oneself

    在吉林省內設計領域,使用較多的軟體是橋梁博士系統、橋梁大師、 asbest系統、 qjx程序及吉林省公路勘測設計院自行研發的t梁板梁繪圖程序,蓋梁計算繪圖程序,樁柱計算程序,上部程序多是計算型程序,即使有些程序能夠繪圖,但生成圖紙基本不滿足吉林省繪圖風格,圖紙修改量較大,下部程序多採用自行編制的程序,但大多數程序是dos系統的程序,使用不方便,同時與現行規范多有不符。
  14. With the calculation principle and calculation procedure of the finite element method are described, the analytical feasibility of this subject is explained

    對有限元分析方法進行了概述,闡述了其計算原理和計算步驟,說明分析的可行性。
  15. In this paper, combined with an engineering example, the calculation procedure and theoretical foundation for the theoretic elongation of post - tensioned steel strand of parabola - shape has been given

    結合一工程實例,闡述了預應力鋼絞線理論伸長值的計算過程及理論依據。
  16. Secondly set up the well mathematics model during the hole precipitation of the base of horizontal well and worked out the three - dimensional finite element calculation procedure

    其次建立了水平單井在基坑降水中的數學模型並編制了三維有限元計算程序。
  17. In this paper, load carrying mechanism, lateral displacement, and design and calculation procedure of lightweight frame structure of multi - ribbed wall panel are studied with chief achievements as follows : based on the test, which a ten - story building model of lightweight frame structure of multi - ribbed wall panel with ratio 1 : 3 is studied though the pseudo - dynamic test, the wall is considered as a plane compound substructure, and space frame - plane compound substructure computational finite element model is given

    本文就密肋壁板輕框結構在彈性階段的受力機理、設計計算方法及側移進行了探討。主要完成下列工作:在10層密肋壁板輕框結構1 / 3比例房屋模型擬動力試驗研究的基礎上,將墻板視為平面復合子結構,建立空間框架? ?平面復合子結構有限元分析模型,對1 / 3比例房屋試驗模型進行數值分析。
  18. According to the forward analysis method based on iterative theory, the simulation calculation procedure of rib - hoisting on the long - span cfst arch bridge is worked out. in this procedure, the finite element theory and the formation of flexible cable unit is analyzed detailed

    根據基於迭代理論的前進分析方法,本文編制了大跨度鋼管混凝土拱橋拱肋吊裝模擬計算程序,對程序中的有限元理論、扣索單元的處理進行了詳細分析。
  19. On the basis of the input and output analysis to china railways, the author structures the freight rate dynamic adjusting model of china railway according to the change model of product price and the relationship among the interest rate, salary change and the direct consuming coefficient while providing the solution and calculation procedure of this model

    摘要在對中國鐵路進行投入產出分析的基礎上,根據產品價格變動模型以及利率、工資變化與直接消耗系數變化之間的關系構建了中國鐵路運價動態調節模型,並給出該模型的求解方法與計算流程。
  20. Capp ( computer aided process planning ) appears with the rapid development of modern machinery manufacture and computer technology. which makes use of the practical experiences of technician to process data, to make scientific decision, to create process regulations automatically, to aid the dimension calculation procedure, to plot working procedure drawings, to choose cutting parameter, to aid optimizing process planning and etc. and it also provides a powerful technological support for the digitalization, intelligentization and autoimmunization of process planning design

    計算機輔助工藝過程規劃系統( cappcomputeraidedprocessplanning )是伴隨著當代機械製造領域的轉型和計算機技術的迅猛發展而應運而生的,它在利用工藝人員的經驗知識和各種工藝數據進行科學的決策、自動生成工藝規程、輔助完成計算工序尺寸、繪制工序圖、選擇切削參數和優化工藝設計結果等方面的良好表現為工藝設計的數字化、智能化和自動化提供了很好的技術支撐。
分享友人