cantilever construction 中文意思是什麼

cantilever construction 解釋
懸臂結構
  • cantilever : n. 1. (橋梁的)懸臂,肱梁;支架。2. 電纜吊線夾板;紙條盤。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. To study the flexural behavior, ultimate bearing state and laws of internal force redistribution of prestressed concrete continuous beams cast by different construction methods, the model tests for three pieces of the continuous beams were carride out, in which three kinds of the construction methods, such as those of lowering formwork supports at one time, transferring simply - supported structure into the continuous one and casting the beam by cantilever construction, were considered

    摘要為研究不同施工方法下預應力混凝土連續梁的彎曲性能、極限受力狀態及內力重分佈規律,進行了3根連續梁模型試驗,分別考慮一次落架、簡支變連續和懸臂施工3種施工方法。
  2. The idea of cantilever construction is ancient in the orient.

    在亞洲古代就已實行過懸臂施工。
  3. The great new orlean bridge represents modern contemporary long-span steel cantilever construction.

    新奧爾良大鋼橋表現出了現代大跨徑鋼橋懸臂施工的技術。
  4. Statistical analysis of live load on continuous beam bridge of cantilever casting during construction

    懸澆連續梁橋主梁施工活載統計分析
  5. A movable temporary stay arrangement must be used to limit the cantilever stresses during construction to a reasonable level.

    必須採用一個可移動的臨時拉索裝置將施工過程中的懸臂應力限制在合理的范圍之內。
  6. Cantilever construction technology of triangle hanging basket

    三角掛籃懸臂施工技術
  7. Monitoring control for cast - in - place cantilever construction

    懸臂澆築中的施工監測控制
  8. Application of displacement back analysis to beam bridge ' s alignment control of cantilever construction

    位移反分析在梁橋懸臂施工線形控制計算中應用
  9. Precast segmental construction may adopt two methods generally : balanced cantilever construction and span - by - span construction

    預制節段拼裝施工一般可採用懸臂拼裝和逐跨拼裝。
  10. The basket symmetrical cantilever construction, which is often used, is one way of large - span bridge construction. with the length of cantilever longer, the risk is increased as well

    掛籃對稱懸臂施工是大跨度橋梁施工中常用的一種方法,隨著懸臂長度的加長,風險也隨之加大。
  11. The bridge has builded by balanced cantilever construction technique. the beam camber of construction is a controlling index of construction quality control. it is nonlinear, and now is not mature forecasting method

    該橋採用節段式懸拼施工法,其施工預拱度的控制是關鍵指標,目前沒有一個成熟預測方法。
  12. During cantilever construction of large span cable - stayed bridge steel box girder, the local relative deformation of steel box girder is obviously different between girder to be suspended and girder supporting crane

    摘要大跨度斜拉橋主梁懸臂拼裝匹配過程中,吊機作用梁段和被起吊梁段由於受力不同,相對變形存在較大差異。
  13. During the cantilever construction of main girder of a concrete cable - stayed bridge, the main girder at the temporary rigid fixity area of pylon and girder is vulnerable to cracking when the conventional temporary rigid fixity structure is used

    摘要在混凝土斜拉橋主梁懸臂施工過程中,採用傳統的塔梁臨時固結構造存在臨時固結處的主梁容易開裂問題。
  14. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措施提供了參考依據。
  15. In the segment precasting, cantilever erection and bridge deck construction during the paksey bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line

    摘要在paksey大橋的施工過程中,對節段梁的預制、節段梁的懸臂拼裝以及橋面體系的施工進行了精密的測量控制,從而使橋面線形與設計線形的誤差最小。
  16. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大橋為工程背景,對組成橋面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。
  17. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連接形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼接的樑柱連接節點與無拼接的樑柱連接及翼緣對接焊接腹板拼接的連接節點的對比,各種設計方法之間的對比,以及翼緣拼接和腹板拼接的螺栓間距、直徑和數量,拼接點與梁端之間的距離,梁和柱的翼緣、腹板厚度,柱的軸力,接觸面的摩擦系數,翼緣和腹板拼接板的厚度等因素的影響。
  18. Applying a spatial nonlinear fem modeling, the actual cantilever construction process of the cable - stayed bridge concrete girders was simulated, the tension forces of cables and the initialize heights of girders during construction are obtained respectively

    運用空間非線性有限元分析模型,模擬了混凝土斜拉橋主梁的懸臂澆築過程,求出各施工階段斜拉索的初始張拉力和主梁節段的立模標高。
  19. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  20. This paper conducts a study of nonlinear stability behavior of a long - span prestressed concrete rigid - frame bridge at cantilever construction stage respectively by means of buckling, collapse theories and 3d nonlinear digital models, discusses the stability characteristics of other similar bridges at the same construction stage, and also generalizes some helpful conclusions

    摘要分別採用屈曲理論和壓潰理論,利用三維非線性數字模型,研究了懸臂施工階段大跨度預應力混凝土剛構橋的非線性穩定行為,探討了同類橋梁懸臂施工階段的穩定性,得出了一些有益的結論。
分享友人