cascade development 中文意思是什麼

cascade development 解釋
級聯顯色
  • cascade : n 1 (陡巖落下的)瀑布;【園藝】人工瀑布。2 瀑布狀物;波形花邊。3 【物理學】級;級聯,串聯;【無...
  • development : n. 1. 發展,發達;進化。2. 展開;擴充;開發。3. 發達物,新事物,發展階段。4. 【生物學】發育(史);【軍,數】展開;【攝影】顯影,顯像;【音樂】展開(部);研製,研製成果。
  1. The research and development history in the field of auto cascade refrigeration cycle is reviewed. contrast to some traditional cascaded cycles and acrs, a new acr that employs a rectifying column is proposed

    在比較經典復疊循環和前人所研究的自動復疊製冷循環的基礎上,提出了具有精餾裝置的新型自動復疊式製冷循環。
  2. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同水平年黃河幹流梯級的滾動開發規劃,考慮不同年代補償效益的動態特性,採用黃河幹流梯級水庫補償效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯級電站的發電補償效益。
  3. Such abuse, it seems, induces a cascade of molecular and neurobiological effects that irreversibly alter neural development

    這種虐待似乎引起了一連串分子及神經生物層面的作用,產生神經發育過程中不可逆的影響。
  4. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域水電開發有限公司結合流域水電開發實際,通過建立流域水雨情監測網,開展群庫水、電、網多環節的大系統綜合調度研究,流域梯級電站控制模式研究、流域供電范圍及開發時序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子電站梯級調度實踐,在流域梯級電站統一調度研究方面已取得了初步的成果。
  5. All the problems mentioned above, restrict the cascade development of huanghe river ' s hydroelectric

    所有這些問題的存在,嚴重製約了黃河上游水電梯級滾動開發。
  6. Though the study of basic theory and solution of cascade development gradation, the author brought two projects of the gradation of cascade hydroelectric development of huanghe upstream

    通過三大問題的研究,為黃河上游水電實現梯級滾動開發奠定了重要的理論基礎,並對西部大開發戰略的實施具有重要的參考價值。
  7. This paper fully analyzed and discussed the progressive process of hydropower plant operation mode, the development process and trend of cscs ; simply introduced the regulations and demands of no operator on duty in hydropower plant ; analyzed all kinds of demand of cscs to implement no operator on duty ; in allusion to the running actualities of the operation management mode, analyzed the difficulties to implement no operator on duty in gehp ; put forward the reforming items for devices and equipment maintenance and demands of reforming of cscs to implement no operator on duty in gehp ; advanced a new concept and idea : " computer operator " and " computer operator director " ; and set up a new operation management mode - no operator on duty in gehp that is appropriate to three gorges cascade dispatch center ( tgcdc )

    本文全面分析論述了水電廠運行值班方式進步的過程和計算機監控系統的發展及其趨勢;簡要介紹了水電廠無人值班的規定和要求;分析了實行無人值班對計算機監控系統的各項要求;針對運行值班方式的現狀,分析了二江電廠實現無人值班的難點;提出了實現無人值班需配套進行的設備改造項目和適應無人值班的設備維護管理模式;重點分析了二江電廠實現無人值班對計算機監控系統改造的要求,提出了「電腦值班員」和「電腦值長」的概念和思路。建立了二江電廠在三峽梯調聯合調度模式下的無人值班管理新模式。
  8. In the end, the decision - making order of scrolling development of cascade hydropower stations is obtained under different power demands by comprehensive analysis

    然後運用多種方法進行分析,運用電力電量平衡方法論證開發方案的適應性,通過綜合分析得到了不同電力需求下的梯級水電滾動開發決策順序或者可接受的編序。
  9. Implementing unified dispatching of cascade hydropower stations in a river basin is essential for hydropower development in river basin to carry out the scientific concept of development

    摘要實行流域梯級電站統一調度,是流域水電開發落實科學發展觀的必然要求。
  10. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  11. Numerical simulation of the development of the secondary flow vortices and aerodynamic characteristics of a turbine rotor cascade

    透平動葉柵二次流渦系演變及氣動特性的數值模擬
  12. Therefore, the development of the smr from cascade mini ring ( cmr ) is described and the characteristics arid application of smr for synthetic ammonia plant is introduced

    本文介紹了從階梯短環到超級扁環的發展過程、技術特點和在合成氨氣體凈化中的應用。
  13. The hydropower cascade development is a complex work. it will involve many aspects of a compound ecosystem. but the quantitative study for basin environment effect is scarce and its theory and method system is still not integrated

    流域水電梯級開發是一項復雜而系統的工作,涉及到復合生態系統的多個方面,對流域開發的環境影響研究也一直都是理論界的一個研究熱點。
  14. Introduction to the development and application of software for short - term optimized dispatch of cascade hydropower stations

    梯級水電站短期優化調度軟體開發及應用介紹
  15. There is the complex relationship between affecting factors of scrolling development order of cascade hydropower stations, which brings a great deal of difficult of decision - making analysis of development order

    摘要梯級水電站滾動開發的影響因素間關系復雜,給開發順序決策帶來很大的困難。
  16. Article 16. the state shall encourage the development and utilization of hydraulic power potentials. on rivers rich with hydraulic power potentials, multipurpose cascade development shall be effected in a planned way

    第十六條國家鼓勵開發利用水能資源。在水能豐富的河流,應當有計劃在進行多目標梯級開發。
  17. Shui buya hydro - hinge is the upest cock step of three - step cascade hydroelectric power stations from upstream to down stream on the middle low reach of the main course of qingjiang river, which is going to be developped by hubei qingjiang hydroelectric development ltd after constructing ge he yan and gao ba zhou hydroelectric power stations

    水布埡水利樞紐是湖北清江水電開發有限責任公司繼隔河巖、高壩洲水電站之後,在清江中下游幹流上實施三級梯級開發的最上一級龍頭水電站工程。
  18. Development of rotating linear cascade facility for simulating blade tip clearance flow

    模擬葉尖間隙流的轉動平面葉柵實驗方案
  19. Under the premise of actuality of analysis of huanghe river ' s hydroelectric development, the author brought forward a strategically aim based on the cascade development system, found key technical issues of the development at present and in the near future

    本文從分析黃河上游水電能源開發現狀入手,提出以滾動開發體制為基礎的戰略目標,找出目前和近期開發中存在的主要幾個關鍵技術問題。
  20. Finally the author studied the pattern of cascade hydroelectric development of huanghe upstream, analyzed and retrospect china ' s hydroelectric development and management, integrated with chinese and abroad advanced pattern of management, brought out the pattern of the cascade hydroelectric development of huanghe upstream

    最後重點研究黃河上游水電開發滾動模式,分析回顧我國水電開發管理的歷史,結合國內外先進的管理模式,提出了黃河上游水電梯級開發的模式。
分享友人