change in construction 中文意思是什麼

change in construction 解釋
變換陣形
  • change : vt 1 改變,變更,變換,變革。2 交換;兌換;把(大票等)換成零錢;把(支票等)兌成現金。3 換(車、...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Four aspects are summed up : construction of new plantation production system according to the market ' s demand ; formation of industrial advantage by developing region agriculture, scale management and specialized production level ; change from the direct trade to processing trade of agricultural products ; attaching great importance to barley production, thus promoting the development of feed processing and food industrial. in the fourth chapter, the dissertation poses some necessary measures of the adjustment and escalation of hubei rural industrial structure. it mainly includes : deepening the property right system reform of rural land ; blazing new trails in the system ; reforming the rural science and technology mamgement system ; enhancing macroscopic regulation ; carrying out the cities and towns strategy ; reconstructing the structure of the agricultural development according to the comparative advantage law

    第四章,提出了湖北農村產業結構調整升級的配套措施,主要包括:深化農村土地產權制度改革,促進農業生產要素合理流動與優化配置;實行制度創新,促進農村資本市場發育,為農村產業結構調整升級提供資金保證;改革企業科技管理體制,用高新科技改造和武裝農業,為農村產業結構調整升級提供技術支撐;加強宏觀調控力度,為農村產業結構調整升級提供正確導向和有力指導;實施城鎮化戰略,促進農村產業結構整體優化;搞好農業市場定位,按比較優勢原則,重構農業發展格局。
  2. In education institutional arrangements of the construction process, exist different types of changing paths : change from the latent opportunity of an education institution for causing improvements of the efficiency ; be competed by exterior pressures ; the causable education institution changes due to the thought idea inside with target self - contradiction ; the causable education institution changes due to ultimate end value in mankind in institutional result violation

    在教育制度安排的建構過程中,存在四種不同類型的教育制度變遷的路徑:由改進效率的潛在機會所引起的教育制度變遷;由外部競爭壓力引起的教育制度變遷;因思想觀念中手段與目標之間的矛盾而引起的教育制度變遷;因制度的結果違背人類終極價值而引起的教育制度變遷。
  3. A conclusion can be drawn that the land market in the rural area and the urban area in our country are dissevered by the faulty land right system and the binary economic structure engendered due to the history cause. such land institution lead to many problems in the land resource allocation. firstly, the land in the rural area should shift, in order to meet the need of the urbanization, the development of the group enterprise and the change of labor structure in the rural area, but there are obstructions in the legal system, which lead to farmland and construction land shifting illegally

    在這種制度安排下導致我國土地資源配置中出現諸多問題:城市化的發展、鄉鎮企業發展以及農村勞動力結構變化都要求農村土地入市,但是法律上卻存在著障礙從而導致農地非法非農化和建設用地自發交易;在不完全的土地產權體系中農村集體和農戶利益受到侵害;國家利益隨著劃撥土地入市而大量流失;在割裂的土地市場制度下土地價格體系也出現城鄉割裂,農村集體土地不論是農用地還是非農用地的價格都未得到科學的界定和規范。
  4. Game analysis of engineering change in main body of construction project based on dissymmetry information

    建設項目主體工程變更行為博弈分析
  5. Presently has to emphatically take eight methods for it : taking township project for locomotive to earnestly do well the general grogram on new countryside and new pasture construction ; fulfilling " six great engineering " to accelerate township ' s basic facilities construction of new countryside and new pasture and reinforce socialistic affairs development ; implementing " transformation 、 expansion and promotion " three strategies to increase production and lift efficiency of agriculture and stock breed and raise farmers and nomads ' incomes ; accelerating policy support and financial investments to strengthen the development impetus in countryside and pasture ; further do well program work to lay fundament for prodding the economy rapidly developed in new countryside and new pasture ; enhancing farmers and nomads ' skill training to bring up a group of socialistic new - type farmers and nomads who being cultured, skillful and understanding managements ; entirely deepen the reform in countryside and pasture to enhance the driving force and vitality of development of new countryside and new pasture ; realistically respect and protrude the main body position of farmer and nomad to basically change their traditional value concepts on production and livelihood

    目前要著力採取八項措施:以村鎮規劃為龍頭,認真做好新農村新牧區建設總體規劃;實施「六大工程」 ,加速新農村新牧區村鎮基礎設施建設和社會事業發展;實施「轉變、拓展、提升」三大戰略,加速農牧業增產增效和農牧民增收;加大政策扶持和資金投入力度,增強農牧區發展的動力;進一步做好項目工作,為推動新農村新牧區經濟快速發展打好基礎;加速農牧民技能培訓,造就一批有文化、懂技術、會經營的社會主義新型農牧民;全面深化農村牧區改革,增強新農村新牧區發展的動力和活力;切實尊重和突出農牧民的主體地位,從根本上轉變農牧民傳統的生產、生活方式和價值觀念。
  6. The power industry of our country is fast growing, having made the enormous achievement in power construction, installed power - generating capacity and annual generation have already averagly leapt to the second place in the world, regional high voltage, main net shelf of the voltage grade of superelevation that most areas have formed transprovincially, electric short supply state is improved by a certain degree, power industry has supported the fast development of national economy effectively. after the obvious change takes place in the state between supply and demand of electric market, the current electric system exposes some drawbacks not meeting the needs of socialist market economy system. it is obvious to monopolize the systematic defect managed day by day, the market barrier has hindered the forming of the electric market transprovincially between provinces, has hindered the electric power resource from improving the whole competitive power of national economy, the country determines to further deepen the process of the electric system reform

    本文運用市場營銷學、電力需求側戰略管理的相關理論,從對電力需求側管理與營銷現狀、存在問題和特徵的了解入手,通過對電力市場宏觀環境和電力市場主體的分析,對電力需求側管理與營銷目標市場進行細分,確立了電力需求側管理與營銷目標市場並進行定位,進而提出了電力需求側管理與營銷成本領先、市場滲透的戰略選擇,在戰略選擇的基礎上重點對電力市場營銷策略進行了研究,提出了實施營銷戰略和各項策略必備的組織、保障措施,對實施中可能出現的問題進行預測並提出相關對策,從而初步形成一套電力市場營銷體系,以指導供電企業的電力需求側管理與營銷工作,提高增供促銷水平。
  7. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  8. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  9. In the moving that the urbanization enter the process inside, farmer to settle the door to move, not and always voluntarily of, because policy the oneness that compensate, change with environment, and the primitive society space construction breakup, personal body work attitude for edge for losing the etc, causing the this group incline toeing and bringing the some and social problem, in today changsha city farmer setting inside everyone ' s and personnel and concrete engineering technical personnel

    在城市化進程中,農民安置戶的拆遷並不總是自願的,由於政策補償的單一性和環境變遷、原有社會空間結構的瓦解、個人身份缺失等導致這一群體的邊緣化傾向及帶來若干社會問題,在今日長沙農民安置中各方參與人員的工作態度與具體工程技術人員在設計中不經認真調查簡單套用基於城市生活方式的住宅與小區指標也是造成這些問題的部分原因。
  10. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖預算,工程造價的預算採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  11. When examining the subject " construction of government office buildings ", the committee are seriously concerned that due to the change in the allocation of office space of the cheung sha wan government offices from the architectural services department to the rating and valuation department ( rvd ) at short notice, the submissions of the fitting - out plans for the rvd were delayed, resulting in the grant of extension of time to the contractor, and the estimated prolongation cost of $ 3. 27 million

    在研究有關「政府辦公樓宇的建造工程」的事項時,委員會深表關注的是,由於長沙灣政府合署內原先編配予建築署的辦公地方,在短時間通知下改為編予差餉物業估價署,以政差餉物業估價署的裝修圖則延遲提交,承建商因而獲準延長完工時間,估計工程延誤引致的額外費用為327萬元。
  12. However, it is a prevailing practice in highway projects in our country that the feasibility studies in the preliminary investigation and the appraisal of operation cost in later stage fail to carefully and thoroughly analyze the impact of those indeterminant factors on a proposed project and the probability of those factors. furthermore, in construction period, only those major uncertain factors ( say, wars ) are written in the contract as a part of unpredictable risks so as to rectify the responsibilities of the parties as named in the contract, but the minor factors ( say the change in drawings ) are not singled out but included in other contrast articles

    在國內公路項目前期可行性研究和後期評估運營經濟成本時,只簡單地對一些影響項目的不確定性因素羅列出來而沒有認真分析這些不確定性對整個項目影響的大小和其發生的可能性大小;在項目實施過程(施工階段) ,只是把一些大的不確定性(如戰爭)作為不可預見風險成為合同條款雙方分清責任的一部分,而一些小的(如施工圖紙的變更)一般不單獨列出,而包含在其它合同條款中。
  13. To solve horizontal thrust at arch feet and rheological change in soft soil is the first problem for arch bridge construction on soft soil ground

    在軟土地基上建造拱橋首先要解決拱腳處的水平推力以及軟土地基的流變問題。
  14. To meet olympic games, qingdao has more urban construction, traffic route too might change in recent years, ask to inquire concretly before coming

    因迎奧運,近幾年青島城市建設多,交通線路也可能有變化,來前請具體詢問。
  15. But because of an indeterminate flexible structure with many degree of redundancy, its variant inner force under dead - loading, nonlinear behavior and the correlation between construction method and completed structure, especially incessant conversion of system in construction method, these must bring many complicated change to construction internal force and displacement. these main factors resulting in construction control analysis become more important in the design of cable - stayed bridge

    但由於它屬于高次超靜定的柔性結構,恆載內力狀態具有多樣性、結構狀態呈非線性、施工過程與成橋狀態具有相關性,特別是在施工階段結構體系的不斷轉換,必然給橋梁結構帶來較復雜的內力和位移變化,這些特點使得斜拉橋的施工控制分析成為突出的研究課題。
  16. Nowadays especially, when great change in the army ’ s talents evaluation has taken place in terms of times and environment, interests and motivations, objective measurements, how to find an institution of talents ’ selection and the evaluation which is adapted to and embodied the characters and laws of the army in peace time, has become one of the crucial and basic problems in the army ’ s talents construction in new century

    特別是在軍隊人才評價的時代環境、利益動因、客觀尺度都發生著深刻變化的今天,如何尋求能夠順應、體現和平時期軍隊建設特點和規律的人才選拔考評制度,已經成為新世紀軍隊人才建設帶有關鍵性和根本性的重大問題之一。
  17. Section one making a change in people ' s minds to improve the residents learning ability. section two cultivating and further construction learning families and building groups. section three creating guarantee and mechanism for the construction of learning lots

    在這里,筆者嘗試從以下四個方面提出思考與對策: 轉變觀念提升居民學習力; 培育學習化家庭和樓組; 創設學習化小區的保障機制; 建立小區教育的操作體系。
  18. Classification and control of engineering change in construction project

    建設項目工程變更的分類與控制
  19. This paper mainly carries on research into quantity, degree and depth of luc, and landscape change degree in different economic zones of chongqing, comparative study of human driving forces causing different luc from qualitative and quantitative respects in different economic zones of chongqing, further investigation with cultivated land change and construction land change and driving force through analyzing proper human driving forces using principal components " analysis, multi - linear regression model, stepwise regression model, quantitative prediction of cultivated land and construction land in the following 10 years in the sample areas with the help of grey trend prediction model such as gm ( 1, 1 )

    本研究主要進行了不同經濟區土地利用變化數量、變化程度(速度、速率) 、深度以及景觀變化差異研究;從定性和定量兩個方面對引起不同經濟區樣點土地利用變化差異的人類驅動力進行對比性研究;通過選取適當的人類驅動力因子,利用主成分分析法、多元線回歸模型、逐步回歸分析法對人類驅動力所引起的不同經濟區的耕地、建設用地的土地利用變化進行深入研究;利用灰色動態預測模型gm ( 1 , 1 )對未來10年內樣點區耕地、建設用地變化進行預測性研究。
  20. The characteristics of land use change in this area are increase of arable land, urban construction and residents in rural areas and considerable decrease of natural grassland, furthermore the trend of land use type reducing to one occurred. the spatial change of land use structure shaping gradient from along the coast to the inland is one aspect of character of land use change

    土地利用變化的特點是耕地、城鎮建設用地、農村居民點用地增加,天然草地大量減少,土地利用類型有向單一化發展的趨勢,土地利用呈現出明顯的由沿海向內陸遞變的梯度型變化。
分享友人