china plant engineering 中文意思是什麼

china plant engineering 解釋
中國設備工程
  • china : n. 中國。n. 瓷器;瓷料,白瓷土,瓷質黏土。 a piece of china一件瓷器。
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. China plant engineering

    中國設備工程
  2. Yixing no. 3 engineering equipment plant is director unit of scrap rubber comprehensive utilization branch of china rubber industry association. it is located at the bank of beautiful taihu lake

    宜興市第三工程設備廠屬中國橡膠工業協會廢橡膠綜合利用分會會員單位,地處美麗富饒的太湖之濱
  3. At present, the plant is the largest base for producing hydraulic component is china and also onto the key enterprises in national engineering industry. there are 2, 258 employees, including more than 500technicians, eleven divisions, one technical developing center and two joint ventures ; yuci yuken hydraulics co. ltd. and yuci yinan hydraulic pumps co. ltd. in the period of

    榆液廠主要產品有液壓閥葉片泵輪泵柱塞泵液壓泵液壓站系統及液壓裝置等六大類產品,產品技術水平國內屬領先水平,企業液壓產品生產能力達
  4. A well known german heavy machine plant engineering company has a service workshop in china with location in shanghai chemical industry park fengxiang sub zone

    我公司是世界著名的重型設備製造商,在中國建立了一維修工廠,位於上海化學工業區奉賢分區。
  5. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  6. Mr. ma fuqiu science and technology dept., harbin engineering university, china gave a presentation entitled water turbine utilizing tidal current energy. he reviewed heu s study of the tidal current energy utilization and the " 70 kw tidal current energy test power plant " completed in 2002

    他回顧了哈爾濱工程大學在海洋能開發領域的科研成果,重點介紹了該校自行設計並在浙江省建造的我國第一座70kw潮流實驗電站「萬向號」的設計和研建情況,及其在擺線式水輪機和電站總體技術方面的水平。
  7. Enterprise s profile the plant is the largest base for producing hydraulics component in china and also one of the key enterprises in national engineering industry. there are 2, 258 employees, including more than 500 technicians, eleven divisions, one technical developing centre and two joint ventures : yuci yuken hydraulics co., ltd and yuci yinan hydraulic pump co., ltd, in the period of

    榆次液壓件廠以下簡稱榆液廠始建於1964年, 1965年引進日本油研成套液壓技術及工藝設備建成投產,是目前國內規模最大的液壓件生產基地,擁有職工2258人,專業工程技術人員500餘名,下設十一個生產分廠,一個技術中心兩個合資企業:中日合資榆次油研液壓有限公司和中港合資榆次銀安液壓有限公司。
  8. A. raymond china seeks a highly qualified individual to coordinate the management of its engineering division. working location is in jiang su, zhenjiang ( main plant )

    阿雷蒙緊固件(鎮江)有限公司現尋求工程部經理一名,工作地點在江蘇鎮江。
  9. Aiming at the actuality of chinese building engineering bidding and the problem faced in the practice, i study the purification engineering bidding of zhuzhou no. 4 water plant. on the basis of my study, i offer proposals for how to standardize and improve the current bidding work of china, how to keep up with the international tradition and how to build bidding system of open, equity and fair competition

    本文以我國經濟轉型和加入wto為背景,針對我國建設工程招標的現狀和實踐中反映的問題,通過株洲四水廠凈水工程招標研究,指出如何規范和改進當前我國招標工作,如何盡快與國際慣例接軌,建立公開、公平、公正的招標交易制度。
  10. Many gas - turbine & steam - turbine combined - cycle power plant ( ccpp ) have currently being constructed in china, and acceptance test of units in ccpp are one of important work in the engineering construction

    目前我國正在興建一批燃氣-蒸汽聯合循環電站,機組性能驗收工作是工程建設中的主要內容之一。
分享友人