  1. Seller agrees that its failure to submit such claim or claims within the applicable time period will constitute a waiver thereof unless seller requests in writing, prior to expiration of the applicable time period, an extension for making its claim and such extension is granted by purchaser in writing

    除非賣方在上述規定時間期滿前以書面形式要求延長可申明要求的期限,並該延期要求得到買方書面的許可,則賣方同意,賣方若在規定時效內未提出相關要求可視作為自動放棄要求的權力。
  2. Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer

    文摘:在工期延誤處理時,工期索賠計算應特別注意:由於網路的關鍵線路可能發生變化,且實際進度計劃要考慮時差的合理利用,因此工期索賠不能僅按網路圖計算,而要考慮工期延誤原因的實際發生時間,按經監理工程師批準的實際進度計劃計算。
  3. This thesis mainly analyses the claim for extension of time and financial claims. through collecting a good deal of relational material, the thesis puts forword analysis methods and calculation models of the two sorts of claim

    在此基礎上,本文重點研究了工期索賠與費用索賠,通過總結歸納大量文獻資料,較為系統地提出了兩類索賠的分析方法與計算模型。