closed bridge 中文意思是什麼

closed bridge 解釋
前後端用隔艙壁圍起的橋樓室
  • closed : adj. 1. 關閉著的,封閉著的;密閉著的;保密的。2. 〈美國〉準備好了的;定了契約的。3. 【語音】閉音節的。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. The bridge of closed combination for staff of agricultural mechinery and agronomy

    農機與農藝工作者密切合作的橋梁
  2. After the exhibition closed the bridge was dismantled.

    在展覽會結束以後,拆除了這座橋。
  3. You should try driving on bay shore route, as dusk closed in. rainbow bridge in setting orange sky and the twinkle grand ferris wheel at palette town are must - viewing

    以夕陽映襯的桔紅色天空為背景的彩虹橋,還有夜空中閃耀的都市調色板的游覽車的燈飾,相信這樣的景色你一定不願錯過!
  4. Canopy : when the boarding bridge connecting with an aircraft, the canopy forms a closed passage between the boarding bridge and the aircraft to protect passengers from being exposed to sun, wind and rain

    遮棚:當登機橋與飛機連接時,遮棚使飛機與登機橋之間形成封閉通道,保障旅客免受日曬、風吹、雨淋。
  5. From the 1950 s to the 1970 s, hong kong was able to achieve industrialisation early and establish itself as the bridge for regional economic and trade co - operation through its geographical location. one of the main reasons for our success was china s closed - door policy and, excepting japan, the less advanced state of development in the asia - pacific economies in general

    上世紀五十年代至七十年代,香港能夠率先實現工業化,並以其超然的地位充當了區域經貿合作的橋梁,其中很重要的一個原因,是當時祖國內地沒有開放,而除日本外,亞太地區普遍經濟發展水平仍然較低。
  6. I remembered coming out ten years ago , walking the last stretch across the lohu bridge with its rough wood floor closed in on both sides by guardhouses and fences

    我記得十年前出來的時候,走羅湖橋上最後那段路,腳下踏著粗木板,兩邊的崗哨和鐵網逼得很近。
  7. To prevent people committing suicide by jumping off the bridge, the tsing ma management limited has stepped up surveillance such as asking their staff to stay more alert when monitoring the operation of the bridge through the closed circuit television and to increase the frequency of patrolling

    青馬大橋並無行人設施,市民難以走近。為免有人跳橋自殺,青馬管理有限公司已加強監察,例如提醒員工在利用閉路電視監察大橋的運作時保持高度的警覺性,以及增加巡邏次數。
  8. Bridge will be closed with details below

    ,汀九橋的以下路段將于下列時間臨時封閉。
  9. Ting kau bridge will be completely closed to road traffic

    汀九橋會完全封閉,不準車輛使用。
  10. The bay bridge was still closed, so ( or so that ) the drive from san francisco to the berkeley campus took an hour and a half

    海灣大橋仍然關閉著,因此(或者從舊金山開到伯克利的校園用了一個半小時。
  11. Both software and hardware are synthesized. three - phase bridge inverter used, the current in each phase is made similar to sine wave using current closed loop control

    以igbt三相橋作為主逆變電路,對電機繞組電流按正弦規律進行電流閉環控制實現正弦波細分驅動。
  12. Forty at the new bridge, they have the center lane closed

    新橋路段的40號大道已關閉主幹道
  13. Sha tin both carriageways of sand martin bridge and a section of the cycling track between sand martin bridge and banyan bridge on both sides of the shing mun river will be closed to traffic and bicycles from 7 am to 2 pm

    (二)沙田:沙田沙燕橋來回行車線及介乎沙燕橋及翠榕橋的城門河兩岸單車徑將于上午七時至下午二時封閉,不準車輛及單車使用。
  14. In the design of real - time control system, the paper takes three - phase full - bridge mosfet inverter as the real - time control main circuit, and adopts a control scheme with 120 ? switching mode combined with half - bridge pulse width modulation ( pwm ), which would avoid straightthrough short of a certain bridge. phase current is detected by single current sensor ; three - phase position signals generated by position sensors could not only supply commutation information for inverter, but also be used for speed detecting based on signals " period measurement, which makes the speed sensor unnecessary. the whole control system adopts speed and current dual closed - loop control strategy in order to construct a high performance rare - earth permanent magnetic brushless dc motor ( repm bldcm ) full - digital real - time control system

    在實時控制系統的設計中,本文以三相全橋mosfet逆變電路作為實時控制主電路,採用120導通方式結合半橋pwm調制的控制方案,從而有效地避免了橋臂的直通短路;本文用單電流傳感器實現對相電流的檢測,來自位置傳感器的三相位置信號不僅為逆變電路提供換相信息,而且也用於基於信號周期測量的轉速檢測,這樣就省去了速度傳感器;系統採用的是速度、電流雙閉環控制策略,力求構建高性能的稀土永磁無刷直流電動機全數字實時控制系統。
  15. Meanwhile, those bridge - concealing tunnels are there for good reason. if a particularly severe typhoon struck hong kong and the bridge had to be closed to road traffic, the trains would still be able to get through in either direction with passengers and their luggage. planning for a new airport operating 24 hours a day began in the 90s when it was obvious that the former kai tak airport in urban kowloon, limited by noise restrictions, could never cope with ever - increasing air traffic

    青馬大橋除創造世界最長同類型吊橋紀錄外,包括青馬大橋在內的機場核心計劃還於1999年榮獲美國建築界權威及編輯選為二十世紀十大建築成就獎得主之一,與巴拿馬運河、英法海峽隧道及三藩市金門大橋等其他九項工程同享殊榮。
  16. Centre lanes both directions of the ting kau bridge will be closed to road traffic by displaying a " red cross " lane use signal

    汀九橋中線來回方向展示紅交叉信號時,禁止所有車輛使用該線。
分享友人