comparison bridge 中文意思是什麼

comparison bridge 解釋
比較電橋
  • comparison : n. 1. 比較,對照;類似。2. 【語法】比較法;【修辭學】比喻。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension bridges.

    以上鋼橋面重量的比較指出,斜拉橋介於連續梁和懸索橋之間。
  2. We made use of wheatstone bridge to control ratio of heating power between the samples, thus, it enable to control and measure the differential heating power accurately. consequently, it improves sensitivity of the system. the resolution of the measurement can reach from 1 : 1000 to 1 : 10000 or better in comparison with the traditional differential technique

    我們測量了聚苯胺及其摻雜鹽酸后在1 . 8k至45k的熱容,利用聲子分形子模型來處理非晶態對比熱的貢獻,對獲得的數據進行處理,發現eb和es的比熱數據均不符合德拜理論,超出德拜模型的比熱來源於非晶態的貢獻。
  3. The contents include : based on the previous research and the data of experimentations, the author researches and develops a kind of satisfactory semi - empirical formula of nonlinear temperature distribution, and calculates the temperature stress of rigid - framed arch bridge by the fem. the temperature effects of bridge structure by annual and sunlight temperature difference are discussed, it indicates that the temperature effect of annual temperature difference is small but the temperature effect of sunlight temperature difference is great and the temperature stress along beam depth resulted from sunlight temperature difference is nonlinear. with the comparison between the temperature effects of different position of bridge, the results show that where the section of bridge is small, the temperature stress of it is large

    本文主要包括以下內容:從理論上研究並結合實測資料發展了一種比較理想的半經驗溫度場非線性分佈公式,並將有限元方法應用於剛架拱橋結構溫度應力的計算中,對橋梁結構進行整體溫度應力分析;討論了年溫差和日照溫差引起的橋梁結構的溫度效應,表明年溫差引起的溫度效應較小,而日照溫差引起的溫度應力較大且沿梁高呈非線性分佈;分析比較了橋梁結構各個部位的溫度效應的大小,可知截面越小溫度拉應力越大,受力越不利;並對箱梁結構由於構造不同引起的縱向與橫向的溫度效應大小進行了探討,發現在頂板下緣也會出現相當大的溫度拉應力,並且梗腋的存在反而增加了頂板底部的溫度拉應力;還對幾種相近的剛構式橋型的溫度效應進行了分析對比,總結了這些橋型針對溫度效應的優劣,並提出相應的針對性措施。
  4. The design works of top - part structure of qing liang jiang bridge was according to the requirements of proposal and regulated issues / regulations after the comparison of various designs

    本設計是根據設計任務書的要求和相應規范的規定,對清涼江橋上部結構進行方案比選和設計的。
  5. 3, the output linear resolution of the bridge is about to 0. 84 % and has a better property in comparison of some typical mr angular sensors. 4, the output sensitivity of the bridge is about 1. 0667mv / and better than ferrimag angular sensors

    4 ,該自旋閥晶元組成的橋路輸出的靈敏度達到了1 . 0667mv ,相對于強磁性薄膜為敏感元件的角度傳感器有了很大的提高。
  6. The analysis of shaking reason for the pedestrian bridge in chongqing and comparison of the reinforcement method

    重慶某公園架空梯道晃動原因分析與加固方案
  7. Based on comparison of several motor candidates, doubly salient permanent magnet ( dspm ) motor is a good choice for it ’ s outstanding performance. similar to conventional drive system, dspm brushless dc motor ( dspm - bldcm ) is composed of dspm motor and it ’ s controller. the controller is made up of three - phase full - bridge inverter, driver, dsp control unit and etc. for high power system, every switch of three - phase inverter is actually made up of four mosfets in parallel

    在充分考慮國內外不同的液壓泵電動機的基礎上,本文選用了雙凸極永磁電機作為整個系統的電機本體,並配以電動機控制器(控制器包括三相橋式功率變換器、驅動電路、 dsp主控單元、電流采樣及預處理和位置采樣及預處理等主要部分)組成整個液壓泵電動機系統。
  8. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用面向對象的數據封裝和繼承技術實現了項目管理和方案數據的安全保護; 3 、選擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平面拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編程技術,實現了平面、縱斷面、橫斷面三種圖形的對比顯示,實現了縱斷面交互設計、橫斷面定線和橋隧工程設置; 6 、就縱斷面優化在線路方案比選工作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱橫斷面地面高程、自動設橋、自動設隧數學模型。
  9. In the fourth chapter, based on the analysis and design of some modules closely relating to interactive design, the thesis completes the development of the railway location interactive design subsystem, and these modules are : railway horizontal line interactive design, comparison of plane, profile and across section, automatic and interactive design of profile, designing railway location by across section and setting location of the bridge and the tunnel

    第三章分析了線路方案比選工作過程中所涉及的數據情況以及數據管理方法,完成了方案比選綜合數據管理子系統的開發工作,第四章通過對線路平面交互設計、內插縱橫斷面地面高程、縱斷面自動與交互設計、橫斷面定線、橋隧工程設置等與交互設計密切相關的重點模塊的分析與設計,完成了互動式線路設計子系統的開發。
  10. In view of at present on the solid bridge the high - damping rubber dampers use the press capability of high damping rubber, the material utilization ratio is low, in this paper, the high damping rubber shearing damper has been put forward. by way of shearing capability trial of the high damping rubber damper test objects, the effects of laws concerning frequencies, temperatures and layer ' s thickness on the behavior of the damper are obtained ; and one kind of simple and convenient design method of high damping rubber shearing damper has put forward. finally high - damping rubber shearing damper is in simple comparison with viscous shearing damper

    鑒于目前實橋上高阻尼橡膠圈是利用的高阻尼橡膠的擠壓性能,材料利用率低,本文提出了剪切型的高阻尼橡膠減振器,通過高阻尼橡膠減振器試件剪切性能試驗,獲得了頻率、應變幅值,厚度等各種參數對高阻尼橡膠減振器試件的影響規律,並提出了一種簡便的高阻尼橡膠剪切型拉索減振器的設計方法,最後並與粘性剪切型阻尼器做了簡單比較。
  11. 2, design a structure makes the liner output higher to 160mv with a liner input about 150 in bridge of spin - valve gmr. in comparison of some typical mr angular sensors it ' s output make a great progress

    2 ,設計了一種結構使自旋閥gmr晶元組成的橋路輸出電壓信號線性區達到約150 ,輸出幅度達到了160mv ;相比一些典型的磁阻非接觸式角度傳感器,量程獲得了可觀的擴展。
  12. Comparison and selection of reinforcing and transforming programs of yellow river road bridge at hukou

    壺口黃河公路大橋加固改造方案比選
  13. Comparison and selection of construction schemes and main methods of construction for minjiang river bridge in youxizhou

    尤溪洲閩江大橋主橋施工方案比選及主要施工方法
  14. Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge, conclusions are made as follows : with static reinforcing, the vibration amplitude can be suppressed to some extent, but quasi - resonance of the bridge can not be avoided, moreover, the construction is inconvenient and costly. with option of two bridge connection, the effectiveness of vibration suppression is clear ( the damping ratio approaches 50 % ) and it is fairly economic and easy, however, the quasi - resonance of the bridge can not be avoided either. with dynamic option ( mtmd option ), the quasi - resonance of the bridge can be effectively avoided ( the damping ratio is up to 51. 38 % as tested in field ), moreover, the construction cost is low, and the construction is simply and convenient

    通過對目前抑制鐵路上承式鋼板梁橋橫向振動的幾種方案進行定性的分析和比較,認為:靜力加固方案可以使橋梁振幅有所減小,但不能避免準共振現象的發生,而且工程造價較高,施工也不方便;兩橋連接方案減振效果明顯(減振率近50 % ) ,比較經濟也比較方便,但同樣不能避免準共振現象的發生;動力減振方案( mtmd抑振方案)可以有效的抑制橋梁的準共振現象(現場試驗中減振率達51 . 83 % ) ,而且工程造價較低,施工簡單、方便。
  15. Abstract : at first, the shaking table test of a gravity pier model was done. the comparison between the test data and the theoretical analysis results of the model showed that they are identical to each other. the dynamic model of a whole bridge with gravity piers and lead - rubber bearings was set up. the positive role of lead - rubber bearings on lowering the seismic responses of railway bridge and the seismic character of gravity piers were analysed. some earthquake resistance measures of railway bridge with gravity piers were put forward

    文摘:首先進行了重力式橋墩模型振動臺模擬地震試驗,試驗與理論分析結果基本一致;然後建立了採用鉛芯橡膠支座的重力式橋墩橋梁全橋體系動力分析模型,計算分析了鉛芯橡膠支座對橋梁的減、隔震作用及重力式橋墩的抗震性能,提出了重力式橋墩橋梁的抗震措施。
  16. The test for simulating load spectrum of bridge was done, comparison of the infered load spectrum by means of the electrical resistance changes of two fatigue life gage with the simulated load spectrum showed reasonably good agreement

    進行了模擬橋梁荷載譜加載試驗,用雙疲勞壽命計電阻變化所推算荷載譜和模擬荷載譜基本一致,證明了方法的可行性。
  17. The formation of jinma bridge, projects comparison, new design method and calculation both on static and dynamic and the detail problems were presented in this paper in order to investigate this new structure and analyze the detail problems of this design. the main contents and the final conclusions of this thesis are as follows : 1

    為了研究這種新型橋梁的結構形式,並對結構設計中一些問題做深入地分析,本文對金馬大橋的方案比選、設計思路、協作體系結構的形成過程、結構的靜力、動力計算以及局部構造等方面進行了全面地分析研究。
  18. The thesis refers to several facets below, ( 1 ). discuss important meaning of the deflection monitoring of the dafosi bridge of changjiang river and introduce the principle of existing deflection measurement methods of bridge so far. through comparison and analysis, bring forward the research content based on the connected pipes methods

    簡要闡述了大佛寺長江大橋撓度監測的重要意義,簡單介紹了國內外現有的撓度測量方法的原理,通過比較分析,在連通管測量方法的基礎上提出本文研究的內容。
  19. Verification regulation of dc comparison bridge

    直流比較電橋檢定規程
  20. In comparison with the apups, the results have shown that the surface states of the hollow site are in good agreement with the experiment. so we concluded that the hollow site model is favourable for the gaas ( 113 ) ( l xi ) surface and the bridge site model should be e xcluded. 3

    3 .其他工作除此之外,論文還對鉛鹽pbte 、 pbse 、 pbs ( 001 )表面電子結構, ybco超導體表面氧特性、金屬ti和ni在金剛石表面的吸附和擴散等特性進行了研究。
分享友人