completion of works 中文意思是什麼

completion of works 解釋
工程竣工
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  • of : OF =Old French 古法語。
  • works : 的印表機描述格式
  1. Group leader : responsible for coordination of group works, design and completion of the preliminary model, finical management, group photography, group purchase, manufacture, cable arrangements, writing the final report

    組長:負責小組工作協調、初步模型設計與製作、財務管理、小組攝影、小組采購、現場加工、配線、書面報告之設計篇撰文。
  2. In order to gain an indulgence, one must renounce all attachment to sin, even venial sin, and be in the state of grace at least at the completion of the prescribed works

    為獲得大赦,信友必須放棄對罪惡包括小罪的任何依戀,並至少於完成指定的善工時,處于恩寵狀況。
  3. The ( name of employer ) now invites sealed bids from pre - qualified eligible bidders from member countries of adb for furnishing the necessary labor, materials, equipment and services for the construction and completion of the works

    業主名稱)現從adb成員國中邀請有預選資格的合格投標者進行密封投標,為實施及完成工程提供所需要的勞務、材料、設備及服務。
  4. On completion of building works, the t2 competent person as recognised by the buildings department, and the registered structural engineerregistered professional engineer employed by the applicant shall jointly certify and submit to the district lands officer a construction completion report

    建築工程完成後,申請人所聘用符合屋宇署認可的t2合資格人士,及注冊結構工程師注冊專業工程師須向地政專員提交一份聯合簽署的興建完成報告。
  5. The completion of the tai po treatment works is a milestone in the continuing efforts of the government to provide drinking water to meet hong kong s rapid development

    大埔濾水廠落成啟用標志政府致力提供充足優質的食水,以配合香港在迅速發展下的食水需求。
  6. 8 on completion of the decontamination works and before starting the proposed housing development at the project area, the permit holder shall submit the final soil quality report of the previously contaminated areas to the eia sub - committee of the advisory council on the environment for inspection

    在工程項目范圍完成除污工程后及在展開建議的建屋發展計劃之前,許可證持有人須向環境諮詢委員會環評小組委員會提交先前受污染地帶的最終土壤質素報告,以供查閱。
  7. By the end of 1931, despite the completion of the aberdeen upper reservoir, the dam reconstruction for the lower reservoir and sediment removal works were still pending

    香港仔上塘於1931年底建成后,仍需進行下塘改建工程及挖掘沉沙工程。
  8. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  9. The completion of the works is a remarkable milestone in relieving the residents of the north district from the perennial flooding menace. the five - year river training works, with a total cost of 1. 2 billion, have upgraded the capacity of the river channels to cater for one in 50 year rainstorms

    拓展署完成新界北區梧桐河盆地的治河工程,將河道提升到五十年一遇的排洪能力,整套治河工程總共耗資十二億港元,施工期歷時近五年多。
  10. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署長黃鴻堅今日(九月十七日)在梧桐河、雙魚河及石上河主要排水道工程竣工典禮上致辭時表示,整項梧桐河盆地的治河工程涉及上述三條位於新界北區的主要河道,規模龐大,新河道總長約9公里,將原來迂迴曲折的河道拉直及擴闊,並且將河堤加高及重置受工程影響的原有設施,包括12條過河橋梁。
  11. The facilities to be handed over to government or utility companies after completion of the construction works include the reprovisioning works for the tsim sha tsui fire station complex, the police post and the electricity substation, as stated in section 8. 4. 2 of the ifp, and the reprovisioning or modification works for some existing facilities within the development area, like the kowloon south no. 2 salt water pumping station and twin cell box culvert

    須在建築工程完成後移交政府或公用事業機構的設施,包括尖沙咀消防局綜合大樓的重置設施、警崗和電力支站(見發展建議邀請書第8 . 4 . 2節) ,以及發展區內一些現有設施的重置或改建工程,例如九龍南二號海水抽水站和雙管箱形暗渠。
  12. 17 " subcontract price " means the agreed amount stated in the agreement for the design, execution and completion of the subcontract works and the remedying of any defects

    "分包合同總價"指就分包工程設計,實施和竣工,及維修其所有缺陷,而在合同協議中所述的約定金額。
  13. Following the completion of the improvement works, the entire lo wu cross - boundary footbridge will be enclosed with glazing and cladding and widened by seven metres

    羅湖跨境人行橋改善工程完成後,整條橋會裝上玻璃幕墻,橋身亦會擴闊七米。
  14. The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project

    兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。
  15. In case of unsatisfactory progress of works, the department concerned may, in accordance with the contract conditions, request the contractor to step up the progress by deploying suitable staff and resources so as to ensure the timely completion of works

    但若工程進度未如理想時,部門有權按合約上訂明的條文要求承建商採取適當的人手及資源調配改善進度,確保原定的完工日期不會受影響。
  16. Because settlement after completion of works is the key index of soft soil treatment, it is so important to calculate the final settlement accurately during the construction period

    由於工后沉降是決定軟基處理成敗的關鍵指標,因此施工期間最終沉降量的預估十分重要。
  17. Figure one illustrates the diagrammatic layout of an isolation room that meets the highest infection control standard. upon completion of works, the nine hospitals would provide a total of about 520 rooms with about 1 290 beds for isolation purpose

    當工程完成後,該九間醫院將設有約五百二十間房間合共約一千二百九十張病床作隔離之用。
  18. The conventional stack - preloading method which we use at present can not meet the requirement of stabilization, time limit of construction and the settlement after completion of works, so a new kind of technique is to be introduced to soft soil treatment

    高速公路的建設必須首先對這種地基進行處理。目前,常規堆載預壓法很難滿足施工穩定、工期和工后沉降的要求,必須採用新的技術措施進行處理。
  19. Certificate of completion of works

    工程竣工證書
  20. In recent years, highway is developing rapidly in our country. the value of settlement after completion of works is high in the point view of built highway on the soft soil region, which produced a big problem called bumping at bridge - head

    近幾年來我國高等級公路發展迅速,從已建軟土地基高等級公路運行情況看,工后沉降特別大,造成「橋頭跳車」是目前存在的主要問題。
分享友人