completion risk 中文意思是什麼

completion risk 解釋
建成風險
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  1. By the turn of the century. the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    多項梧桐河防洪計劃的設計工作正在進行,預計完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可減低發生水浸的危險。
  2. Protection against flooding is being improved in the area. the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    梧桐河防洪計劃多項工程正進行得如火如荼,竣工日期均已訂出,務使工程與深圳河治理工程配合,以期在二零零二年或之前減低水浸風險。
  3. The risk discount rate of shaanxi relics tourist project finance is based on the theory of capital asset pricing model, and accorded with capital market joined in the project. founded upon the research of risk - free rate ( rf ), capital market average advantage rate ( rm ), risk coefficient ( ) and etc. this discount is the basic payoff that can reflect risk and earning in relics tourist project correctly. to define this risk discount rate has a practical significance for large relics tourism project, also, it is instructive to the negotirfim befor the project, the control of risk periold of exercise and the completion of the project

    陜西遺址旅遊項目融資風險貼現率的確定是以資本資產定價模型為理論基礎,以與項目相關的資本市場為依據,在對項目的無風險收益率r _ ( f , )資本市場平均收益率r _ ( m , )和項目風險系數等參數的定量研究的基礎上分析得來的能正確反映陜西遺址旅遊項目開發過程中的風險與收益之間關系的期望收益率。
  4. Work on the risk management guide is nearing completion

    風險管理指導方面的工作已近完成。
  5. The river training works at the river indus basin to relieve the risk of flooding in the fanling and sheung shui area continue. these works are scheduled for completion in 2003

    為紓緩粉嶺和上水區水患的梧桐河盆地河道治理工程仍在進行,工程預計在二零零三年完成。
  6. " with the completion of the river training works in the lower river indus, river beas and river sutlej in early 2002, the flooding risk in kwu tung, ho sheung heung, long valley and tak yuet lau had been substantially alleviated, " mr wong said

    黃鴻堅說:梧桐河下游、雙魚河和石上河的河道治理工程,在二二年年初完成,大大紓緩古洞、河上鄉、 ?原及得月樓等一帶水浸黑點的水浸威脅。
  7. The stage i and stage ii works of the project have been completed. together with the completion of river training works in the lower river indus and the river beas, the traditional flood - prone villages in lo wu and ho sheung heung areas are no longer at risk

    第一期和第二期的工程已經完成,加上梧桐河下游及雙魚河的河道治理工程業已竣工,羅湖及河上鄉一帶一直易受水浸影響的鄉村已不再受威脅。
  8. The old lo wu railway bridge and the lo wu old pedestrian bridge formed a serious bottleneck for flood flows. upon completion of the bridge work and improvement of the river section at lo wu in early 2004, the bottleneck at lo wu will be removed and the flooding risk upstream of lo wu can be reduced in time for the 2004 wet season

    他指出,現有的羅湖鐵路橋和羅湖舊行人橋形成嚴重的瓶頸地帶,這兩條橋的重建工程以及羅湖河段的改善工程於二四年年初完成後,羅湖的瓶頸地帶將會消失,而羅湖上游在二四年雨季的水浸風險亦將會減少。
  9. Further guidance will be provided to staff where necessary upon completion of the review to help the risk - based approach to bed down more firmly and ensure that the quality of work done by staff is of a high standard

    如有需要,金管局將于完成檢討后為監管人員提供進一步指示,以使風險為本監管制度奠立更穩固的基礎,並確保監管人員的工作達到優質水平。
  10. Construction of the san tin eastern main drainage channel commenced in october, and, upon its completion in 2005, the flood risk in san tin will be reduced. design work for the san tin western drainage channel is under way

    新田東的排水渠工程於二零零二年十月展開,於二零零五年完成後,新田一帶的水浸風險將可減低;另一方面,新田西的排水渠工程設計工作正在進行中。
  11. Contradiction between loan credit risk management and loan business development becomes more serious ; 2. the internal rating - based system is far from completion, so loan credit risk management is not efficient enough yet. 3

    1999年以前我國國有商業銀行貸款信用風險具有「雙高」 、 「兩低」 (即高不良貸款余額,高不良貸款率;低收息率,低撥備覆蓋率)的典型特徵。
  12. The reactor protection system reliability analysis is the indispensable branch of the model of probabilistic risk assessment of daya bay npp. the completion of this project will consummate the model of probabilistic risk assessment

    反應堆保護系統可靠性分析是大亞灣核電站的pra模型不可或缺的部分,該項工作的完成將使得pra模型更加完善。
  13. The internal auditing department shall inform the compliance department of the auditing situation and conclusion upon completion of the internal auditing, while the latter may, in light of the compliance risk monitoring situation, take the initiative to propose suggestions to the former

    內部審計部門在審計結束后,應當將審計情況和結論通報合規管理部門;合規管理部門也可以根據合規風險的監測情況主動向內部審計部門提出審計建議。
  14. The survey has also shown that the banks have adopted appropriate underwriting criteria to address the project completion risk, borrower default risk and liquidity risk of equitable mortgage loans

    該調查發現銀行已採取適當的貸款準則,以處理樓花按揭涉及的項目完成風險借款人信貸風險及樓宇買賣流動性風險。
  15. This thesis not only gives the general description on basic concept, usual practice of project finance and risk management, but also provides the case study to illustrate the main six risks in china, which are credit risk, completion risk, management risk, political risk, economic risk, and environment - protecting risk

    本文不僅對項目融資以及風險管理的基本概念、主要特徵做了較為系統的闡述,還結合我國項目融資中的典型案例,分析了構成我國項目融資主要風險的六大風險,即信用風險、完工風險、運營風險、政治風險、經濟風險和環保風險。
分享友人