complicated zone 中文意思是什麼

complicated zone 解釋
復雜地帶
  • complicated : adj. 復雜的,錯雜的,混亂的,麻煩的。adv. -ly ,-ness n.
  • zone : n 1 【地理】(地)帶。2 區域,范圍,界。3 〈古、詩〉(腰)帶。4 圈,環帶。5 【數學】(球面)帶;...
  1. There are complicated geomorphology shapes and various types of land - use in jiuyuan, baotou, which lies in the urban and rural transition zone of borderline discipline of baotou city

    包頭市九原區地貌形態復雜,土地利用類型多樣,農林牧交錯特徵明顯,而且處于包頭市邊緣區城郊過度地帶。
  2. To do the investigating and studying work about the achievements of tackling key problem of the quondam exploration of front - zone of mountain, to analyze and study the applicability about the gathering technology used in the seismic exploration of the complicated construction belt of front - zone of mountainous ; 2. combining the quondam achievements, researching the design method of observation system objective of the complicated construction belt based on seismic - geology model, firstly, building the surface level and deep layer seismic - geology model of complicated construction belt and analyzing the forward model, secondly, designing the observation system aiming at the overthrust nappe structure in section and in area ; 3. aiming at the complicated earth ' s surface condition of front - zone of mountain, how to select the exciting method and the parameter, how to optimize the environment of exciting method and reception, how to pledge the normal combination of the datum of different exciting method ; 4

    根據山前帶的地震地質條件特點,本文主要研究了以下幾個方面的內容: 1 、對以往山前帶地震攻關成果開展調研工作,分析研究在山地山前復雜構造帶所採用的地震勘探採集技術的適用性; 2 、研究基於地震地質模型的復雜構造帶觀測系統目標設計方法:如何建立復雜構造帶的表層、深層地震地質模型,利用正演分析目標區的觀測系統;針對逆掩推覆體構造,如何分區分段有針對性設計觀測系統等; 3 、針對復雜地表條件的山地山前帶,如何選擇激發方式、參數,如何優選激發、接收環境,如何保證不同激發方式的資料能正常拼接; 4 、山前帶巨厚礫石區的表層結構調查技術及靜校正方法研究。
  3. Owing to complicated earth ' s surface condition such as the steep stratum outcropping of front - zone of mountain or the huge thick gravel stratum ' s overlay and earth ' s surface large undulation, complicated underground geology structure developed extremely such as thrust and overthrust nappe, and violent change of the lateral velocity, etc. in front - zone of mountain there are a series of problems such as serious secondary disturbance and low signal - to - noise ratio in seismic exploration gathering

    由於山前帶高陡巖層出露或巨厚礫石層的覆蓋、地表起伏大等復雜的地表條件、逆沖和逆掩推覆等復雜地下地質構造發育、速度橫向變化劇烈等原因,造成了山前帶地震勘探資料採集存在次生干擾嚴重和信噪比低等一系列問題。
  4. Past investigation found the rock in the right dam foundation composing of granite ( _ 4 ~ 3 _ 5 ~ 1 ) in dyas - trias, which has a very complicated mechanical environment. the complicated phenomenon is as follows : tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation

    前期的調查表明其右岸巖體力學環境復雜,表現為:構成右岸壩基(肩)巖體主體的二迭三迭紀花崗巖( _ 4 ~ 3 _ 5 ~ 1 )受構造變動、蝕變、風化卸荷等因素的影響形成了壩基軟弱巖帶和壩肩上部卸荷鬆弛巖體。
  5. The structure which is adopted according to the natural topography, such as shed - tunnel or half - tunnel, should be adopted to protect the natural environment and slope in the complicated zone adjacent to mountain

    在路線傍山布置地段,構造物應順應地形,提倡設置棚洞、半隧道,以達到保護邊坡和自然環境的目的。
  6. The collision between continental plates is a key to understanding the evolution of continental dynamics. perhaps the most spectacular large - scale result of plate tectonics is the broad complicated zone of intracontinental convergence between eurasia and peninsular india following their collision at about 45 ma

    大陸內部的陸-陸碰撞過程是大陸動力學的核心問題,青藏高原被視為印度板塊與歐亞板塊于新生代碰撞的結果,是典型的陸-陸碰撞帶。
  7. So it can better isoline draw process for analyzing mineralization result and groundwater hydrochemistry law of anion, cation distribution, it can also design and carry out superposing analysis function and use superposing method draw zone figure of hydrochemistry type. moreover, the system of secondary development has function that stores ultimate figure result into spatial database, it is not steady but flexible at any moment, it can so discretionarily superpose together with other figure layers that it forms synthesis figure set of multi - layer superposing and complicated content for the zone supplying accessorial support

    該系統在完成了基本數據管理、圖形顯示及查詢功能之外,還實現了等值線生成功能,大大簡化了過去為分析礦化度、陰、陽離子分佈等水化學規律而作的等值線繪制工作;該系統還設計實現了疊置分析功能,用於在等值線繪制功能的基礎上,通過疊置分析的方法繪制出水化學類型分區圖。
  8. Based on methods above, an applied program in visual basic is developed to interpret logging data and geosteering in drilling horizontal wells. the program guides to evaluate the oil field in a complicated geological situation and drill in horizontal well while it is applied to the work of interpretation and geosteering in the research zone

    在上述方法研究的基礎上,結合塔里木油田和莫北油田的實際情況,利用vb語言編制了一套隨鉆測井資料解釋和水平井鉆井地質導向的應用程序。將該程序應用於工區的隨鉆測井資料解釋和水平井鉆井的地質導向工作中,較好地指導了復雜地質條件下的油氣藏評價工作和水平井鉆井作業。
  9. In fact the development course of the town agglomeration is the course of industrialization promoting urbanization. the urbanization is a complicated course, and if china wants to realize the assignment of urbanization, the only promotion by the tertiary industry is inadequate, we still must quicken the development of industry, the population concentrating to the town, and industry to the zone are the trend of economic development, and the industry zone which must be characteristic, can be in the invincible position in the intense competition of market

    城鎮群的發展過程實際上是工業化推動城鎮化的過程,城鎮化過程是一個復雜的過程,中國人口眾多,要想實現城鎮化的任務,僅靠第三產業的推動是不夠的,還必須加快工業的發展,而人口向城鎮集中,工業向園區集中是經濟發展的趨勢,工業園區必須具有特色,才能在市場的激烈競爭中立於不敗之地。
  10. When the undercooling goes beyond the coupled zone, it is found that the ( pb ) dendrites in the acoustically levitated drops can also appear in the top of the drops and the gravitational macrosegregation is effectively suppressed, which may be caused by the ultrasound and complicated fluid flow inside the drops

    發現在小過冷范圍內,由於超聲波的攪拌作用層片共晶組織發生碎斷現象;在大過冷情況下,超聲波可以有效地抑制宏觀偏析的發生。
  11. Building external shading calculation method is put forward based energy consumption simulation results in the standards of hot summer and warm winter zone ( jgj75 - 2003 ) and design standard for energy efficiency of public buildings ( gb 50189 - 2005 ), but it aims at simple fixed external shading and misfits complicated shading devices, so the validity and rationality of regulation don ’ t gain validation

    盡管《夏熱冬暖地區居住建築節能設計標準》 ( jgj75 - 2003 )和《公共建築節能設計標準》 ( gb50189 - 2005 )提出了建築外遮陽系數的計算方法,但只是根據建築能耗模擬軟體的模擬結果得出的,且只能針對簡單的固定外遮陽,不適合復雜的建築遮陽形式,因此規定的有效性和合理性並沒有得到驗證。
  12. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜構造帶野外施工方法,最終達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。
  13. ( 7 ) as for the tunnel which is located at a karst zone with a complicated water environment, considering the safety of the tunnel structure and the result of test and calculation, the design of tunnels should be carried out with external water load

    ( 7 )計算和試驗均表明,對於水環境條件復雜的巖溶富水區隧道,為了結構的安全起見,宜接考慮外水荷載的荷載組合原則來設計。
  14. The flow field of fadw is very complicated, especially in the free vortex jet zone. so the method is according to the ideal flow, including the design of the asymmetric supersonic laval nozzle and the diffuser

    所以,本文所建立的fadw的基本設計方法是理想狀態下的設計方法,其中主要包括非對稱超音速噴管的設計和氣動窗口擴壓器的設計方法。
分享友人