comprehensive river basin planning 中文意思是什麼

comprehensive river basin planning 解釋
綜合流域規劃
  • comprehensive : adj. 1. 廣泛的,全面的,完整的,包含多的,綜合的。2. 有理解力的,悟性好的。adv. -ly ,-ness n.
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • basin : n 1 臉盆;水盆。2 滿盆,(一)盆。3 盆地,流域。4 水坑,地塘;(港灣)深度;內灣,小灣;【造船】...
  • planning : n. 計劃,規劃。 an overall planning 全面規劃。
  1. Recently, these problems are again concerned because of the planning of the weihe river basin comprehensive regulation and the catastrophe caused by the small flood on the weihe river in 2003

    2003年渭河的小水大災以及近期渭河流域綜合治理規劃的制定,又一次使潼關高程問題成為各方研究的熱點。
  2. Planning of comprehensive water pollution control project in tiaodeng river basin in chongqing

    重慶市跳磴河流域水污染綜合治理工程規劃
  3. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域水電開發有限公司結合流域水電開發實際,通過建立流域水雨情監測網,開展群庫水、電、網多環節的大系統綜合調度研究,流域梯級電站控制模式研究、流域供電范圍及開發時序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子電站梯級調度實踐,在流域梯級電站統一調度研究方面已取得了初步的成果。
  4. Article 22 in a water - eroded region, by taking a small river basin comprising the natural ravines and flanking hill slopes as a unit, a comprehensive system for the prevention and control of soil erosion shall be set up on the basis of overall planning and comprehensive rehabilitation

    第二十二條在水力侵蝕地區,應當以天然溝壑及其兩側山坡地形成的小流域為單元,實行全面規劃,綜合治理,建立水土流失綜合防治體系。
  5. This paper expounds, the necessity and urgency of formulating the flood control planning of the yangtze river basin after the 1998 flood and expounds that the newly formulated flood control planning of the yangtze river basin is the succession and development of 《 the brief report of the yangtze river comprehensive utilization planning 》, and also analyzes the new achievements of the newly formulated flood control planning of the yangtze river basin in respects of planning thought, determination of flood control district division and flood control standard, and planning of various structural and non - structural flood control measures, etc

    闡述了1998年大水后編制長江流域防洪規劃的必要性和緊迫性;新編長江流域防洪規劃是對《長江流域綜合利用規劃簡要報告》中長江流域防洪規劃的繼承和發展,從規劃思路、防洪區的劃分和防洪標準的確定、各類防洪工程措施和防洪非工程措施規劃等方面,解析了新編長江流域防洪規劃的新成果。
  6. The mission of the susquehanna river basin commission ( srbc ), which is defined in the compact, is to enhance public welfare through comprehensive planning, water supply allocation, and management of the water resources of the susquehanna river basin

    描述:美國斯威士忌哈河域委員會的任務是保護該河的水資源,能夠給公眾提供安全,干凈的水。
  7. Finally, by using of the mathematical model, it is calculated and predicted the effect of the different tongguan riverbed elevations as well as the different conditions of incoming water and sediment on the variance of the flood elevation and the tend of aggradation and degradation of the lower weihe river bed. it is answered quantitively the lessening extent of sediment silt and the decreasing extent of the flood elevation of the lower weihe river after 14 years on two different incoming water and sediment conditions with three different tongguan elevations, respectively 328m, 327m and 326m. these results supply important references to the planning of flood control and comprehensive regulations of the weihe river basin

    最後用驗證后的數學模型對不同水沙系列、不同潼關高程( 328m 、 327m 、 326m )下渭河下游的沖淤趨勢和洪水位的變化進行了預測計算,從定量上回答了潼關高程從328m降至327m (相當于潼關高程降1m )和潼關高程從328m降至326m (相當于潼關高程降2m )時,渭河下游14年之後各河段的減淤程度以及不同流量級洪水位的降低幅度,這些成果對于渭河下游防洪治理規劃的制定具有重要的參考價值。
分享友人