concrete pier 中文意思是什麼

concrete pier 解釋
混凝土墩
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  1. The stress status of concrete at face of sluice pier in the case of cold wave, pipe cooling and cast - in - place partial sluice pier and so on

    研究了寒潮、水管冷卻、整澆部分墻體等情況下閘墩表面混凝土應力分佈狀況。
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  3. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  4. Demolition of reinforced concrete railway pier by static - demolition agent blasting

    鋼筋混凝土橋墩的破碎劑脹裂拆除
  5. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的墩柱、蓋梁、預制箱梁和橋面板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  6. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、施工分佈活載、混凝土強度、風載和施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋施工期可靠度的影響。
  7. Solid concrete pier

    實體混凝土碼頭
  8. In this paper, the pier - wall models respectively built with steel - fiber concrete and ordinary concrete were tested for revealing their early bebaviors of thermal strain and thermal stress caused by adiabatic heating

    為此進行了鋼纖維混凝土和普通混凝土2個墩墻結構的模型試驗,比較了二者的溫度及溫度變形的特性。
  9. Techique of pumping concrete used in high pier construction

    鋼管樁和貝雷片支架在現澆箱梁施工中的應用
  10. The bridge is of 685. 711m overall length and of 625m mian bridge. the main pier of the bridge is reinforced concrete sinking well structure

    斜拉橋位於吉林市區第二松花江上,全橋總長685 . 711m ,其中主橋625m ,該橋由中鐵三局六處施工。
  11. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  12. Study on temperature self - restrained stress and parameters of the concrete pier column strengthened by cfrp

    加固混凝土墩柱溫度自應力及參數研究
  13. This paper aims at bridge with high pier and long span adopting single or double featheredge piers, the stability of bridge in the whole construction process is analyzed combined with research conclusion of bridge stability and concrete creep and shrinkage, bridge construction period is divided according to actual construction - process and concrete creep and shrinkage regularity and structure is analyzed as plane truss at each time increment

    本文針對常用單、雙薄壁墩的高墩大跨徑橋梁,結合國內外對橋梁結構穩定與混凝土徐變收縮的研究成果,對節段法施工的橋梁進行穩定性全過程分析方法研究。根據實際施工過程及混凝土徐變收縮規律對施工全過程劃分時段,對每個具體計算時刻採用平面桿系結構進行計算分析,不同計算時刻具有不同的結構體系。
  14. Systemic analyses of the practical engineering have been done. the engineering measures including post - pouring belt, part pier pouring with lock floor at one time and pipe cooling is been thoroughly studied. by applying these measures, the stresses in the concrete change

    針對實際工程混凝土施工需要,著重研究了后澆帶、部分墩墻和底板同時澆築和布置冷卻水管三種工程措施所帶來的混凝土應力的變化情況。
  15. Through check and inspection to the large pipe piles of zhejiang beilun power plant ' s pier, a lot of cracks were found in portrait and circle on the surface of prestressed concrete pipe piles which affect security and durability of the concrete structures directly

    摘要通過對北侖電廠碼頭大管樁的詳細調查與檢測,發現混凝土大管樁多處存在縱向裂縫和周向裂縫,直接影響碼頭混凝土結構的安全性、耐久性。
  16. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
  17. In this paper, the best reinforcement scheme, which was found by nerve network and genetic algorithm from serval reinforcement schemes, was applied to strengthen a prestressed concrete continuous rigid fame bridge with many quanlity faults, such as excess fall deflection of the main span deck > serious web slop crack existing between main pier abutment and one fourth span, and very poor mud jacking quanlity in the prestressing tendon tubs

    本文針對某預應力混凝土連續剛構橋所存在的實際問題:如主橋橋面下撓度過大;主墩和四分之一跨徑處均存在較嚴重的腹板斜裂縫;預應力管道壓漿質量較差等。提出了幾種加固方案,並用神經網路和遺傳演算法進一步優化出了較佳的加固方案,進行了加固前後效果對比分析。
  18. With reference to the cracks occurring in the reinforced concrete pier shafts of a railway bridge during construction, the causes leading to the cracks and propagation process of the cracks are analyzed by means of theoretic calculation and finite element simulation

    結合某鐵路橋施工期間鋼筋混凝土墩身開裂現象,通過理論與有限元模擬相結合的方法,對裂縫的出現原因及發展過程進行了分析。
  19. Blasting dismantlement technology for reinforced concrete bridge pier

    橋梁鋼筋混凝土墩柱爆破拆除技術
  20. Bridge with high pier and long span uses high - strength materials and thin - wall structure and often adopts segmental construction method, the effect of concrete elastic modulus and creep and shrinkage are significant, so aging stability analysis research has important significance

    又由於此類橋梁大都採用節段施工方法,施工周期短,混凝土的彈性模量變化、徐變收縮等時效因素的影響顯著,開展大跨徑混凝土橋梁施工全過程穩定性研究具有重要意義。
分享友人