concrete wall 中文意思是什麼

concrete wall 解釋
混凝土工事
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. Precast autoclaved aerated concrete wall roof panels

    預制蒸壓加氣混凝土墻板和屋面板
  2. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形墻體模板設計、方案選擇及施工工藝等技術難題,筆者結合青島市藝術中心工程藝術表演劇場三維空間雙曲線清水砼墻施工,在傳統的單曲線可調式大模板的基礎上進行了創新,很好的解決了雙曲線模板施工的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。
  3. The temperature rise at the center of a massive concrete wall is calculated by using the adiabatic rise of temperature and heat conduction equations of concrete based on the equivalent time, and considering effects of temperature on the hydration heat reaction ratio and creep characteristics of early - age concrete

    摘要基於等效時間的混凝土絕熱溫升、熱傳導方程,考慮溫度對早期混凝土水化熱化學反應速率和徐變特性的影響,計算了大體積混凝土墻中心的溫升。
  4. Design and construction of space hyperbola rinse concrete wall

    空間雙曲線清水混凝土墻模板設計與施工
  5. Technical specification for dwelling houses with epsc form latticed concrete wall

    水泥聚苯模殼格構式混凝土墻體住宅技術規程
  6. The temperature cracks are calculated by use of a crack band model, and the stress and cracking of the concrete wall are computed by using the half - analytical iteration method

    採用裂縫帶模型計算溫度裂縫,用半解析迭代法進行了混凝土墻的溫度應力和開裂計算。
  7. The thesis begins with computational analysis to the aerated concrete wall thermal performance. the aerated concrete is proved to have good performance in heat - insulate and heat - conserve as single wall. the index of dew - condensing is within allowing range, thermal performance totally can meet energy - conserving standard requirement in hot summer and cold winter zone

    本文首先對加氣混凝土墻體熱工性能進行計算分析,論證其作為單一墻體,夏季隔熱、冬季保溫性能都很優良,墻體結露指標也在允許范圍之內,熱工性能完全可滿足夏熱冬冷地區節能標準要求。
  8. Controlled demolition blasting technology for thin reinforced concrete wall of a flood discharging tunnel

    泄洪洞鋼筋砼高薄邊墻切割拆除控制爆破技術
  9. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板施工、鋼筋施工、混凝土澆築等幾個方面介紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體清水混凝土墻施工技術。
  10. Cutting the concrete wall

    橫切剪力墻
  11. Discussion on the construction technique of the concrete wall against seepage in the reservoir project reinforced

    除險加固水庫中砼防滲墻的施工
  12. Abstract : the construction process and construction scheme and quality of impermeable concrete wall of jiepai pivotal engineering is briefly introduced. the specific steps are put forward for the construction questions

    文摘:簡要介紹了界牌樞紐砼防滲墻施工工藝、方案和質量情況,並針對工程施工中遇到的問題,提出了具體措施
  13. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  16. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  17. Analysis and prevention of the air inflation concrete wall crack crevice

    加氣混凝土墻體裂縫分析與防治
  18. An outside keeping temperature system on the outside concrete wall made on - site of high - rise housing

    高層住宅現澆混凝土外墻外保溫體系
  19. In general, the aerated concrete wall is a kind of energy - conserving wall that can be used in hot summer and cold winter zone. as a practical technology of energy - conserving wall, it deserves to popularize for its superior thermal performance

    總體而言,加氣混凝土是一種可用於夏熱冬冷地區,保溫隔熱性能優越的節能墻體材料,作為一項實用節能墻體技術,應予大力推廣使用。
  20. Impermeable wall interdicts or weakens waterpower contact of seepage intercomplementarity between groundwater inside dike and river outside dike. especially, mass continuous concrete wall may have made effect on groundwater power field, chemistry field and water resource

    同時由於防滲墻阻斷或減弱了堤內地下水與堤外江水滲流互補的水力聯系,特別是建設大規模連續防滲墻可能對地下水動力場、水化學場以及地下水資源等產生影響。
分享友人