connecting stage 中文意思是什麼

connecting stage 解釋
接續極
  • connecting : adj. 連接著的;起連接作用的。
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  1. The two decades of development will serve as an inevitable connecting link for attainting the third - step strategic objectives for our modernization drive as well as a key stage for improving the socialist market economy and opening wider to the outside world

    這是實現現代化建設第三步戰略目標必經的承上啟下的發展階段,也是完善社會主義市場經濟體制和擴大對外開放的關鍵階段。
  2. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  3. Projectors for film and television studios, stage and photographic use ; connecting elements and transition pieces

    電影和電視演播室.舞臺和攝影用聚光燈.連接元件和轉
  4. Spotlights for film and television studios, stage and photographic use ; special networks of lines and special connecting elements

    電影電視演播室舞臺和攝影用聚光燈.專用線路網和
  5. Thermal stress control system actually gather the real - time data of unit sets , compute temperature fields , stress fields and maximum dangerous stress by the math modal , decide target and speedup rotation in every stage of startup process , and justify automatically to realize auto control a serial of processes of turbine , such as speedup , warm - up , connecting net , load changing , stop and unsteady condition etc , and improve automatic level of the unit sets. turbine auto startup ( tas ) system can automatically evaluate steam turbine ' s startup and load changing process according to thermal stress of

    熱應力控制系統實際是對機組運行參數進行實時採集與監控,通過數學模型實時地計算高、中壓缸轉子的溫度場、應力場分佈,以及最危險熱應力,以確定啟動過程各階段的目標轉數及升速率,並進行自動調整,實現機組沖轉、升速、暖機、並網、升負荷、停機以及異常工況下的自動控制,大大提高了機組的自動化水平。
  6. The industrialization of agricultural managing is a great breakthrough with overall importance and strategic meaning since the rural reform, proved the new management style that can be in conformity with agricultural industrial structure adjustment of the present stage and operation mechanism by practice, it has 5 basic key elements, among them leading enterprises are the core of industrialization management, it is determining the level, level of industrialization, so should take the measure of promoting leadings enterprise of our province to develop : market - oriented, bold in blaring new trails ; improve product quality and scientific and technological content ; set up steady interests connecting mechanism ; carry on resources and is combined and expand the scope of the enterprise ; improve enterprise ' s managerial skill

    摘要農業產業化經營是農村改革以來的一個帶有全局性和戰略意義的重大突破,是被實踐證明能夠與現階段農業產業結構調整相適應的新的經營方式和運作機制,它有5個基本要素,其中龍頭企業則是產業化經營的核心,它決定著產業化的層次、水平,因此應採取促進陜西省龍頭企業發展壯大的措施:面向市場,大膽創新;提高產品質量和科技含量;建立穩定的利益連接機制;進行資源整合和擴大企業規模;提高企業經營管理水平。
  7. Road vehicles ; two - stage fuel filters for compression - ignition engines ; mounting and connecting dimensions ; identical with iso 7576 : 1990

    道路車輛.壓燃式發動機的兩級油濾.安裝和連接尺寸
  8. In the light of the cross - boundary traffic forecasts and the forecast peak hour traffic volumes on the connecting roads within hong kong, the stage 1 study concluded that the swc could provide sufficient capacity to cope with the cross - boundary traffic demand up to the year 2016 as well as for the low and medium demand projections in 2020

    根據跨界交通量預測,以及跨界通道在香港的連接路于繁忙時間的交通量預測,第一階段研究總結深港西部通道可提供足夠的容車量,以應付2016年前的跨界交通需求,以及2020年的低至中水平交通需求估計。
  9. According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in zhanjiang city, this paper makes the experimental analysis on it and advances some corresponding measures

    根據湛江海灣大橋連接線一期工程某些填方路段出現龜裂的情況,進行了試驗分析並提出了相應措施。
  10. Connecting the two courses set up in our school to the practice of building research study special topic internet, the thesis also designs carefully the teaching methods required by all kinds of task in " it guiding program for middle and primary school ( trying out copy ) " during the course of research study. the thesis at last sums up the basic applying it methods at research study preparing stage, choosing subject stage, implementing stage and evaluating stage, which form into it and research study integration teaching pattern

    結合我校開設這兩門課程和建設研究性學習專題網站的實踐,詳細設計了在研究性學習過程中完成《中小學信息技術課程指導綱要(試行) 》所要求的各模塊內容的教學方案,歸納總結了在研究性學習的準備階段、選題階段、實施階段和評價階段應用信息技術的基本方法,形成了信息技術和研究性學習整合的教學模式。
分享友人