construction completion 中文意思是什麼

construction completion 解釋
施工結束
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • completion : n. 1. 成就,完成,實現;【數學】求全法。2. 期滿;畢業。
  1. These resources were overstrained in the completion of the grand canal , and in the undertaking of other construction projects, including the reconstruction of the great wall

    人民不堪重負,在開鑿大運河、重建長城、修築其他的許多建築等工程中耗盡了體力。
  2. Work on the primary road link to ma on shan town centre is scheduled for completion in 2002. five public housing estateshome ownership scheme projects are under construction

    馬鞍山市中心主要連接路工程定於二零零二年完成。五個公共屋?居屋屋苑的工程項目正在施工。
  3. In addition, the expressway evaluation models are introduced in this paper. because the construction of thruways is expensive, and, especially after their completion, they affect not only the technological capability of current road nets but also the environment and society

    因為高速公路的建設耗資巨大,尤其是建成后,不僅會影響當前路網的技術性能,而且勢必會造成環境和社會方面的影響,因此,必須進行經濟、技術、環境及社會等各方面的評價。
  4. The reason for badly load - repaid ability includes illogical traffic design, less government investment, unapt classificatory proportion of toll road, high charging cost, vehicle diffluence because of the completion of highway construction, etc. part iv research on how to improve debt solvency

    論述了規劃設計不合理,政府投入不足,收費還貸公路結構不合理、二級收費公路比重過大,收費成本過高,高速公路車輛分流等原因導致收費還貸公路償債能力低下。第四部分,提高償債能力的對策研究。
  5. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與管徑的調配設計,增大環狀粒料層和止水粘土層的厚度;濾水管外包尼龍紗網;粒料與止水粘土接觸界面上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投粘土球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地區人飲水井施工提供技術示範作用。
  6. Ma wan fire station and tseung kwan o area 87 fire station and ambulance depot were under construction and scheduled for completion between 2001 and 2002

    馬灣消防局和將軍澳87區消防局暨救護站正在興建,預計於二零零一至零二年間落成。
  7. Construction of an additional four southbound private car kiosks is targeted for completion by june 2005

    另有四個南行私家車檢查亭亦可望於二零零五年六月落成。
  8. Construction of an additional four southbound private car kiosks is targeted for completion by june 2005. establishment of tactical squad

    另有四個南行私家車檢查亭亦可望於二零零五年六月落成。
  9. During the year, the ma wan fire station and the tai chik sha fire station cum ambulance depot were commissioned. lau fau shan fire station cum ambulance depot, sha tau kok fire station with ambulance facilities and braemar hill fire station cum ambulance depot were under construction and scheduled for completion between 2003 and 2004

    年內,馬灣消防局和大赤沙消防局暨救護站正式?用。流浮山消防局暨救護站、沙頭角消防局(附設救護車設備)和寶馬山消防局暨救護站正在興建中,將於二零零三、零四年間落成。
  10. The construction unit shall submit to the competent department of city planning administration documents related to the completion of a development project within a planned urban area within six months of the checking and acceptance of the project

    城市規劃區內的建設工程,建設單位應當在竣工驗收后六個月內向城市規劃行政主管部門報送有關竣工資料。
  11. Construction completion date civil works

    工程完成日期土木工程
  12. General rules for the test methods of electric railcar on completion of construction

    電動有軌車組裝后試驗方法的通用規則
  13. The ( name of employer ) now invites sealed bids from pre - qualified eligible bidders from member countries of adb for furnishing the necessary labor, materials, equipment and services for the construction and completion of the works

    業主名稱)現從adb成員國中邀請有預選資格的合格投標者進行密封投標,為實施及完成工程提供所需要的勞務、材料、設備及服務。
  14. The outcomes show that the sequence of soil erosion of types of land use in different regions is different and the sequence of soil erosion of types of land use in different periods of the same regions is uncertainty ; the occurred rate of soil erosion of new wasteland is higher than that of idle wasteland for years ; the occurred rate of soil erosion of grassland is higher ; the occurred rate of soil erosion of non - irrigated farmland is high and the soil erosion intensity of land used for construction is great during construction and becomes smaller after completion

    結果表明:不同區域土地利用類型的土壤侵蝕序列各不相同,而同一區域不同時期土地利用類型的土壤侵蝕序列不確定;新出現的難利用地比長期閑置的難利用地土壤侵蝕發生率高;草地土壤侵蝕發生率偏高;耕地中旱地的土壤侵蝕發生率高;建設用地建設時土壤侵蝕強度大,而建成後土壤侵蝕強度小。
  15. On completion of building works, the t2 competent person as recognised by the buildings department, and the registered structural engineerregistered professional engineer employed by the applicant shall jointly certify and submit to the district lands officer a construction completion report

    建築工程完成後,申請人所聘用符合屋宇署認可的t2合資格人士,及注冊結構工程師注冊專業工程師須向地政專員提交一份聯合簽署的興建完成報告。
  16. Optimum level of construction completion on global optimization is not only the evaluating indicator but the critical factor in construction control

    經過全局優化的最優施工完成度不單是一個評價指標,而且是施工控制中的關鍵因素;採用全局優化思想對施工過程中的立模標高進行控制。
  17. Furthermore, in control part, it owns analysis functions of design ( construction ) completion reasonable states and design ( construction ) segmental reasonable states, elevation of form erection or installation, simulation analysis, foresight of alarm and generalized optimization, among which, design of foresight of alarm will break through the difficulty of non - synchronism of

    在控制模塊中,具有設計(施工)結構合理狀態、設計(施工)節段合理狀態、立模(或安裝)標高、模擬分析、預警及廣義優化等多種功能模塊。尤其對預警設計,率先解決了強度和穩定性不同步的問題,確保施工過程的強度、穩定性安全。
  18. The control of the engineering costs in college capital construction projects depends largely on the control and supervision of such factors as decision - making, bidding at design stage, supervising at construction stage and settlement after the construction completion

    摘要高校基建工程式控制製造價,要做好決策、設計階段工程招投標、施工過程管理、工程竣工結算等幾個重要環節的控制和管理。
  19. Construction completion date

    工程竣工日期:
  20. When the district lands officer has received the construction completion report, and is satisfied that all other obligations imposed under the leaselicence conditions have been complied with, he will issue a certificate of compliance

    地政專員在收到興建完成報告,並信納申請人已完全履行土地契約建屋牌照規定的所有其他責任后,便會簽發完工證。
分享友人