  1. In this paper, monte carlo ( mc ) method is used in the research of distributing of construction duration and computation of time parameter of pert network. according to probability viewpoint, critical line and key degree of activity in the network are also defined. aiming at the limitation of application of the mc in large scale the network, the simplified computational method for the network is presented with quantum probability theory and composite method of path in network

    本文用mc ( montecarlo )方法研究了施工工期的分佈規律和pert ( programevaluationandreviewtechnique )網路的時間參數的計算;用概率論的觀點定義了pert網路主導線路和關鍵度;針對大型施工進度網路mc方法應用的局限性,採用線路合成方法,引進當量概率概念,提出了pert網路的簡化計算方法;根據工程搭接施工網路的特點,將其轉化為廣義pert網路,探討了其施工進度風險的計算。
  2. The generation is coinciding with the probability distribution for the same work procedure. for one turn of simulation, the rigid network plan algorithm is used. after enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path and time parameters can be found in the pnp

    本文首先論述了網路計劃發展的幾個方面,然後引入概率理論與統計知識,建立起一個概率型網路計劃模型,在此基礎上闡述了工序工期與網路總工期的概率分佈的判定與擬合方法,通過中心極限定理同時輔助於計算機數值模擬法,對網路計劃做出了一些統計分析,同時提出了概率型網路的關鍵路線的確定方法。
  3. Abstract : during treatment of a delayed schedule , specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks ; because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actral schedule , therefore , the claim for extension of time can not be calculated only by the network , but the actual period where the cause of a delaed schedule is set should be considered , and should be calculated on the basis of the actual schedule which is approved by the supervising engineer

    文摘:在工期延誤處理時,工期索賠計算應特別注意:由於網路的關鍵線路可能發生變化,且實際進度計劃要考慮時差的合理利用,因此工期索賠不能僅按網路圖計算,而要考慮工期延誤原因的實際發生時間,按經監理工程師批準的實際進度計劃計算。
  4. Cpn critical path network

    關鍵路徑網路圖