cubic meter 中文意思是什麼

cubic meter 解釋
可實現在線立方米
  • cubic : adj. 1. 立方體[形]的,正六面體的。2. 【數學】三次的,立方的。n. 【數學】三次曲線;三次方程式;三次多項式;三次函數。
  • meter : n. 1. 測量儀表,計量器;計,表。2. 計量人;計量官。vt. 用表計算[測量、記錄]。n. 〈美國〉= metre.
  1. 14 must prepare at least 200 cubic meter ' s slurry before spud

    開鉆前應配好至少200方高粘度稠泥漿。
  2. Estimates suggest that for every cubic meter of vent discharge, 350 milligrams of particulate organic material would be advected into the vent area

    每一立方米的噴口流量中估計會有350毫克的顆粒有機物被沖到噴口區域。
  3. Numerically, newton was saying that the mass of each cubic meter of earth was about 5, 000 or 6, 000kg.

    從數值上說,牛頓所說的是地球每立方米的質量是5,000或6,000公斤。
  4. The cube in the tubular cup occupies one cubic meter

    筒狀杯中的立方體佔有一個立方米的體積
  5. Heat accumulating floor with hae of porous material 15 cubic meter, inside the floor there are perforated pipes of 35 sm in diameter to supply hot air from hss and pss. - the heating amount - 66228 kwh h for 6500 degree - days of heating period

    溫室地板鋪15平方米的蓄熱地板,地板使用多孔蓄熱材料,地板內還布有多孔管道,綜合太陽能系統和被動太陽能系統加熱后的空氣就從這些管道流到地板。
  6. The water price within 3 years since beginning of operation will be charged with preferential reduction of 0. 1yuan cubic meter to newly set up private enterprises and enterprises with foreign investment in the range of water supply network of maoming city ; for construction use of water, preferential reduction of 0. 2 yuan cubic meter is applied to the charge

    2 、凡在茂名市區供水網路范圍內新辦私營企業和外商投資企業,生產用水價格從企業投產之日起3年內按到位水價每立方米優惠0 . 1元;建築用水按到位水價每立方米優惠0
  7. The trends of plastic shrinkage cracking in concretes made with the same water or cement paste content per cubic meter are similar with the above case, but the critical w / c ratio is about 0. 45 - 0. 4 and 0. 4, respectively

    2 )在一定砂率范圍內,較低和較高砂率對應的混凝土拌合物不易開裂,而中間某一臨界砂率對應的混凝土拌合物開裂較大,這一臨界砂率變化范圍為36 - 43 % 。
  8. Through the utilisation of this energy, which is left unused by nature, an energy source is tapped, with whose help a part of our energy requirements can be covered, which would otherwise have to be covered by fossil fuels. the excellent properties of the hydro - dynamic screw are its minimal disturbance to the environment, the environ - mental friendliness and long service life. a capacity of 0. 1 to 5. 5 cubic meter per second and a head up to 10 m, enables it to utilise hydrodynamic powers which are ruled out for turbines for reasons of cost

    水力螺旋發電機同傳統的水輪機和渦輪機相比具有優越性,其對環境的影響很低,環境友好且使用壽命長,而且高達5 . 5立方米秒的水體輸送容量和高達10米的水頭使其可以充分的利用水能,只要有1千瓦的能量也可以利用,運行效率遠高於渦輪機,且投資和運行成本低於渦輪機。
  9. The first phase has a 520 million yuan rmb total investment and includes two 8 - ton berths, a public dock with a capacity of transporting 15. 6 million tons of petrochemical products annually, and a 440, 000 cubic meter fuel and oil storage facility

    項目一期工程投資總額為5 . 2億元人民幣,包括兩個8萬噸級泊位、年中轉能力1560萬噸石化產品的公用碼頭和44萬立方米的燃料油、成品油倉儲庫區及配套工程。
  10. Reform the process of water production, optimize the process and facilities of water production. improve the latent treatment ability. adopt advanced process of water supply in order to lower the treatment cost per water quantity of cubic meter

    在設計新的制水廠時,積極採用先進的制水工藝,在保證水質、水量、水壓的同時,減少單位供水量的處理費用等等。
  11. In the paper the effects of the made parameters, the main materials and environmental conditions on plastic shrinkage cracking were investigated. it can be concluded as following : 1 ) there was a critical w / c ratio of maximum plastic shrinkage cracking between lower and higher w / c ratio of concrete mixtures made with the same cement content per cubic meter, concretes with lower or higher w / c ratio being less prone to plastic shrinkage cracking and the w / c critical ratio critical of maximum plastic shrinkage cracking being about 0. 5

    本文研究了配製參數、主要原材料以及環境條件對新拌混凝土塑性收縮裂縫的影響,結果表明: 1 )單方混凝土水泥用量一定時,較低水灰比和較高水灰比對應的混凝土拌合物不易開裂,而中間某一臨界水灰比對應的混凝土拌合物開裂較嚴重,這一臨界水灰比為0 . 5 ;單方混凝土水用量或水泥漿量一定時,混凝土拌合物的塑性開裂趨勢與上述情況相似,但臨界水灰比分別為0 . 45 - 0 . 4和0 . 4 。
  12. Thirdly, it discussed the application of the marginal opportunity cost ( moc ) pricing model on water pricing, and then evaluated the feasibility of the model, taking the water pricing of qingzhen city as the example and the result indicated that the water price is 2. 389, 2. 218, 2. 072, 2. 024, 1. 987yuan per cubic meter at the discount rate of 3 %, 5 %, 8 %, 10 %, 15 % respectively

    然後,在古典資源價格理論與現代西方經濟學資源價格理論的比較研究基礎上,運用moc模型對水資源價格進行了研究。在moc模型中,分析了水價的各個組成部分及其計算方法,最後以清鎮市為例,運用moc模型對清鎮市水資源價格進行計算和分析。
  13. Their standard model treats the universe as though its density did not vary from place to place but had a uniform, average value of one atom per cubic meter

    標準模型將宇宙視為一個均勻結構,密度不會隨著空間位置而變化,每立方公尺平均有一個原子。
  14. " what we ' re doing is weighing the water in one cubic meter theoretically pulled from a cloud and then multiplying by the number of meters in a whole hurricane, " she explains

    「我們正在做的是從理論上測量一立方米的雲所含的水的重量,然後再乘以整個颶風的體積。 」她解釋說。
  15. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑坡體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。
  16. This thesis, according to limestone environmental characteristic and characteristic of construction of highway of mountain area of limestone, sets out in excavating from the road bed of the angle of environmental protection, according to trying not to excavate, how to reduce to excavate, how to reduce and excavate the impact on surrounding environment of the course, how to go on the expressway view and ecological environment and how to carry on environmental quality resume, we employ theories such as engineering of traffic, rock soil engineering, traffic psychology, traffic aesthetics, operations research, etc. we have excavated environmental protection theory and method and carried on research to the mountain area expressway road bed of limestone systematically, propose the road bed to excavate and optimize, slope protect, discard cubic meter of earth and stone deal with, natural river system recuperate recovery, view environmental recovery, environmental quality resume theory system of appraising etc.

    本論文依據石灰巖山區環境特徵和石灰巖山區高速公路建設特徵,從路基開挖中環境保護角度出發,按照盡量不開挖、如何減少開挖、如何減少開挖過程對周圍環境的影響以及如何對高速公路景觀和生態環境進行恢復、如何對建設項目進行環境質量評價等思路,應用交通工程學、巖土工程學、交通心理學、交通美學、運籌學等理論與方法,系統地對石灰巖山區高速公路路基開挖環境保護理論與方法進行了研究,構建了包括路基開挖優化、邊坡防護、土石方處理、自然水系調治恢復、景觀環境恢復、環境質量評價等理論或方法的石灰巖山區高速公路環境保護理論框架,為促進石灰巖山區高速公路的可持續發展提供了基本思路。
  17. With mutual understanding, the hong kong government and the guangdong governments signed an agreement on 22 april 1964 which stated that from march 1965 onwards mainland each year agreed to sell to hong kong not less than 15 billion gallons of fresh water ( 68, 200, 000 cubic meters ). the maximum amount of water supply each day could reach as high as 62, 000, 000 gallons. the price per cubic meter was set at 10 cents renminbi ( bmb )

    1964年4月22日雙方正式簽訂協議,同意自1965年3月起,廣東省每年向港方出售不少於150億加侖( 6 , 820萬立方米)食水,每天最高供水量可提高至6 , 200萬加侖,售價為每立方米人民幣1角,即1
  18. There are rich fresh water resources in dinghu, the waterworks with a daily water supply of 50000 tons, the jiukenghe reservoir with a water storage of 49600000 cubic meter, and the never ending xijiang river provide richwater resources to the district

    鼎湖區擁有豐富的淡水資源,有日供水量5萬噸的自來水廠,還有儲水量達4960萬立方米的中型九坑河水庫及源源不斷的西江水域,為我區提供充足的水源供應。
  19. No harmful nitrides have been detected in the air, whose dust content stays below 0. 4 mg per cubic meter

    大氣中的總含塵量在每立方米0 ? 4毫克以下。
  20. Zhuhai water supply company has supplied 170, 000 cubic - meter water to macao every day since it was established 20 years ago

    珠海對澳門供水公司獲國家質量和環境管理體系認證,頒證儀式19日上午在珠海賓館行。
分享友人