culvert 中文意思是什麼

culvert 解釋
n. 名詞 暗渠,陰溝;【電學】電纜管道;涵洞。

  1. They ran for the culvert and ducked in.

    他們跑到涵洞跟前,鉆了過去。
  2. After days of hard work, the culvert was at last completed.

    經過幾天的苦戰,總算把涵洞修好了。
  3. Fundamental code for design on railway bridge and culvert

    鐵路橋涵設計基本規范
  4. Construction of box culvert no. 1 extension in progress

    箱形排水渠的伸延工程
  5. Developmeant on cad system for railway culvert

    電力數據備份系統的建設與研究
  6. Supervision and maintainance of the highway bridge and culvert

    談公路工程橋涵管理與養護
  7. Based on the observed runoff data, more accurate designed flow to a culvert or a small bridge may be obtained by curve fitting on frequency curve of pearson type iii distribution

    精度較高的橋涵水文設計是基於所在地實測的徑流資料,採用頻率曲線的適線法獲得。
  8. Frost heaving analysis of corrugated pipe culvert without foundation in permafrost region

    多年凍土地區無基波紋管涵洞凍脹分析
  9. What are the requirements to retain, modify or reprovision the existing twin cell box culvert to suit development

    在保留、修改或重置現有的雙管箱型暗渠以配合發展計劃方面,有甚麼規定?
  10. Standard practice for least cost life cycle analysis of concrete culvert, storm sewer, and sanitary sewer systems

    混凝土涵洞,雨水溝,排污溝系統的最低成本
  11. Standard specification for steel sheet, zinc and aramid fiber composite coated for corrugated steel sewer, culvert, and underdrain pipe

    波紋鋼制下水溝暗渠和雨水管用鋅和芳族聚酰胺纖維復合塗覆鋼板的標準規范
  12. Code for design on subsoil and foundation of railway bridge and culvert

    鐵路橋涵地基和基礎設計規范
  13. Anteklise filling plans for bridge and culvert structures in expressway

    高速公路橋涵構造物的臺背填築方案
  14. Standard for constructional quality acceptance of railway bridge and culvert engineering

    鐵路橋涵工程施工質量驗收標準
  15. Code for design on concrete and block masonry structure of railway bridge and culvert

    鐵路橋涵混凝土和砌體結構設計規范
  16. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  17. The phenomenon of crack that appears in the hydraulic culvert and sluice is explained separately. the rule is concluded. the mechanism that forms the crack is studied

    對水工涵閘工程墩墻和底板混凝土的裂縫現象分別進行了闡述,總結其規律,分析其成因,並研究其開裂機理,為採取相應的工程防裂措施提供理論依據。
  18. The typical mathematical model of hydraulic culvert and sluice is thoroughly studied. by using the fem program, the model is analyzed. the different conclude can be drawn from using the engineering measures or not using them

    對水工涵閘工程混凝土的典型數學模型進行了深入的研究,並應用有限元計算程序對數學模型進行分析,比較了採用和不採用各種工程措施的不同的結果,得出採用相應的工程措施帶來的防裂效果,為實際工程採用何種工程措施提供有益的參考。
  19. A 3 - d simulative calculation program concerning temperature field and creep stress field and its pre - processing and post - processing has been developed. by applying this program, temperature field and creep stress field of hydraulic culvert and sluice engineer concrete is simulated. 2

    開發了非穩定溫度場和應力模擬計算的三維有限元計算程序及有限單元法的前後處理程序,運用此程序對水工涵閘工程混凝土進行了溫度場和應力場的計算分析,得出相關結論。
  20. The crack problem of hydraulic culvert and sluice engineering concrete is rather thoroughly studied in the present paper. concluded the shape of crack, analyzed the mechanism of cracking, and researched on the engineering measure for prevent from the cracking in this paper. mathematical model for kinds of engineering measures is calculated ; results from all kinds of measures are obtained

    本文就水工涵閘工程混凝土的裂縫問題進行了詳細的研究,總結了裂縫的形式,分析了裂縫的形成原因,對控制裂縫的工程措施進行了深入的研究,運用數學模型對種種工程措施進行計算,量化分析其效果。
分享友人