cut-of date 中文意思是什麼

cut-of date 解釋
截止日期
  • cut : vt (cut; cutting)1 切,割,截,斬,砍(樹),剪(發等);切斷,割下;採伐;剪下;修剪,刈。 I h...
  • of : OF =Old French 古法語。
  • date : n 1 日期。2 時期;時代,年代。3 〈美口〉(和異性的)約會;〈美俚〉約會的對象。4 〈口語〉同日;本...
  1. In cradle while cut down divides low - grade forest, notice to do authority of nice area branch and low layer vegetation clear the job, can reduce rat already kind concealment place, destroy mouse kind live condition, reduce rat kind density, can reduce miscellaneous bush to wait again at the same time right young forest competition, those who be helpful for forest is hale grow and shift to an earlier date closing cheng lin, the forest land after yu ren is shut goes against rat kind habitat, can rise to control rat to feel the effect that produces greatly

    在撫育伐除劣等林木的同時,注重做好地面枝權及低層植被的清理工作,既可減少鼠類的隱蔽場所,破壞鼠類生存條件、降低鼠類密度,同時又能減少雜灌木等對幼林的競爭,有利於林木的健壯生長和提前郁閉成林,郁人閉后的林地不利於鼠類棲息,可以起到控制鼠害大發生的作用。
  2. Be aimed at the characters of fluvial layered pool, such as serious intrastratal and interlayer heterogeneity, small water flooding volume and low oil displacement efficiency in its high water - cut stage, the fine research work on reservoir heterogeneity model are carried out, and the research is done on the base of geological, logging, production testing materials and production date and with a center of the research of remaining oil. the west 7th block, gudong oilfield is in case. the forming mechanisms of remaining oil and its distributing feature in this area are revealed

    本文針對我國陸相沉積層狀油藏層內及層間儲層非均質性嚴重、高含水期水驅波及體積小、驅油效率低等特點,以剩餘油研究為中心,藉助于數學地質統計及聚類分析等方法,綜合利用孤東七區西的地質、測井、生產測試資料和生產動態信息等,深入開展了儲層非均質模型的精細研究,揭示了在不同規模非均質模型上剩餘油的形成機理和分佈特徵。
  3. If you add to or upgrade your subscription, cleverlearn will provide you a pro rata credit based on the total number of days that lapsed from your old cut - off date to the date the change or addition of your new subscription is effective

    如果你增加或是更新定購內容。 cleverlearn會根據你的新的訂購周期和舊的周期之間的相差天數為你提供相應的費用信用。
  4. In the general objective of the curriculum, some of the old objective has been adjusted or deleted while some new added. in the curriculum content, some of the out - of - date or rather complicated content has been cut out or modified again, and some new have been offered which represent the latest achievement in mathematical research in modern times, while the organization form of curriculum content has been adjusted, too. in the content objective, the requirement level of the objective has been adjust universally, and some new types of the objective have been brough into

    在課程目標方面, 《標準》補充、調整或刪除了一些目標;在課程內容方面,在對部分內容以及內容的組織編排方式進行重新處理的同時,刪除了一些陳舊的、繁雜的內容,補充了一些反映近現代數學發展的內容;在內容目標方面,補充了新的目標類型,大面積調整了目標的水平要求。
  5. We intend to adopt the date of enactment of the bill as the cut - off date and the estate in cases involving deaths after that date will not be subject to estate duty

    目前的構思是以法例通過日期為界線,所有在該日期后發生的去世個案均不用繳付遺產稅。
  6. Gifts offered in specific promotion period must be claimed by filling in the required information below and mailing the invoice copy ( with valid purchase date ), and the serial number barcode label ( s ) ( pl ase cut out from box package ) to fuji xerox printers within 30 days after purchase of products

    換領特定產品于優惠期內附送之禮品或禮券,請于購買產品后30天內填妥下列所需資料,連同發票影印本(需附有效購買日期) ,及盒上的機身編號標簽(請從盒上剪下)寄回本公司登記
  7. Gifts offered in specific promotion period must be claimed by filling in the required information below and mailing the invoice copy ( with valid purchase date ), and the serial number barcode label ( s ) ( please cut out from box package ) to fuji xerox printers within 30 days after purchase of products

    換領特定產品于優惠期內附送之禮品或禮券,請于購買產品后30天內填妥下列所需資料,連同發票影印本(需附有效購買日期) ,及盒上的機身編號標簽(請從盒上剪下)寄回本公司登記
  8. By comparing the cut timber at puebloan sites with the tree - ring records for the area, archaeologists can often date the occupation of the settlements quite precisely

    考古學者比較了普布羅遺址發現的木材與當地的樹木年輪記錄,可以推算人類居住在那兒的年代,結果往往相當精確。
  9. 19. the purpose of announcing a commencement date for a project is to provide a cut - off date for determining ex - gratia payments to affected property owners and tenants and also for determining rehousing eligibility for affected tenants

    19 .公布有關項目的開始實施日期,目的是為訂出一個截算日期,用以決定受影響業主及租戶可以領取的特惠津貼,以及決定受影響租戶是否符合安置的資格。
  10. In the event that you add or change serviceplans, your subsequent cut - off date will be based on the date the change or addition of new serviceplan is effected

    如果你增加或更改服務內容,截止日就以新的開始日為標準。
分享友人