cut-off station 中文意思是什麼

cut-off station 解釋
切割區
  • cut : vt (cut; cutting)1 切,割,截,斬,砍(樹),剪(發等);切斷,割下;採伐;剪下;修剪,刈。 I h...
  • off : adv 1 〈運動〉向那邊,隔開。 be off 走,去,逃。 I must be off 我得走了。 Where are you off to 你...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. Experiments have failed in the process of debugging station fire mode of the first opening segment of guangzhou metro line 3, the main reason is the delay protect module of wind valve which cut off power supply

    摘要廣州地鐵3號線首通段車站火災模式調試過程中,出現火災模式執行失敗,主要原因在於風閥延時保護模塊動作切斷電源。
  2. ( 3 ) the optimized strategy analysis on retrieval of gps water vapor the optimized strategy analysis on retrieval of gps water vapor has been carried out under different data processing schemes by using gps observation. the parameters selection problem has been resolved in gps water vapor retrieval process such as the optimum number of adopted igs stations, the relation between single station processing and united station processing, network layout, cut - off angle, zenith delay parameter, period, knot position and so on

    ( 3 ) gps水汽反演優化策略分析利用gps觀測數據,使用多種數據處理方案,進行gps水汽反演優化策略分析,初步解決了進行gps水汽反演中引入igs站的最佳個數、單站解算和聯合解算的關系、網路布局、截止高度角、天頂延遲參數、時段長度、節點位置等選擇問題。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. Research on retrieval of gps water vapor and method of rainfall forecast are keen field which draws all attention from wide world. the dissertation is accomplished on the basis of sino - italy collaborative project - ' the integral system of flood risk programming, monitoring and real time forecasting " and the primary achievements and conclusion reached include : ( 1 ) a reasonable design has been made for gps water vapor monitoring network according to the theory of gps satellite signal propagation and vertical distribution of water vapor and local synoptic characteristic of binjiang basin, the effective area where water vapor can be detected by gps station has been determined under different cut - off angles. the conclusion has been reached that 3 ~ 4 gps receivers are enough for water vapor monitoring in binjiang basin

    Gps水汽反演和降雨預報研究是當前氣象遙感應用的一個前沿探索領域,本論文依託于中意科技合作項目「洪水風險規劃、監測和實時預報的集成系統」 ,主要成果體現在以下方面: ( 1 )提出了一個合理的gps水汽監測網設計方案根據gps衛星信號傳播原理和水汽垂直分佈規律以及流域天氣的地方性特徵,確定了不同高度截角下一個gps站所能測定大氣水汽含量的有效范圍,得出了濱江流域只需要3 4個gps接收機就足以反映流域水汽變化的結論。
分享友人