dead loads 中文意思是什麼

dead loads 解釋
靜載荷
  • dead : adj 1 死的;無生命的,無生物的。2 無感覺的。3 (炭等)已熄滅的;無生氣的,呆滯的,停頓的;冷落的...
  • loads : 貨載量裝載大量
  1. She has it most every day - dead loads of it. and she ll be awful glad to have us.

    她有冰淇淋,幾乎每天吃多得不得了,我們去,她一準喜歡得要命。 」
  2. To evaluate fracture instability, the total sum of stresses due to residual welding or rolling stresses, dead load, and live loads must be considered.

    計算斷裂失穩性時,必須考慮焊接或軋制殘余應力,恆載應力和活載應力之總和。
  3. Modeling the general solid web continuous box girder and opening - in - web ( open web ) continuous box girder by ansys finite element modeling tool, node stress of governing section and corresponding shear lag values are analyzed. the solution is validated by comparing with variational results and modeling test values. based on the model, the section shear lag induced by dead load, prestress tendons and car loads under the most unfavorable condition and lateral symmetry are also approached. the influence of shear lag effect in double - level continuous box girder is considered with opening - in - web and the web location. the analysis indicates that double - level - load arouses less shear lag effect than one - level - load. when self - weight and prestressed tendons act on together, the shear lag effect on box girder take on a evidently change

    基於所建立的有限元模型,本文分別對實腹和腹板開孔兩種箱梁在恆載、車載、預應力荷載作用時,各主要截面的剪力滯效應進行分析,通過施加縱向最不利的和橫向對稱的車輛荷載,研究實腹連續箱梁和空腹連續箱梁在承受雙層荷載和單層荷載時引起的剪力滯效應,並考慮腹板開孔及開孔位置對于連續箱梁剪力滯效應的影響。分析表明,雙層車載對于箱梁引起的剪力滯系數比單層車載的影響要小,對于箱梁中存在引起的剪力滯后現象有一定的改善作用。
  4. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  5. A two component design consisting of appropriate size and length of structural reinforcing rods and dead - end component is required to transfer axial tensile loads and distribute radial compressive forces through the plastic jacket and onto the internal strength members without damaging the fragile plastic jacket or internal optical fibers

    螺旋預絞絲結構不僅能有效地降低配合區域內光纜單位應力和避免應力集中,傳遞軸向張力,而且將預絞絲的徑向壓力均勻地分佈在這段較長的配合區域內。
  6. Loads are commonly applied with universal testing machines, hydraulic cylinders dead weights, or some form of pressure.

    通常是用萬能試驗機、液壓缸重物或某種形式的壓力施加載荷。
  7. Author also stressly calculates plane deformations of skew girder bridge due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and vehicle loads in different places, and thereby analyses the characteristics of plane movement for the skew girder bridge

    作者還著重對斜梁橋的二期恆載、混凝土收縮、徐變、溫度變化和不同位置汽車荷載作用下的平面變形進行計算分析,由此分析斜梁橋的爬移特點。
  8. Abstract : the results of hi - lo strain - gauge test on 9 dead - load testing piles are analyzed. the bearing strength of single piles is evaluated preliminarily by using high strain and low strain process and conditions for correlating dynamic and dead loads and technical factors affecting the test accuracy are discussed

    文摘:通過對一組靜載試驗樁高低應變動測結果的分析,對高應變法、低應變法檢測單樁承載力的可靠性作出了初步評價,並對動靜對比成立的條件及影響其測試準確性的一些技術因素進行了探討。
  9. Loading for buildings - code of practice for dead and imposed loads

    建築物負載設計.固定負載和施加載荷實用規程
  10. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  11. Ricardo tubbs is urbane and dead smart. he lives with bronx - born intel analyst trudy, as they work undercover transporting drug loads into south florida to identify a group responsible for three murders

    Ricardo tubbs占飾是位聰明絕頂的神勇幹探,他與情報分析員trudy娜飾一起假扮毒販,只為調查一個與三宗謀殺案有關的組織。
  12. This paper took the xiamen haicang suspension bridge as the example, finished building the whole - bridge 3 - d model and static analysis of the bridge under dead and live loads with the all - function fem software. according the analytic process, the following conclusions are obtained : 1

    在此基礎上,結合廈門海滄懸索橋工程實例,採用通用有限元軟體,完成了該橋的全橋三維有限元建模,並且進行了成橋恆、活載作用下的靜力分析。
  13. Basing on wenhui bridge ( the cable - stayed bridge ), optimization of cable tension under dead loads, control of the course of cantilever casting concrete, and spatial analysis of the pylon and gird during construction were discussed in this paper

    本文以文暉大橋為背景,就恆載索力優化、懸澆過程式控制制及索塔和主梁分段施工過程的空間分析等問題進行研究。
  14. Standard practice for determination of dead loads and live loads associated with green roof systems

    測定新暴露頂板系統相關靜負荷和動態負荷的標準實施規程
  15. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
  16. By fully analysis of two real cable - stayed bridges, following conclusions have been reached : 1 ) under dead loads the sag of inclined cable stayed is the main point of geometric nonlinear behaviors of cable - stayed bridges, and the effects of the interaction of large bending and axial deformation in bending members and the large displacement are relatively small

    通過理論分析和實例計算,本文得出以下結論: 1 )在恆載作用下,斜拉索的垂度效應是幾何非線性的主要來源,組合效應、大變形效應的影響相對較小,若僅僅進行線性分析,則計算所得結果的誤差會很大。
  17. 2. specimens ’ cracking loads under dead - load have been calculated based on the tension model of ordinary concrete. the calculating value is larger than the testing value by 29 % to 37 %

    2 、按照普通混凝土的受拉本構模型計算試件靜載下的開裂荷載,計算值比實測值大29 % 37 % 。
  18. Well, we ve tried jackson s island a little, and we can try it again some time ; and there s the old ha nted house up the still - house branch, and there s lots of deadlimb trees - dead loads of em.

    哼,我們已經在傑克遜島上找過一陣子了,以後什麼時候,我們可以再去找找。在鬼屋河岸上,有間鬧鬼的老宅,那兒還有許許多多的枯樹多得很呢。 」
分享友人