deck structure 中文意思是什麼

deck structure 解釋
艙面建築
  • deck : n 1 甲板,艙板;覆蓋物。2 【建築】平屋頂;橋面;【鐵路】客車車頂。3 〈俚語〉地面,地。4 〈主美〉...
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. Crack - control of aeolotropic hollow slabs in orthogonal in - site concreting deck floors in the construction of large - pillar - net structure of reinforced concrete

    大柱網現澆混凝土框架正交異性空心大板樓蓋的裂縫控制
  2. It is a new form of the structure of the steel deck bridge

    在橋梁工程中,它是鋼橋橋面結構的一種新形式。
  3. It calculate 60 driving speed kilometers / hour, it design 30 kilometers of speed of deck bridges road, ground of offices / hour, road calculate and load type standard cars standard bzz - 100s, iron do distance to city one for new urban north and southses by mountain path by road surface structure, calculation 40 driving speed kilometer / hour

    計算行車速度60公里/小時,跨線橋處地面道路設計車速30公里/小時,道路路面結構計算荷載標準bzz - 100型標準車,鐵山路為新城區南北向城市次幹路,計算行車速度40公里/小時。
  4. The approach ramp is a double deck roadway structure.

    該引橋坡道是雙層公路橋。
  5. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大橋為工程背景,對組成橋面板系的多排懸臂鋼-混凝土組合梁的受力特點進行了研究和探討。
  6. This inland river fire boat is made of steel, all - welded structure, single deck, single bottom, double engines, double propellers, double rudders, round bilge lines and transverse framing

    35 . 0m本船為鋼質全焊接結構單甲板單底雙機雙槳雙舵圓舭型線橫骨架式內河消防船。
  7. The ship ' s hull is a thin - walled box girder structure composed of stiffened panels. the overall failure of a ship hull girder is normally governed by buckling and plastic collapse of the deck, bottom, or sometimes the side shell stiffened panels. therefore, the analysis of buckling and ultimate strength of ship panels in deck, boltom, and side shells is very important and necessary for the safety assessment of ship structure. in stiffened panels, local buckling and collapse of plating between stiffeners is a basic failure mode, and thus it would also very important to evaluate the buckling and ultimate strength interaction of plate elements under combined loads

    船體梁的總體失效通常取決于甲板、船底板,有時候是舷側加筋板的屈曲和塑性破壞。因此,對于衡量船體結構的安全性而言,對甲板、底板、舷側板進行屈曲和極限強度分析是十分重要且必須的。對于加筋板而言,加強筋間的板格之局部屈曲和失效是最基本的失效模式。
  8. The prestressed continuous beam - arch composite bridges are a special structural system where the horizontal thrust of the arch rib is absorbed by a prestressed tie at deck level. in some cases, this type of structure is preferable because it does n ' t have the large thrust at the spring hi traditional arch bridges and the somewhat large bending moment and shear force in traditional beam bridges. as a result, the performances of the prestressing reinforcement can be efficiently utilized

    它利用拱肋承擔壓力,系梁預應力束抵抗拱端推力,吊桿及縱橫橋面系結構承受橋面荷載,既克服了傳統拱橋巨大的拱端推力,又改善了連續梁橋較大的彎矩和剪力的受力狀況,最大限度地發揮了拱梁混凝土和預應力鋼筋各自的特點,經濟效益顯著。
  9. The bridge structure not only cancels the deck joints, but also road joints

    這種橋梁結構不僅取消了橋面接縫,也取消了路面接縫。
  10. As a result of increasing bridge span, deck flexibility and structure complexity, earthquake analysis of long span cable - stayed bridge becomes one of the most concern and challenge problems in bridge engineering field

    隨著橋梁跨度、橋面柔性和構造復雜性的增加,大跨度斜拉橋的地震動研究已經成為橋梁工程界最關心、最具有挑戰性的課題之一。
  11. Mechanism analysis of concrete bridge deck disease and study on composite pavement structure

    橋涵橋面混凝土鋪裝與復合鋪裝結構設計
  12. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在收集有關拱橋及動力學資料的基礎上,分析了拱橋動力學的解析分析法和有限元數值分析方法的優缺點,同時以瀑布溝大橋為背景,使用ansys軟體建立了空間有限元模型,實施了橋跨結構的自振特性分析;並分析了考慮到模型簡化過程中部分結構參數取值差異、橋面板的約束狀況不同等因數對自振特性結果的影響;此外還對橋面上的橫撐布置不同導致對自振特性的影響作了分析。
  13. 4. the side girders, the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time

    4 、金馬大橋在施工過程中採用邊主梁、橫隔梁和橋面板三部分分階段一次現澆。
  14. This vessel is a fast fishery management ship made of steel, round bilge, single continuous deck, longitudinal framing, all - welded structure, double propellers and double rudders, c w certain weapon executing the fishery management and supervision along guangdong coasts. main engine model kta38 - m

    本船主船體為鋼質,圓舭單層連續甲板縱骨架式焊接結構甲板室為中后機雙槳雙舵小型高速艇型的高速漁政海監管理公務船,用於廣東省沿海執行漁政海監管理任務,配備一定的武備。
  15. This small fast boat is made of steel, round bilge, single continuous deck, longitudinal framing all - welded structure, five propellers, four rudders with aluminum - welded deckhouse

    本艇主船體為鋼質圓舭單連續甲板縱骨架式焊接結構,甲板室為鋁合金焊接五槳四舵小型高速艇船型。
  16. This paper developed a micro angular rate gyro based on micro piezoelectric ceramic rod structure instead of the sensitive double - deck structure as well as piezoelectric ceramic strain foils, and designed a phase - sensitive detection circuit

    摘要研製了基於微型壓電陶瓷棒結構代替雙敏感梁結構及壓電陶瓷片的微型角速率陀螺,並設計了相敏檢波電路。
  17. In view of geological and hydro - geological situations of the south anchor runyang yangtze river highway bridge, the paper bring forward mathematical model and calculation method of double deck structure groundwater, which can be used to lively calculate every layer ' s water table, so that we can realize every layer ' s settlement calculation and control ; establish the inter relationship between non - linear physical - mechanics parameter and hydro - geological parameter, objectively describe the non - linear change process of the porosity, hydraulic conductivity, specific storativity in the process of soil dewater and concretion

    針對潤揚長江公路大橋南錨場地地質、水文地質條件提出了雙層結構地下水運動的數學模型和計算方法,該方法可以實時計算出各分層的地下水位,實現了各分層沉降計算與控制研究;建立了土層非線性物理力學參數與水文地質參數之間的內在聯系,客觀地描述土層降水? ?固結過程中孔隙度、滲透系數和貯水率等參數非線性變化過程。
  18. Suspended deck structure

    承臺結構
  19. Provision of architectural lighting to illuminate both side faces of the deck structure across deep bay in the hksar section of hong kong - shenzhen western corridor hk - swc constructed under contract no. hy 2002 21

    在合約hy 2002 21建造之深港西部通道香港段橫跨海灣部份橋側裝置景觀照明。
  20. The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement, forecast and control the distortion of the soil in the pit, engineering construction and design

    潤揚長江公路大橋南錨基坑工程降水計算表明,雙層結構模型為深基坑降水與沉降的非線性耦合計算,基坑土體變形預測、控制,工程施工和設計提供了新的計算分析途經。
分享友人