demand meter 中文意思是什麼

demand meter 解釋
需求計量表
  • demand : vt 1 要求,請求;需要。2 詢問,盤問,追究。3 【法律】召喚。vi 要求,查問。 ★後面子句中的動詞,美...
  • meter : n. 1. 測量儀表,計量器;計,表。2. 計量人;計量官。vt. 用表計算[測量、記錄]。n. 〈美國〉= metre.
  1. Meter with maximum demand indicator

    最大需量電度表
  2. To prepare international standards for electrical energy measuring and electrical load control equipment ( such as watt - hour meters, var - hour meters, maximum demand indicators, telemetering for consumption and demand, equipment for remote meter reading, time switches, equipment for the control of loads and tarifs and consumer services ) including the equivalent electronic forms of these devices and their accessories

    負責制定電能測量和負荷控制設備(如:有功、無功電度表、最大需量指示器、損耗和需量的遙測、遠程抄表設備、時間開關、負荷和費率控制設備及用戶服務等)的國際標準,包括功能相近的運用電子技術實現的設備及其附件。
  3. Thermal demand meter

    溫差式最大用電功率計
  4. Cumulative demand meter

    累計式最大需要電量計
  5. Biochemical oxygen demand meter for seawater

    海水生化需氧量測定儀
  6. Aiming at the demand for the wireless data transmission using the public mobile network and the need of the wireless meter reading system, the gprs ( general package radio system ) wireless data transmission terminal used as the wireless channel for data transmission was designed and applied to the wireless meter reading system

    本文針對目前利用公網進行數據通信的需要,以及無線抄表系統的需求,設計了該gprs無線數據傳輸終端,用作無線數據傳輸的通道,並最終實現了該gprs無線數據傳輸終端在無線抄表(電表)系統中的應用。
  7. The history and present situation of electric measuring instrument and features of intelligent meters are introduced in this paper. a brand - new scheme of intelligent electric parameter meter is proposed by the author after combining the features of intelligent meters and practical demand for electric measuring in 300mw generator units. general design, realization of hardware circuit comparison and analysis of errors of different algorisms are discussed in detail

    本論文介紹了電測儀表的發展歷史與現狀,以及新興智能儀表的特點;結合智能化儀表特點和300mw發電機組電參數測試的實際需要,首次提出了一種智能型發電機組電參數綜合測試儀的研究方案;詳細敘述了該智能型綜合測試儀的總體設計,硬體電路實現,各種演算法的比較的誤差分析;以及軟體框圖設計,針對影響測量精度的因素進行了分析,並制定了改進措施。
  8. Meter with maximum demand recorder

    帶最大需量記錄頗積算表
  9. Metered parking spaces, with electronic parking meter charging in operation mainly between 8 am and midnight from monday to saturday. meter charging in areas of high demand has been extended to include sundays and public holidays to better ration the use of the parking spaces

    個,收費時間主要為星期一至六上午八時至午夜十二時。在泊車位需求殷切的地區,停車收費表在星期日和公眾假期也會收費,讓更多駕車人士有機會使用泊車位。
  10. The operation result showed that with a solar collector of 20 square - meter, the cooling capacity of the solar ejector refrigeration system could meet the demand of a living house of 60 to 70 square - meter ( when the booster was present ) or of 20 to 30 square - meter ( when the booster was absent ) from 10am to 4 pm

    模擬運行結果表明,採用20m ~ 2平板真空管集熱器,太陽能噴射式製冷系統從上午10點運行到下午4點期間,可以滿足供60 ? 70m ~ 2 (採用增壓器)或者20 ? 30m ~ 2 (不採用增壓器)住宅空間製冷空調要求。
  11. According to the demand and our reality, agl32, with the precision of meter, is enough for pa. but its price is high, in order to find a more economical way. the paper suggests a way of data - after cure to increase the precision of gps. ways to increase precision, such as arithmetical mean and implant control point, were studied and their principles and characters were analyzed and discussed

    結合農業生產的實際需求和我國的現實國情,認為達到亞米級測試精度的ag132已能夠滿足精細農業的要求,但由於其價格昂貴,提出在能滿足農業生產精度要求的前提下,需要尋求更經濟的gps定位解決方案,即利用更經濟的gps達到精細農業所要求的精度,從而達到降低農業生產成本的目的。
  12. All range voltage, ampere meter, can suit the demand of customer

    任意量程的交直流電壓、電流表均可按用戶要求供貨。
  13. The paper acts according to this kind of actual demand, refers to other radio frequency module automation test systems, designed the power amplifier module automation test system. this system includes computer, radio frequency instrument, test veneer, ampere meter as well as each kind of conjunction cables

    針對這種現狀,利用現代射頻儀器儀表對gpib的支持,依託控制類晶元的強大功能,以計算機作為自動化測試和控制的基礎,開發了功放模塊自動化測試工具。
  14. Meter charging in areas of high demand has been extended to include sundays and public holidays to better ration the use of the parking spaces

    在泊車位需求殷切的地區,停車收費表于星期日和公眾假期也會收費,讓更多駕車人士有機會使用這些泊車位。
  15. Meter charging in areas of high demand has been extended to include sundays and public holidays to facilitate a better turnover of parking spaces

    在泊車位需求殷切的地區,停車收費表于星期日和公眾假期也會收費,讓更多駕車人士有機會使用這些泊車位。
  16. Cod automatic chemical oxygen demand meter

    化學氧消耗量
分享友人