detailed load analysis 中文意思是什麼

detailed load analysis 解釋
明細負載分析
  • detailed : adj. 1. 詳細的,明細的。2. 錯綜復雜的,千頭萬緒的。
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的布置等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  2. Abstract : the time - variant reliability analysis of ship hull girders subjected to the deg r adations of fatigue and corrosion is quantitatively carried out in this paper. th e analytical formulations are derived and simple program is compiled. as a case s tudy, the time - variant reliability of a vlcc tank is calculated. it shows that th e degradation effects of fatigue and corrosion are very important for the load - c a pacity calculation of thsip hull girders. after the second special inspection ( 10 years ), the detailed inspection should be done in order to guarantee the safety of ship navigation

    文摘:定量考慮船體構件疲勞裂紋擴展和環境腐蝕對船體梁承載能力的雙重衰減因素的影響,對船體梁的時變可靠性進行了分析,列出了時變可靠性分析公式並編制了相應的計算程序.以一艘大型油船的結構可靠性為例,表明疲勞裂紋和環境腐蝕在第二個特檢年( 10a )之後對船體梁承載能力有顯著的影響,此時開展詳細的船體結構檢查對保證船舶營運的安全性具有重要的意義
  3. With the example of beijing yingu building, gives all - year hourly dynamic load calculation results and makes detailed analysis, which will provide quantitative guidance for system division, operation and energy management of air conditioning systems

    摘要以北京銀谷大廈辦公樓為例,介紹了全年逐時動態負荷計算的結果,並對其進行了詳細分析,為指導空調系統的分系統設計、空調運行與能量管理提供定量的依據。
  4. The distribution gis data management methods and its application in distribution running are systematically researched, which compose distribution gis network topology analysis ( nta ) and optimal rush - maintain path ( orp ), and distribution planning, which composes distribution spatial load forecasting ( slf ) : ( 1 ) with systematic analysis on the relationship between spatial data model and spatial data structure, the distribution feature and the two common gis data models are analyzed, which are vector and raster data models. then the conceptual and logic data models of distribution gis are designed. the spatial data storage structure is given by using vector method, and their detailed data management methods are proposed

    ( 4 )將gis的空間信息分析功能應用於配網空間負荷預測( saptialloadforecasting , slf )的研究:綜合利用灰色理論及遺傳規劃的優點,提出了一種根據饋線的歷史峰值負荷進行外推的組合slf法:首先採用負荷轉移耦合法來修正負荷歷史,消除由於負荷轉移引起的誤差;然後根據實際饋線路徑和配網gis圖形分層,運用圖層疊加分析得到饋線的實際供電范圍;接著採用灰色關聯度聚類方法對饋線負荷增長曲線進行聚類分析;最後採用遺傳規劃來對灰色聚類結果進行符號回歸,分別得到每一類曲線的最佳擬合曲線形式。
  5. Based on the strain history information obtained from monitoring of bridge operation state, and through detailed analysis of influential line shapes of measurement points on the bridge, a bwim ( bridge weight in motion ) method, the single - acme acutance method that can identify passing vehicle load, is established

    摘要基於橋梁運營狀態監測得到的應變歷程數據,通過對測點影響線形狀的較深入分析,建立了識別過橋車輛荷載的一種bwim方法「單峰銳度法」 。
  6. Mmog usually adopts multiple servers cluster to do with avatar ' s request. but its tussle and walk makes servers over - loaded. this paper presents a dynamic load balancing algorithm between local and global algorithms, which is called finding less - loaded server algorithm, and has a detailed analysis of the algorithm. it is useful for over - loaded servers to find less - loaded ones, and keeps game ' s real - time and consistency

    Mmog中常採用多臺服務器集群的結構來處理玩家的請求.但是,玩家在游戲中的走動、打鬥,常常使某些服務器超載.本文提出了一種介於局部和全局的輕載服務器尋找演算法,並對演算法進行詳細的分析,使超載服務器能在短時間內找到合適的輕載服務器,保證了系統的實時性、一致性
  7. Based on the detailed analysis of the existing power system in ali area and its geological conditions, as per the population and economic growth history and future development targets in this area, in this paper, a prediction of power consumption volume and power load needed in ali area in next 15 years made by using index growth model and artificial neural network

    本文在詳細分析阿里地區電力系統現狀及所處自然地理條件的基礎之上,根據阿里地區人口、經濟增長歷史及未來發展目標,採用指數增長模型和人工神經網路模型對阿里地區未來15年內用電量及用電負荷作了預測。
  8. 3 days prior before any heavy ( 75 % of the max. allowed working load ), duel, or long radius lift or a lift in close proximity to power lines a detailed job safety analysis ( jsa ) must be submitted to the construction manager or his nominee

    在進行重物(最大提升負荷的75 % ) 、採用2臺起重機同時進行起重提升,或在起重機距離貨物較遠,或距離動力線較近的地方進行提升時,必須提前3天向現場施工經理或其指定人遞交一份詳細作業安全分析報告。
分享友人