development test station 中文意思是什麼

development test station 解釋
實用化試驗臺
  • development : n. 1. 發展,發達;進化。2. 展開;擴充;開發。3. 發達物,新事物,發展階段。4. 【生物學】發育(史);【軍,數】展開;【攝影】顯影,顯像;【音樂】展開(部);研製,研製成果。
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. A detailed introduction was made to the properties of the wet coated sand suitable for multi - station shell mould shooting machine ; the development of a sort of high strength coated sand with low resin content : the shaping index and wetness adjusting process : analysis and prevention of peel back defect of shells made with overturning hopper process ; test method of peel back resistance of coated sand : pinhole defect analysis of high ni ductile iron shell mould castings and application of anti - pinhole coated sand

    詳細介紹適用於吹砂式多工位殼型機的濕態覆膜砂性能;高強度低樹脂量覆膜砂的研製;濕態殼型覆膜砂的成形性指數與調濕工藝;翻鬥法制殼時的脫殼問題分析和解決辦法;覆膜砂脫殼性檢測方法;高鎳球鐵件殼型鑄造表面針孔原因分析與抗針孔覆膜砂的應用。
  2. Their detailed names are : ( 7 institutes ) guizhou karst resources environment and development research center, guizhou biological research institute, guizhou physical test & chemical analysis center, guizhou metallurgical and chemical engineering institute, guizhou new technology research institute, guizhou botanical garden and guizhou new material research & development base ; ( 3 sections ) guizhou metallurgical science research section, applied mathematics research section and energy research section ; ( 2 stations ) fanjing mountain ecological work - site station and caohai ecological work - site station ; ( 3 bases ) bio research and development center of biological resources / guizhou academy of sciences, longli metallurgical and chemical industrial trial base, and songtao wuling mountains bio - diversity trial base ; ( 2 centers ) guizhou engineering composite material center and guizhou nanometer material engineering center

    即:貴州省喀斯特資源環境與發展研究中心、貴州省生物研究所、貴州省理化測試分析研究中心、貴州省冶金化工研究所、貴州省新技術研究所、貴州省植物園、貴州省新材料研究開發基地、貴州省冶金科學研究室、應用數學研究室、能源研究室、梵凈山生態定位工作站、草海生態工作站、貴州科學院貝科生物資源研究開發中心、龍里冶金化工試驗基地、松桃武陵山生物多樣性試驗基地、貴州省工程復合材料中心、貴州省納米材料工程中心。
  3. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
分享友人