discharge head 中文意思是什麼

discharge head 解釋
遲送水頭
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  • head : n 1 頭,頭部,首。2 頭腦,才能;智力,想像力,理解力。3 前部,上部;頂端,尖突部;船長;(書頁等...
  1. Equally effective in checking back flows from head pressure on the discharge or suction sides of pump

    無論是泵的排泄口的排出壓力,還是泵的吸入口,其流體止回的效果都是相同的。
  2. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響
  3. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  4. Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally

    文摘:從理論上和實踐上,對低水頭電站超聲波測流進行了較為詳細的研究,並以某水電站為例,對測流斷面定位、聲路布置和面積積分給出了一般方法
  5. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  6. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  7. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  8. For the low water head water control project at a branching channel, its flood discharge capacity is related not only with the total discharge width but also with the discharge width ratio of the two branches

    摘要位於分汊河段的低水頭樞紐,其泄洪能力不僅與樞紐的總泄流寬度有關,而且與兩汊泄流寬度之比有關。
  9. The impulse type turbines are the best election for high head and small discharge hydraulic power resources. they have compact structure, small size, and high efficiency and need fewer investments. they have been divided into turgo and pelton type

    沖擊式水輪機是開發高水頭,小流量水力資源的最佳機構,它具有投資小,效率高,體積小,結構緊湊等特點。該機型又分斜擊式水斗式兩種。
  10. In the darkness spirit hands were felt to flutter and when prayer by tantras had been directed to the proper quarter a faint but increasing luminosity of ruby light became gradually visible, the apparition of the etheric double being particularly lifelike owing to the discharge of jivic rays from the crown of the head and face

    在黑暗中,使人感到幽靈的手在晃動。當按照密宗經咒142作的禱告送至應達處時,一抹微弱然而愈益明亮起來的紅寶石光澤逐漸映入眼簾。從頭頂和臉上散發出來的吉瓦光,使得虛靈體格外逼真。
  11. This paper gives a description of discharge tube, mirror, laser head and laser power supply of an air cooling argon laser which output is over 1w, and shows its properties

    介紹輸出功率超過1w的風冷氬離子激光器的放電管、反射鏡、激光器頭部和激光電源的設計考慮,給出了它的性能。
  12. So far as the aqueduct with large discharge and lower head is concerned, the non - uniform flow will occur in the aqueduct, when the discharge is enlarged after the water - carrying section being determined based on the design discharge and the given head ; for which the flow condition must be presumed, so as to determine the water surface profile

    摘要大流量低水頭渡槽根據設計流量和給定水頭確定過水斷面后,通過加大流量時,渡槽內就會發生非均勻流,需對這種水流情況進行推算,以確定渡槽在通過加大流量時的水面線。
  13. Research on elastic slab vibration of inverted arch plunge pool under high water head and large discharge

    高水頭大流量作用下反拱水墊塘彈性單底板塊振動規律研究
  14. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  15. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文的存在抬高了水面線的位置,其中在閘墩頭部尤其明顯;墩型對流量系數和壩面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的流量系數和更小的壩面壓力:不同的墩厚閘寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓力降低,而當t / b二0 . 2時溢流壩具有更大的流量系數。
  16. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  17. 2. an optimal decision - making model for water resources scheduling of large - scale scheduling district is set up. it can provide a method to achieve maximum net revenue with a fixed service discharge from canal head and a fixed pumpage of pumping station

    建立了大型灌區水資源優化調配決策模型,研究在灌區渠首供水能力和泵站提水能力一定條件下,將灌區水資源如何調配才使得灌區總凈收益達到最大值的優化決策問題。
  18. Ctc maximum head is suitable for pump discharge to butanol handling facility

    用戶確認泵出口去丁醇處理裝置的最大揚程是合適的
  19. Die sinking electro - discharge machines ? ? parameters ? ? part 2 : two column machines slide - head type and cross slide table type

    電火花成形機參數第2部分:雙立柱機床
  20. Die sinking electro - discharge machines ? ? testing of accuracy ? ? part 2 : two column machines slide - head type and cross - slide table type

    電火花成形機精度檢驗第2部分:雙立柱機床
分享友人