dispatching order 中文意思是什麼

dispatching order 解釋
調度命令
  • dispatching : 調度,配送
  • order : n 1 次序,順序;整齊;(社會)秩序,治安;狀況,常態;健康狀態;條理;會場秩序;議事程序,日程;...
  1. Interactive voice response based field force automation system enabling point and click service scheduling and dispatching. equipment maintenance, work order, purchase order tracking and management

    -從事高速公路收費系統智能小區管理系統vod點播系統酒店管理軟體等開發
  2. Let the electricity price approved by national authorities ofevery power plant be regarded as “ 1 ” and each power plant only reports its price percentage during price competition. the electricity net dispatching departments arrange the percentages in order and purchase the lower among them in turn. this paper also analyzes why adopting it and its advantages and some attentive questions

    通過對工程項目投標報價問題的探討,認識到投標報價是一門綜合性的行為科學,投標報價者要認真處理投標報價各階段的注意事項,各項問題不出紕漏,採取切實可行的投標方式方可在激烈的市場競爭中脫穎而出
  3. In order to find the best fabrication control combination, this paper studied rework strategies to be applied in coordination with some commonly used dispatching rules at the photolithography stage

    本文討論在微影黃光區中幾種再加工策略,並與常用的派工法則配合,期找出最適的生產控制組合。
  4. ( 2 ) theoretical analysis of optimal theory for cascade hydropower station applying decision support system to carry out rational river planning in stepped exploitation includes cascade station arrangement, selecting optimal parameters of indropower station, decision of stepped exploitation order and optimal dispatching for reservoir etc. for uncertain problems, decision support system only supplies an auxiliary decision to the decision maker, not taking the place of decision maker

    ( 2 )水電站優化調度的理論分析在梯級開發中應用決策支持系統進行合理的梯級規劃,包括梯級的布胃、水電站參數的最優選擇、梯級開發順序決策和水庫運行的優化調度等問題。在對不確定性問題上,決策支持系統給決策者只是提供輔助決策,而不是替代決策者。
  5. In this article, the author study the short - term optimization dispatching of cascaded hydropower in order to get a practicable mathematical model and arithmetic. basing on deep analysis and generalization of yilihe cascaded reservoir, the author set up a short - term dispatching mathematical model and an inner - plant economical operation model to simulate the real operation process. dynamic programming method ( dp ) is effective to solve the several problem and discrete differential dp ( dddp ) is a reduce dimension tool

    本文緊密結合雲南省境內的以禮河梯級水庫的工程實際,在對其進行深入分析和概化的基礎上,建立了反映實際問題特點的梯級電站短期調度模型和廠內經濟運行模型,動態規劃方法以其擅長求解多階段決策過程問題而被本文選為優化工具,由於dddp的降維效果顯著,從而使動態規劃在本研究模型中得以運用。
  6. Nevertheless, in the event that goods are dispatched directly to the address of a bank or consigned to or to the order of a bank for release to a drawee against payment or acceptance or upon other terms and conditions without prior agreement on the part of that bank, such bank shall have no obligation to take delivery of the goods, which remain at the risk and responsibility of the party dispatching the goods

    然而,如果未經銀行事先同意而將貨物直接發送到該銀行地址或者以該行作為收貨人或者以該行為抬頭人,並請該行憑付款或承兌或憑其他條款將貨物交付給付款人,該行將沒有提取貨物的義務,其風險和責任仍由發貨方承擔。
  7. The main idea of this hybrid algorithm is : at first, all candidates in task collection is lined according to a dispatching rule ( earliest due date, edd ), then this linear queue is divided into some tiers under a criterion that partial order is not allowed to exist in the every tier, many feasible sequences is generated by constructing a neighborhood of a initial sequence in every tier, the allocation of the resources over time is conducted to perform every feasible task sequence, and a set of approximate optimal scheduling schemes is achieved as the precondition of the next tier ’ s disposal in meeting multiple scheduling objectives to obtain the global near - optimal schedule which makes these program run tier by tier until the last task is completed

    該演算法按照最早完工時間優先( ect )分派規則,先將參加排序的工序合併成一個串列序列,然後按照同層內不存在偏序關系的原則,將其分解為若干個時間上相互銜接的層次,在每個層次內部,通過構造鄰域產生出多個可行序列,對每個可行序列進行設備配置,採用鄰域搜索演算法進行方案的尋優,保留一組滿足評價要求的可行方案作為下一層設備配置的背景環境,通過層層遞進最終獲取全局的近似最優解。
  8. In order to realize the optimum arrangement of elevators, the evaluation function and ambiguity function for dispatching elevators are established, and the optimum weight coefficients of the different factors in the estimating function are obtained with the aid of the bp neural networks self - learning function

    摘要通過構造用於派梯選擇的評價函數,在建立隸屬度函數的基礎上,利用前向神經網路自學習功能獲得評價函數中各個因素的最佳加權系數,實現最佳派梯。
  9. The unit coordinated control of coal - fired power plant is essential to the automatic generation control ( agc ). in order to get the fast load response characteristic and the stable main parameters that the power network dispatching center required, we must reconsider the existing unit coordinated control schemes by analyzing the specialty of the coal fired power plant

    燃煤電廠的機組協調控制是機組投入自動發電控制( agc )的基本條件,為了機組能夠迅速響應電網的負荷要求,同時保證機組各主參數保持相對的穩定,必須在進一步分析機組被控對象的特性的基礎上,重新研究現存機組協調控制方案。
分享友人