disposal project 中文意思是什麼

disposal project 解釋
排放工程
  • disposal : n. 1. 配置,布置,安排。2. 處置,處理。3. (財產等的)出售,讓與。4. 支配權;(自由)處置權,(自由)使用權。n. (廚房)垃圾粉碎機。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu. m. and the entire incinerator flue pipe from the sub - lower ground floor up to the 7th floor and above the roof of tang shiu kin hospital

    工程包括清拆及處理位於鄧肇堅醫院的醫療廢物焚化爐(其容量為1立方米)及整個煙道(由下層至七樓向上伸展至醫院大樓頂部之上) 。
  2. Based on the superiority of distributed database in highway project management, its distributed database is developed in the paper, including solution of data division and redundancy, design of intercurrent mechanism, system structure design and query disposal

    摘要在分析分散式數據庫對公路建設項目管理的優越特性基礎上,提出了公路建設項目管理的分佈數據庫,其中包括數據分割和冗餘問題的解決、並發控制機制設計、系統結構設計和查詢處理。
  3. Disposal measures and project investment analysis on suzhou stp wastewater sludge

    蘇州市城市污泥處置對策和投資分析
  4. 3 to minimize impacts due to improper disposal of debris, all debris shall be loaded into sandbags and be removed from site at the end of each working day during the construction and dismantling period of the project

    為減輕因不當處置垃圾造成的影響,在工程項目建造及拆卸期間的每個工作日完結前,須把全部垃圾放入沙包,然後搬離工地。
  5. Data to substantiate that there would be sufficient capacity in the disposal areas for the disposal of contaminated and uncontaminated mud generated from the project

    卸泥區的卸置容量足以應付有關工程計劃所產生污染泥料和未經污染泥料的數據。
  6. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在深入分析了風險特徵之後,將數據挖掘技術引入風險管理,用以解決海量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人工神經網路( ann )兩種方法;接著,論文對風險識別、風險評價、風險處理中的風險管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了風險管理的特點;最後,論文對信息系統( mis )在工程項目風險管理中的應用進行了探討,開發出一個風險管理信息系統。
  7. Disposal project of refuse dump in dalian

    大連市毛塋子垃圾場滲濾液處理工程
  8. The project mainly concentrated to catch water system of the north, resume the disposal ability is 60, 000t per day, rehabilitate the traditional techniques of wastewater disposal by latest national or international techniques, change the noisy and old facilities, and increase the amount of dirty mud disposal system and inspection system

    重點是廠外建設南線污水截流系統,恢復日處理量6萬噸的能力,廠內利用國內外的先進污水處理技術改造傳統的污水處理工藝,更換耗能大噪聲大陳舊的設備,增加污泥處理系統和監測自控系統。
  9. A former site administrator of the main contractor for a redevelopment project at wang tau hom estate was sentenced to 120 hours of community service for conspiracy to defraud the housing department in relation to the disposal of non - compliant reinforcement steel bars at the site

    橫頭?重建計劃總承建商的一名前地盤總務員,訛稱已將未能通過檢定測試的高拉力鋼筋運離地盤,串謀詐騙房屋署,被判須履行一百二十小時社會服務。
  10. Based on the ana1yse of the way of the water pipe network ’ s management and the difficult problem which exist in the course of running water pipe network it presents the collectivity project of the city service pipe network geography information manage system and estab1ish the waterpipe network ’ s basic data - base, and conform afresh the network data by the mode of data - base organization. then on the base of it, open out the water pipe networks graphics show and edit, hydraulic simulation module, disposal accident module and data query andanalyse module and set up the geography information system. it will exert the network ’ s data - base and computer effect on the city water management

    在對目前給水管網管理方式以及管理過程中碰到的問題進行分析的基礎上,給出了城市給水管網地理信息管理系統的總體方案和詳細設計,同時建立了給水管網基礎數據庫,依照數據庫的組織方式對管網數據進行管理、編輯和分析,並在此基礎上,開發了城市給水管網圖形顯示、圖形編輯、水力模擬、管網事故處理、管網數據查詢分析和管網數據專題圖等功能模塊,建立了城市給水管網地理信息系統,以充分發揮管網數據和計算機技術在城市供水管理中的作用。
  11. " as the recent court hearing did not grant an injunction, we do not anticipate any problem with issuing permits under the dumping at sea ordinance for the disposal of contaminated mud from the project site at the east sha chau contaminated mud disposal site

    發言人說:由於法庭于最近的聆訊並沒有向該填海工程發出禁制令,我們並不預期根據海上傾倒物料條例發出許可證予該工程于東沙洲傾倒污泥會有問題。
  12. The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ssds stage i and expressed concern on the consequential delay in completion of the project

    兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。
  13. The panels discussed the recent problems encountered in the tunnelling works project under the strategic sewage disposal scheme ( ssds ) stage i and expressed concern on the consequential delay in completion of the project

    兩個事務委員會討論策略性污水排放計劃第i階段的隧道挖掘工程最近出現的問題,並對該等問題引致工程完成日期受到延誤一事表示關注。
  14. Gaoqing county wastewater treatment plant with daily disposal capacity of 60, 000 tons has been put into use ; the second - phase project is during construction

    高青縣日處理污水6萬噸的污水處理廠已投入運營,二期工程正在建設。
  15. [ wastewater disposal ] gaoqing county wastewater treatment plant with daily disposal capacity of 60, 000 tons has been put into use ; the second - phase project is during construction

    高青縣日處理污水6萬噸的污水處理廠已投入運營,二期工程正在建設。
  16. Guangzhou sludge disposal factory is a bot project, it is at hualong, paiyu, guangzhou

    廣州市污泥處理廠是一個bot項目,廠址位於廣州市番禺區化龍鎮。
  17. Abstract : the evaluation of earth crust stability is a research project prior to siting of the repository of high - radioactive waste disposal

    文摘:地殼穩定性評價是高放核廢物處置庫選址的前期研究課題。
  18. Wastewater disposal project

    污水處理工程
  19. The main business includes the following projects. 1. sewage disposal project

    1 .污水治理項目2 .工業用水項目3 .生活用水項目4 .污泥發電項目5 .秸稈發電項目
  20. According to characteristic of medical waste disposal project, various treatment processes were analysed, and several problems that should be paid attention in eia were described, in order to prevent secordary pollution to the environment

    摘要根據醫療廢物集中處置項目的建設特點,對其不同處理工藝的優缺點進行辨析,歸納並闡述了該類項目環境影響評價中應重點關注的幾個問題,以避免在處置過程中對環境和人體造成二次污染。
分享友人